4 research outputs found

    Near-field measurement of microwave active devices

    Get PDF
    A completely new near field mapping system based on micro monopole antenna has been developed in order to determine the electric near-field at the surface of MMIC. The possibilities of this innovative experimental setup are shown by 2D mapping of a bend 5 line deposited on GaAs substrate and a coupled-line filter on Duroid 6002. These are supported by 3D electromagnetic simulations. We finally give some results obtained on a real MMIC with a medium resolution of 50µm. The industrial applications are clearly the reliability issues of microwave power devices but also a new tool for MMIC designers. The knowledge of radiated near field will also contribute to optimize the packaging of microwave functions

    Status of the ESS elliptical cryomodules at CEA saclay

    No full text
    The first ESS prototype cryomodule with medium beta cavities named M-ECCTD is being assembled at CEA Saclay. The Q curves of the 4 cavities mounted inside the cryomodule are presented, and the four power couplers have been conditioned at high power before their assembly onto the cavity string. Completion of the M-ECCTD assembly outside clean room is in progress as well as the finalization of the RF power test stand preparation. RF power tests of the M-ECCTD will be performed during summer 2017. CEA is preparing the production of the ESS medium and high beta cryomodules of the series before the test of the M-ECCTD and the contracts for the procurement of the most critical components have already been signed

    Status of the ESS Elliptical Cryomodules at CEA Saclay

    No full text
    International audienceThe first ESS prototype cryomodule with medium beta cavities named M-ECCTD is being assembled at CEA Saclay. The Q curves of the 4 cavities mounted inside the cryomodule are presented, and the four power couplers have been conditioned at high power before their assembly onto the cavity string. Completion of the M-ECCTD assembly outside clean room is in progress as well as the finalization of the RF power test stand preparation. RF power tests of the M-ECCTD will be performed during summer 2017. CEA is preparing the production of the ESS medium and high beta cryomodules of the series before the test of the M-ECCTD and the contracts for the procurement of the most critical components have already been signe
    corecore