148 research outputs found

    Steam cycle options for capture-ready power plants, retrofits and flexible operation with post-combustion CO2 capture

    No full text
    The energy penalty for post‐combustion carbon dioxide capture from fossil‐fired power plants can be greatly reduced ‐ independently of the intrinsic heat of regeneration of the solvent used ‐ by effective thermodynamic integration with the power cycle. Yet expected changes in electricity generation mix and the current immaturity of post‐combustion capture technology are likely to make effective thermodynamic integration throughout the operating life of such plants a challenging objective to achieve because of a requirement for extensive part‐load operation and also for matching to future technology improvements. Most previous published studies have, however, focused on base‐load operation of the power cycle and the carbon dioxide capture plant and with the assumption of a fixed technology. For carbon dioxide capture‐ready plants the characteristics of the capture plant are also not known when the plant is designed. The plant must operate initially without capture at a similar efficiency to ‘standard’ plants to be competitive. Capture‐ready plants then also need to be able to be retrofitted with unknown improved solvents and to be capable of integration with a range of future solvents. This study shows that future upgradability for post‐combustion capture systems can be facilitated by appropriate steam turbine and steam cycle designs. In addition fossil‐fired power plants with postcombustion capture may need to be able to operate throughout their load range with the capture unit by‐passed, or with intermediate solvent storage to avoid the additional emissions occurring when the absorption column is by‐passed. Steam cycles with flexible steam turbines can be adequately designed to accommodate for part‐load operation with these novel operating conditions and with rapid ramp rates. Several approaches for effective capture‐ready pulverised coal and natural gas plants are also described. These achieve identical performance before retrofit to a conventional plant with the same steam conditions, but have the potential to perform well after capture retrofit with a wide range of solvents, at the expense of only a small efficiency penalty compared to hypothetical plants built with perfect foreknowledge of the solvent energy requirements. For existing plants that were not made capture‐ready, and provided sufficient space is available and other physical limits are not too constraining, ways to achieve effective thermodynamic integration are also discussed

    Addressing Technology Uncertainties in Power Plants with Post-Combustion Capture

    Get PDF
    AbstractRisks associated with technology, market and regulatory uncertainties for First-Of-A-Kind fossil power generation with CCS can be mitigated through innovative engineering approaches that will allow solvent developments occurring during the early stage of the deployment of post-combustion CO2 capture to be subsequently incorporated into the next generation of CCS plants. Power plants capable of improving their economic performance will benefit financially from being able to upgrade their solvent technology. One of the most important requirements for upgradeability is for the base power plant to be able to operate with any level of steam extraction and also with any level of electricity output up to the maximum rating without capture. This requirement will also confer operational flexibility and so is likely to be implemented in practice on new plants or on any integrated CCS retrofit project

    On the retrofitting and repowering of coal power plants with post-combustion carbon capture: An advanced integration option with a gas turbine windbox

    Get PDF
    Retrofitting a significant fraction of existing coal-fired power plants is likely to be an important part of a global rollout of carbon capture and storage. For plants suited for a retrofit, the energy penalty for post-combustion carbon capture can be minimised by effective integration of the capture system with the power cycle. Previous work on effective integration options has typically been focused on either steam extraction from the power cycle with a reduction of the site power output, or the supply of heat and electricity to the capture system via the combustion of natural gas, with little consideration for the associated carbon emissions. This article proposes an advanced integration concept between the gas turbine, the existing coal plant and post-combustion capture processes with capture of carbon emissions from both fuels. The exhaust gas of the gas turbine enters the existing coal boiler via the windbox for sequential combustion to allow capture in a single dedicated capture plant, with a lower flow rate and a higher CO2 concentration of the resulting flue gas. With effective integration of the heat recovery steam generator with the boiler, the existing steam cycle and the carbon capture process, the reference subcritical unit used in this study can be repowered with an electricity output penalty of 295 kWh/tCO2 – 5% lower than a conventional steam extraction retrofit of the same unit – and marginal thermal efficiency of natural gas combustion of 50% LHV – 5% point higher than in a configuration where the gas turbine has a dedicated capture unit

    Maintaining the Power Output of An Existing Coal Plant with the Addition of CO 2 Capture: Retrofits Options With Gas Turbine Combined Cycle Plants

    Get PDF
    AbstractIt is likely that a significant number of existing pulverised coal-fired power plants will be retrofitted with post-combustion capture as part of a global rollout of carbon capture and storage. Previous studies have demonstrated that the energy penalty for post-combustion carbon dioxide (CO2) capture can be greatly minimised by effective integration of the capture system with the power cycle. Nevertheless, the power output of the site is, in most cases, reduced and the volume of electricity sales would drop. For other plants, the existing steam cycle may not be able to be integrated effectively for steam extraction, or space and access around/to the steam cycle may be impossible. As an alternative to steam extraction, it is possible to retrofit existing coal plants with a gas turbine combined cycle plant (CCGT) to maintain, or even increase, the site power output. The gas turbine can be integrated to the existing coal plant in various ways to supply all the heat, or a fraction of the heat, and the power required for the capture systems. An important consideration is whether carbon emissions from both, the combined cycle and the retrofitted coal plant are captured, or from the latter only.This paper examines these different options for carbon capture retrofits to existing coal plant and presents a novel configuration with the sequential combustion of gas turbine flue gas in the existing coal boiler while capturing carbon emissions from the combustion of coal and natural gas

    A remotely-operated facility for evaluation of post-combustion CO2 capture technologies on industrial sites

    Get PDF
    ACTTROM (Advanced Capture Testing in a Transportable Remotely-Operated Minilab) is a transportable test facility for bench-scale evaluation of postcombustion CO2 capture technologies using real industrial flue gases. It is designed to be remote-operable, requiring visits only once per month for maintenance and sample collection. ACTTROM is the first facility of its kind, owned and operated by academia for collaborative research in an industrial environment, and this has resulted in a number of unique developments to facilitate remote operation at an industrial host site. Specifically, it has been necessary to design the unit to automatically correct or mitigate the effects of fault conditions, and to be remotely-monitored via a user interface at 24 hour intervals
    • 

    corecore