15 research outputs found

    Effects of Different Flotation Agents on the Nucleation and Growth of Potassium Chloride

    No full text
    The flotation agent is an important collector in the production of potassium chloride and is brought into the crystallization stage with the reflux of the mother liquor. Octadecylamine Hydrochloride (ODA), 1-Dodecylamine Hydrochloride (DAH) and Sodium 1-dodecanesulfonate (SDS) were selected to study their effect on the nucleation of potassium chloride. Focused Beam Reflectance Measurement was used to collect the nucleation-induced periods of KCl in the presence of flotation agents at different supersaturations. Then, empirical equations, classical nucleation theory and growth mechanism equations were employed for data analysis. It was found that the presence of flotation agents increased the nucleation sequence m, and m(ODA) > m(SDS) > m(DAH) > m(H2O). In addition, the interfacial energy data obtained using classical nucleation theory suggest that the flotation agents used in our paper promoted the homogeneous nucleation of KCl (reduced from 5.3934 mJ·m−2 to 5.1434 mJ·m−2) and inhibited the heterogeneous nucleation of KCl (increased from 2.8054 mJ·m−2 to 3.6004 mJ·m−2). This investigation also revealed that the growth of potassium chloride was consistent with the 2D nucleation-mediated growth mechanism, and the addition of flotation agent did not change the growth mechanism of potassium chloride. Finally, the particle size distribution results were exactly consistent with the order of nucleation order m. The study of nucleation kinetics and growth mechanisms of different flotation agents on potassium chloride can provide guidance for optimizing the production process of potassium chloride and developing new flotation agents

    Study on Thermodynamics and Kinetics of Cephalexin Enzymatic Hydrolysis and Its Process Development to Prepare 7-ADCA

    No full text
    Cephalosporin enzymatic hydrolysis technology is a green technology for recovering 7-amino-3-deacetoxycephalosporanic acid (7-ADCA) from cephalosporin mother liquor. Solubility is critical for the production and purification of 7-ADCA. In this paper, the solubility of 7-ADCA and phenylglycine was measured. Solubility-temperature correlation model and solubility-pH correlation model were investigated, and Akaike information criterion (AIC) analysis was performed. The kinetic parameters of the enzymatic hydrolysis reaction of cephalexin, cefradine, and cefadroxil were determined, and the reaction rates under different substrate concentrations were measured, and the Lineweaver–Burk double-reciprocal equation was used to draw a graph. The Michaelis constants Km/(mg/mL) were 73.98, 583.84, 38.66, Vmax/(mg/mL·min) 4.20, 16.00, 1.96, respectively. The experimental results show that amphoteric compounds and buffers can prompt the reaction, low concentration of methanol promotes the reaction, while high concentration of methanol inhibits the reaction, and ethanol, isopropanol, tetrahydrofuran (THF), dimethyl sulfoxide (DMSO), ethylene glycol (EG), 1,4-dioxane all have different degrees of inhibition on the reaction speed. Finally, based on thermodynamic and kinetic studies, a process technology for the preparation of 7-ADCA by hydrolysis catalyzed of cephalexin was developed. It was confirmed that the proposed process route of preferential removal of phenylglycine by elution and/or cooling crystallization was reasonable and effective. The 7-ADCA crystal products obtained by crystallization were characterized by PXRD, thermal analysis, infrared, electron microscope, and high-performance liquid chromatography (HPLC)

    Insight into the Nucleation Mechanism of p-Methoxybenzoic Acid in Ethanol-Water System from Metastable Zone Width

    No full text
    The metastable zone width (MSZW) of p-methoxybenzoic acid (PMBA) in an ethanol-water system was measured using the polythermal method. The nucleation order m obtained by the Nývlt’s model indicates the nucleation of PMBA following a progressive nucleation mechanism at low saturation temperature (m = 3.18–7.50) and an instantaneous nucleation mechanism at high saturation temperature (m = 1.46–2.55). Then, combined with the metastable zone experiment and the Sangwal model, we found that the MSZW and the interfacial energy reached the maximum when the mass fraction of ethanol was 0.8, which resulted in the smallest crystal product size. Meanwhile, the maximum rcrit and ΔGcrit obtained based on the modified Sangwal model indicating the PMBA needs to overcome a higher nucleation barrier in the ethanol mass fraction of 0.8. Finally, we proposed a preferential strategy for adjusting MSZW by correlating the interfacial energy with the change in ethanol mass fraction, saturation temperature, and cooling rate, respectively

    Multivariate Analysis of a Highly Effective Drug Combination Tablet Containing the Antiepileptic Drug Gabapentin to Enhance Pharmaceutical Properties with a Multicomponent Crystal Strategy

    No full text
    A thorough grasp of the relationship between the crystal structure and properties is necessary for the design of crystals with specific properties using crystal engineering. Gabapentin (GBP), an analogue of the neurotransmitter gamma-aminobutyric acid, is used to treat partial seizures. GBP exhibits a fast dissolution rate. However, because of being plastically and elastically deforming, which increases the possibility of capping or laminating during compression, GBP exhibits poor compaction behavior. The aim of the study was to address the aforementioned issues, involving preparing and characterizing gabapentin monohydrate (GBP·H2O) and cocrystals (GBP-PABA) with p-aminobenzoic acid (PABA). Both the tablets of GBP·H2O and GBP-PABA can successfully slow down the dissolution rate of the original drug and reduce the intrinsic dissolution rate. Additionally, the multicomponent crystals of GBP have slip planes, demonstrating very excellent compaction properties, according to a thorough study on the mechanical properties of crystals. In terms of single-crystal structure and intermolecular interaction, the compressibility assessment of multicomponent crystals by analysis of relationships between mechanical properties and bulk powder compaction behavior further proved its plastic behavior and appropriateness for direct compression. Therefore, the development of multicomponent crystals will effectively solve the determination of the parent drug itself and become an efficient oral combined formulation

    CEPC Technical Design Report -- Accelerator

    No full text
    The Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s

    CEPC Technical Design Report -- Accelerator

    No full text
    International audienceThe Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s

    CEPC Technical Design Report -- Accelerator

    No full text
    International audienceThe Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s

    CEPC Technical Design Report -- Accelerator

    No full text
    International audienceThe Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s
    corecore