587 research outputs found
Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix D: Transmission Reconnaissance Study
This report (Transmission Reconnaissance Studies) discusses alternative transmission facilities needed to connect the project with the New England grid, and describes the study area involved. It supplements the Transmission System PI anning Study prepared by the Department of Interior (DOI) (February 1977) and the Assessment of Alternative Power Transmission Corridors prepared by VTN Consolidated (VTN) of Boston Mass., for the Dickey-Lincoln School Lakes project
Final Environmental Impact Statement Aptus Industrial and Hazardous Waste Treatment Facility
The environmental impact statement for the proposed aptus industrial and hazardous waste treatment facility analyzes the environmental impacts of the proposed transfer, storage, and incineration facility, and the the transportation and utility corridors through construction, operation, and closure
Albuquerque Bernalillo County Water Utility Authority Contract for Storage of San Juan-Chama Water in Elephant Butte Reservoir - Final Environmental Assessment
List of Geological Survey Geologic and Water-Supply Reports and Maps for Maine
List of Geological Survey Geologic and Water-Supply Reports and Maps for Maine.
United States Department of the Interior - Geological Survey, June 1978.
Contents: Annual Reports / Mineral Resources of the United States / Monographs / Geologic Folios / Topographic Atlas of the United States, Folio 1 / Professional Papers / Bulletins / Water-Supply Papers / Circulars / Maps, Charts and Atlaseshttps://digitalcommons.usm.maine.edu/me_collection/1094/thumbnail.jp
- …