5,130 research outputs found
Effectiveness of spacecraft testing programs
The need for testing under simulated mission operational conditions is discussed and the results of such tests are reviewed from the point of view of the user. A brief overview of the usal test sequences for high reliability long life spacecraft is presented and the effectiveness of the testing program is analyzed in terms of the defects which are discovered by such tests. The need for automation, innovative mechanical test procedures, and design for testability is discussed
Fourier Transforms of Lorentz Invariant Functions
Fourier transforms of Lorentz invariant functions in Minkowski space, with
support on both the timelike and the spacelike domains are performed by means
of direct integration. The cases of 1+1 and 1+2 dimensions are worked out in
detail, and the results for 1+n dimensions are given.Comment: 15 pages, 1 figur
Multi-kw dc power distribution system study program
The first phase of the Multi-kw dc Power Distribution Technology Program is reported and involves the test and evaluation of a technology breadboard in a specifically designed test facility according to design concepts developed in a previous study on space vehicle electrical power processing, distribution, and control. The static and dynamic performance, fault isolation, reliability, electromagnetic interference characterisitics, and operability factors of high distribution systems were studied in order to gain a technology base for the use of high voltage dc systems in future aerospace vehicles. Detailed technical descriptions are presented and include data for the following: (1) dynamic interactions due to operation of solid state and electromechanical switchgear; (2) multiplexed and computer controlled supervision and checkout methods; (3) pulse width modulator design; and (4) cable design factors
Law for the Illinois farmer / 1079
"This circular replaces Circular 886."Cover title
Research study on multi-KW-DC distribution system
A detailed definition of the HVDC test facility and the equipment required to implement the test program are provided. The basic elements of the test facility are illustrated, and consist of: the power source, conventional and digital supervision and control equipment, power distribution harness and simulated loads. The regulated dc power supplies provide steady-state power up to 36 KW at 120 VDC. Power for simulated line faults will be obtained from two banks of 90 ampere-hour lead-acid batteries. The relative merits of conventional and multiplexed power control will be demonstrated by the Supervision and Monitor Unit (SMU) and the Automatically Controlled Electrical Systems (ACES) hardware. The distribution harness is supported by a metal duct which is bonded to all component structures and functions as the system ground plane. The load banks contain passive resistance and reactance loads, solid state power controllers and active pulse width modulated loads. The HVDC test facility is designed to simulate a power distribution system for large aerospace vehicles
Covering theorems for Artinian rings
The covering properties of Artinian rings which depend on their additive structure only, are investigated
- …