8,795 research outputs found
Real-time co-ordinated resource management in a computational enviroment
Design co-ordination is an emerging engineering design management philosophy with its emphasis on timeliness and appropriateness. Furthermore, a key element of design coordination has been identified as resource management, the aim of which is to facilitate the optimised use of resources throughout a dynamic and changeable process. An approach to operational design co-ordination has been developed, which incorporates the appropriate techniques to ensure that the aim of co-ordinated resource management can be fulfilled. This approach has been realised within an agent-based software system, called the Design Coordination System (DCS), such that a computational design analysis can be managed in a coherent and co-ordinated manner. The DCS is applied to a computational analysis for turbine blade design provided by industry. The application of the DCS involves resources, i.e. workstations within a computer network, being utilised to perform the computational analysis involving the use of a suite of software tools to calculate stress and vibration characteristics of turbine blades. Furthermore, the application of the system shows that the utilisation of resources can be optimised throughout the computational design analysis despite the variable nature of the computer network
A methodology for design coordination in a distributed computing environment
At the conceptual stage of the design process it is increasingly common that analysis tools are involved in the evaluation of a large number of alternative designs. Designers use such analysis tools to assist with large scale concept evaluations and the prediction of good initial designs. Consequently there exists a need to coordinate these analysis tools to enable the early stage of design to be performed in a timely and efficient manner. This paper describes a generic methodology that allows the management and coordination of design analysis tools. A Computer Aided Design tool, namely the Design Coordination System (DCS), has been developed to assist the designer in performing computational analysis in a distributed computing environment. Within the DCS, a collection of design agents act as members of a multi-functional team operating in a cooperative and coordinated manner in order to satisfy the objective of efficiently performing the design analysis
A water vision for Johnstone
The Water Vision is based on ideas from The Netherlands which promote communication with the public on key water related issues in a local authority area. A Water Vision for Johnstone was developed in Renfrewshire, Scotland where serious flooding has occurred in the past and new, predominantly non-structural approaches to surface water management were demanded. The paper outlines the development of a âWater Vision for Johnstoneâ which became a key outcome of the Interreg III B project âUrban Waterâ.The Water Toets (Assessments) are statutory procedures in the Netherlands which come into play from the concept stage of developments onwards to full implementation. They are undertaken jointly on behalf of the spatial planning authority and the water authorities to evaluate the impact of development on the water network. In contrast, the Water Vision is a less well-defined process to identify community needs and aspirations but in many areas the vision is essential to support the Water Toets. The Water Vision is initiated by planning officers from the municipalities asking very basic questions of their communities about what they required of the water network. It was felt that adopting such a proactive approach where virtually any question about water bodies and drainage infrastructure could be asked, would not be practicable in the UK and it was decided to assemble information about water issues in the area, the agencies involved and potential ways forward, before approaching the public.Johnstone was selected as a test area as it was felt that this locality included many of the water related problems that can be found throughout Renfrewshire. Key water issues were identified and a range of possible solutions provided. Problems, solutions and organisations responsible for different aspects of the water network are described in the document, using images and plans to facilitate the public awareness. Normally the man in the street would not be expected to be as familiar with the nature of water-related problems as the general public in the Netherlands. The Water Vision is yet to go to public consultation as it is currently primarily a planning tool in which council processes are embedded. However, it is planned that workshops including all key stakeholders involved in water management will be held. Those bodies currently responsible for water management will then be encouraged to discuss the various options and opportunities available in a creative and integrated manner. By working together as a team in addressing water related issues it will be possible to develop a vision for the future that better assists the public in moving forward together
A generic coordination approach applied to a manufacturing environment
This paper describes a generic coordination approach applied to the field of manufacturing engineering. The objective of the coordination mechanism with respect to this application is twofold. Firstly, it is shown that utilising the developed system can result in the efficient organisation of processes leading to a near optimum time taken to manufacture a number of artefacts. Secondly, successful operation of the system in this environment will demonstrate that the approach is generic in nature. The results already achieved using this system within a computational analysis environment supports this hypothesis
A methodology for prospective operational design co-ordination
Engineering companies are continually faced with the challenge of how best to utilise their design team given some design project. Decisions regarding how to distribute the project workload amongst the members of the design team are the responsibility of a project manager who, in order to do this, often relies upon previous experience and/or the support of some planning tool. Furthermore, a project manager rarely has the opportunity to assess the capability of the design team against the current work load in order to determine what, if any, alterations couldbe made to the team to facilitate appropriate reductions in project time and cost.This paper proposes a mathematical-based methodology aimed at identifying shortfalls in design teams, which if remedied would result in a more efficient project in terms of time and cost. The methodology provides a means of identifying those skills within the design team,with respect to the outstanding work load, in which improvements would have the greatest influence on reducing time and cost. In addition, the methodology employs a genetic algorithm for the purpose of scheduling tasks to be undertaken by potential design teams. The methodology is applied to two practical case studies provided by engineering industry.The first case study involves the assessment of a multi-disciplined design team consisting of single-skilled engineers. In contrast, the second case study entails the assessment of multiskilled engineers within a multi-disciplined design team. As a result of applying the methodology to the case studies, potential improvement to the design teams are identified and, subsequently, evaluated by observing their effects
Public infrastructure and regional economic development: a simultaneous equations approach
A study of how public capital stock impacts regional economic development, which jointly models the effects of local public infrastructure on personal income and the effect of personal income on the allocation of local public outlays.Infrastructure (Economics) ; Regional economics ; Income
A flight investigation of simulated data link communications during single-pilot IFR flight
A Flight Data Console (FDC) was developed to allow simulation of a digital communications link to replace the current voice communication system used in air traffic control (ATC). The voice system requires manipulation of radio equipment, read-back of clearances, and mental storage of critical information items, all contributing to high workload, particularly during single-pilot operations. This was an inflight study to determine how a digital communications system might reduce cockpit workload, improve flight proficiency, and be accepted by general aviation pilots. Results show that instrument flight, including approach and landing, can be accomplished quite effectively using a digital data link system for ATC communications. All pilots expressed a need for a back-up voice channel. When included, this channel was used sparingly and principally to confirm any item of information about which there might be uncertainty
A flight investigation of simulated data-link communications during single-pilot IFR flight. Volume 2: Flight evaluations
Key problems in single pilot instrument flight operations are in the management of flight data and the processing of cockpit information during conditions of heavy workload. A flight data console was developed to allow simulation of a digital data link to replace the current voice communications stem used in air traffic control. This is a human factors evaluation of a data link communications system to determine how such a system might reduce cockpit workload, improve flight proficiency, and be accepted by general aviation pilots. The need for a voice channel as backup to a digital link is examined. The evaluations cover both airport terminal area operations and full mission instrument flight. Results show that general aviation pilots operate well with a digital data link communications system. The findings indicate that a data link system for pilot/ATC communications, with a backup voice channel, is well accepted by general aviation pilots and is considered to be safer, more efficient, and result in less workload than the current voice system
Microorganisms in solid materials. phases i, ii, iii, and iv final summary report
Culturing techniques for detection of viable microorganism inoculated into solid material
Real-time co-ordinated scheduling using a genetic algorithm
Real-time co-ordination is an emerging approach to operational engineering management aimed at being more comprehensive and widely applicable than existing approaches. Schedule management is a key characteristic of operational co-ordination related to managing the planning and dynamic assignment of tasks to resources, and the enactment of the resulting schedules, throughout a changeable process. This paper presents the application of an agent-oriented system, called the Design Co-ordination System, to an industrial case study in order to demonstrate the appropriate use of a genetic algorithm for the purpose of real-time scheduling. The application demonstrates that real-time co-ordinated scheduling can provide significant reductions in time to complete the computational design process
- âŠ