303 research outputs found

    Engineering-to-order versus make-to-stock strategy: an analysis at two printing companies

    Get PDF
    Organizations are adopting industrial production models with priority given to reducing costs and increasing the quality of their processes and products. Optimizing and rationalization the inventory management is a great opportunity for these companies conquer these goals. The objective of this paper is to analyze inventory management at two printing companies located in the region of Bauru, where one adopts the Engineering-To-Order (ETO) production system and the other the Make-To-Stock (MTS) production system, highlighting their convergences and oppositions. For their achievement was chosen by the methodology of study of multiple cases (two cases). Data were collected through the intersection of the following tools: semi-structure, document analysis and observation in loco. Revisions are made in theoretical work on the following topics: logistics, management of materials and production planning and control. These themes guided the search, allowing a greatest criticism about the collected data and information generated. The two case studies were presented together with a comparative table of the main aspects of the influence of demand management strategy on the inventory management in two companies. Although the companies adopt different production strategies, there was no significant change observed in inventory management strategy

    ENGINEERING-TO-ORDER VERSUS MAKE-TO-STOCK STRATEGY: AN ANALYSIS AT TWO PRINTING COMPANIES

    Get PDF
    Organizations are adopting industrial production models with priority given to reducing costs and increasing the quality of their processes and products. Optimizing and rationalization the inventory management is a great opportunity for these companies conquer these goals. The objective of this paper is to analyze inventory management at two printing companies located in the region of Bauru, where one adopts the <em style="mso-bidi-font-style: normal;">Engineering-To-Order</em> (ETO) production system and the other the <em style="mso-bidi-font-style: normal;">Make-To-Stock </em>(MTS) production system, highlighting their convergences and oppositions. For their achievement was chosen by the methodology of study of multiple cases (two cases). Data were collected through the intersection of the following tools: semi-structure, document analysis and observation in loco. Revisions are made in theoretical work on the following topics: logistics, management of materials and production planning and control. These themes guided the search, allowing a greatest criticism about the collected data and information generated. The two case studies were presented together with a comparative table of the main aspects of the influence of demand management strategy on the inventory management in two companies. Although the companies adopt different production strategies, there was no significant change observed in inventory management strategy

    Study on ISO 9001 certification in Brazil: mapping the motivations, benefits, and difficulties

    Get PDF
    O objetivo deste trabalho é identificar as principais motivações, benefícios e dificuldades na certificação de Sistemas de Gestão da Qualidade ISO 9001 em empresas brasileiras. Adicionalmente investigaram-se as principais práticas de gestão da qualidade que dão suporte a este tipo de certificação e qual o seu relacionamento com outros tipos de sistemas, tais como a ISO 14001 (Gestão Ambiental) e a OHSAS 18001 (Gestão da Segurança e Saúde do Trabalho). A abordagem metodológica utilizada foi a pesquisa tipo survey, cuja amostra conteve 191 empresas. As principais motivações para implementação da ISO 9001 identificadas foram: possibilidade de melhoria na organização interna, maior eficiência produtiva e maior confiabilidade na marca. A resistência dos funcionários foi apontada como a maior dificuldade. Já os principais benefícios obtidos foram: melhoria da qualidade nos processos e maior conscientização dos empregados em relação à qualidade. Os resultados revelam que os programas e ferramentas da qualidade mais utilizados são: 5S, brainstorming e diagrama de Ishikawa; enquanto os menos utilizados são: o Servqual e o QFDThis work aims to identify the main motivations and difficulties faced by Brazilian companies to obtain ISO 9001 certification. The key quality management practices that provide support to this certification and the relationship with other types of systems, such as ISO 14001 (Environmental Management) and OHSAS 18001 (Occupational Health and Safety Management System), were also investigated. A survey research was conducted with 191 companies. The main motivations for implementing ISO 9001 are the following: internal organization improvement, production efficiency increase, and brand reliability improvement. Employee resistance was the greatest challenge found during the implementation process. On the other hand, the main benefits identified were: quality processes improvement and increased employee awareness of quality. The results reveal that the most common quality programs and tools used are: 5S, brainstorming, and Ishikawa diagram, while the least common are SERVQUAL and QF

    Análise sobre a reciclagem de resíduos sólidos em São José dos Campos

    Get PDF
    A cidade de São José dos Campos está entre os 8% dos municípios brasileiros abrangidos por programas de materiais recicláveis, conforme as informações publicadas pelo Ministério do Meio Ambiente em 2012. Atualmente, a cidade apresenta 12 Postos de Entrega Voluntária (PEVs) contemplando as zonas central, leste, norte e sul. As estruturas não são totalmente utilizadas, contudo tem se mostrado insuficiente para a quantidade de habitantes. Sendo assim, propõe-se neste artigo um estudo restrito a São José dos Campos, direcionado aos PEVs. O objetivo do trabalho é levantar as informações estratégicas acerca dos Postos de Entrega Voluntária, observando se as práticas dos serviços competentes estão em consonância com do Plano Municipal de Gestão Integrada de Resíduos Sólidos. Verificou-se que há predisposição do poder público em cumprir as determinações do Plano Municipal, embora o projeto careça de melhor expansão e de divulgação institucional para poder avançar de maneira mais robusta em seus resultados

    PROPOSAL OF A MODEL MANAGEMENT TO SMALL DESIGN COMPANIES

    Get PDF
    Este artigo propõe um modelo para gestão de pequenas empresas de projeto de edifícios adaptado às suas necessidades e realidade. Para tanto, por meio de uma pesquisa qualitativa, foram realizados quatro estudos de casos em pequenas empresas de projeto que atuam, principalmente, na cidade de São Paulo. Para coleta de dados foram utilizados os seguintes instrumentos: entrevistas semi-estruturadas, observação in loco e análise de documentos. O modelo proposto inclui orientações para gestão dos principais processos e funções das pequenas empresas de projeto de edifícios, tais como: estrutura organizacional, planejamento estratégico, planejamento e controle do processo de projeto, gestão de custos, gestão comercial, sistema de informações, gestão de recursos humanos, serviços agregados ao projeto e avaliação de desempenho. Palavras-chave: empresa de projeto, processo de projeto, construção de edifícios. PROPOSAL OF A MODEL MANAGEMENT TO SMALL DESIGN COMPANIES ABSTRACT The main purpose of this paper is the proposition of a management model specifically developed for small building design firms, aligned with their needs and particularities. The field research was conducted with a qualitative approach through the analysis of four case studies in small building design firms acting mainly in São Paulo City. The data collection was accomplished through semi-structured interviews, direct observation and analysis of documents. The proposed model includes guidance to the management of the core processes and activities of small building design firms, such as: organizational structure; strategic planning; planning and control of design process; costs management; sales management; information systems; human resources management; services added to the design; and performance evaluation. Key-words: design firms; design process; building construction.The main purpose of this paper is the proposition of a management model specifically developed for small building design firms, aligned with their needs and particularities. The field research was conducted with a qualitative approach through the analysis of four case studies in small building design firms acting mainly in São Paulo City. The data collection was accomplished through semi-structured interviews, direct observation and analysis of documents. The proposed model includes guidance to the management of the core processes and activities of small building design firms, such as: organizational structure; strategic planning; planning and control of design process; costs management; sales management; information systems; human resources management; services added to the design; and performance evaluation. Key-words: design firms; design process; building construction

    SECAS, MIGRAÇÕES E REPRESENTAÇÕES DO SEMI-ÁRIDO NA LITERATURA REGIONAL: POR UMA HISTÓRIA AMBIENTAL DOS SERTÕES DO NORDESTE BRASILEIRO

    Get PDF
    Este artigo propõe uma reflexão acerca do movimento migratório de trabalhadores nordestinos, a partir da década de 1930. Não obstante certa historiografia tenha frequentemente atribuído como a causa dessa prática as pressões naturais/climáticas peculiares a um clima semi-árido, a literatura a aponta como decorrente das ingerências política e econômica locais, que viriam à tona ou eram intensificados nos períodos de secas prolongadas. Trata-se de desconstruir idéias deterministas que situavam a migração como decorrente apenas do clima, erigindo a imagem de uma natureza “hostil”, “adversa” e “imutável”, responsável pelos maiores problemas dessa sociedade. Nesse sentido, busca-se apreciar na literatura a forma como, simultaneamente, dos encontros criativos advindos da humanização do bioma Caatinga pelas culturas híbridas surgidas da formação pluriétnica dos homens dos “sertões”, surgiam estratégias transculturais e reordenamentos outros que permitiam a sobrevivência biológica e cultural naqueles regimes específicos de historicidade

    Gestão da Informação na Universidade: O Paradigma Digital e as Perspectivas Para as Políticas Setoriais e Para a Auto-Avaliação Institucional

    Get PDF
    O rompimento com velhos paradigmas por meio de soluções próprias das tecnologias de informação e comunicação, alinhadas com a gestão do fluxo de trabalho e de documentos, tem revelado organizações mais leves e ágeis, eficientes operacionalmente e capacitadas a estabelecerem diferenciais no atendimento às demandas emergentes com valores agregados e oferta de novos serviços. Entretanto, por não enfrentarem este desafio, muitas organizações públicas observam a degradação na qualidade de seus serviços e acentuam o desgaste dos setores, expondo suas fragilidades nas tentativas de esboçarem reação à realidade de novas exigências próprias do crescimento da informação em rede e intolerância à demasiada burocracia e ausência de cultura de auto-avaliação. Nestas organizações os apelos por um contexto mais favorável convivem com desafios inerentes a escassez de recursos e instigam o empreendedorismo interno à busca de alternativas viáveis. Sob este cenário gerou-se uma solução que adere novos procedimentos operacionais ao emprego de uma ferramenta tecnológica voltada, a princípio, para a gestão da atividade docente em uma unidade departamental. Funcionando em caráter experimental, com interface contextualizada para fácil alimentação e consulta on-line na rede corporativa, diluiu resistências a sua adoção e permitiu vislumbrar mudanças significativas nos serviços essenciais. Possibilitou também análises sob as perspectivas dos grupos, oferecendo suporte a identificação de potencialidades e estabelecimento de novas políticas setoriais. Finalmente, diante da ausência de um meio agregador para tratar informações integradas, geradas pelas atividades de ensino, pesquisa, extensão e administrativas, a solução se adequa ao atendimento do processo de auto-avaliação institucional na dimensão das ações docentes

    Fracture resistance of weakened teeth restored with condensable resin with and without cusp coverage

    Get PDF
    OBJECTIVES: This in vitro study evaluated the fracture resistance of weakened human premolars (MOD cavity preparation and pulp chamber roof removal) restored with condensable resin composite with and without cusp coverage. MATERIAL AND METHODS: Thirty human maxillary premolars were divided into three groups: Group A (control), sound teeth; Group B, wide MOD cavities prepared and the pulp chamber roof removed and restored with resin composite without cusp coverage; Group C, same as Group B with 2.0 mm of buccal and palatal cusps reduced and restored with the same resin. The teeth were included in metal rings with self-curing acrylic resin, stored in water for 24 h and thereafter subjected to a compressive axial load in a universal testing machine at 0.5 mm/min. RESULTS: The mean fracture resistance values ± standart deviation (kgf) were: group A: 151.40 ± 55.32, group B: 60.54 ± 12.61, group C: 141.90 ± 30.82. Statistically significant differences were found only between Group B and the other groups (p<0.05). The condensable resin restoration of weakened human premolars with cusp coverage significantly increased the fracture resistance of the teeth as compared to teeth restored without cusp coverage. CONCLUSION: The results showed that cusp coverage with condensable resin might be a safe option for restoring weakened endodontically treated teeth

    Fracture resistance of weakened teeth restored with condensable resin with and without cusp coverage

    Get PDF
    OBJECTIVES: This in vitro study evaluated the fracture resistance of weakened human premolars (MOD cavity preparation and pulp chamber roof removal) restored with condensable resin composite with and without cusp coverage. MATERIAL AND METHODS: Thirty human maxillary premolars were divided into three groups: Group A (control), sound teeth; Group B, wide MOD cavities prepared and the pulp chamber roof removed and restored with resin composite without cusp coverage; Group C, same as Group B with 2.0 mm of buccal and palatal cusps reduced and restored with the same resin. The teeth were included in metal rings with self-curing acrylic resin, stored in water for 24 h and thereafter subjected to a compressive axial load in a universal testing machine at 0.5 mm/min. RESULTS: The mean fracture resistance values ± standart deviation (kgf) were: group A: 151.40 ± 55.32, group B: 60.54 ± 12.61, group C: 141.90 ± 30.82. Statistically significant differences were found only between Group B and the other groups (
    corecore