29 research outputs found
ΠΠ΅ΠΎΡ ΠΈΠΌΠΈΡΠ΅ΡΠΊΠΈΠ΅ ΠΏΠΎΠΈΡΠΊΠΈ ΡΡΠ΄Π½ΡΡ ΠΌΠ΅ΡΡΠΎΡΠΎΠΆΠ΄Π΅Π½ΠΈΠΉ ΠΏΠΎ Π³Π°Π·ΠΎΠ²ΡΠΌ ΠΎΡΠ΅ΠΎΠ»Π°ΠΌ ΠΉΠΎΠ΄Π°
The first experience of study atmochemical iodine auras in the atmosphere above ore deposits by a remote sensing data is considered. Their great importance for increasing of deepness and quickness of geochemical search methods is shown.Π Π°ΡΡΠΌΠΎΡΡΠ΅Π½ ΠΏΠ΅ΡΠ²ΡΠΉ ΠΎΠΏΡΡ ΠΈΠ·ΡΡΠ΅Π½ΠΈΡ Π°ΡΠΌΠΎΡ
ΠΈΠΌΠΈΡΠ΅ΡΠΊΠΈΡ
ΠΎΡΠ΅ΠΎΠ»ΠΎΠ² ΠΉΠΎΠ΄Π° Π² Π°ΡΠΌΠΎΡΡΠ΅ΡΠ΅ ΡΡΠ΄Π½ΡΡ
ΠΌΠ΅ΡΡΠΎΡΠΎΠΆΠ΄Π΅Π½ΠΈΠΉ Π΄ΠΈΡΡΠ°Π½ΡΠΈΠΎΠ½Π½ΡΠΌ ΠΌΠ΅ΡΠΎΠ΄ΠΎΠΌ. ΠΠΎΠΊΠ°Π·Π°Π½ΠΎ ΠΈΡ
Π±ΠΎΠ»ΡΡΠΎΠ΅ Π·Π½Π°ΡΠ΅Π½ΠΈΠ΅ Π΄Π»Ρ ΡΠ²Π΅Π»ΠΈΡΠ΅Π½ΠΈΡ Π³Π»ΡΠ±ΠΈΠ½Π½ΠΎΡΡΠΈ ΠΈ ΡΠΊΡΠΏΡΠ΅ΡΡΠ½ΠΎΡΡΠΈ Π³Π΅ΠΎΡ
ΠΈΠΌΠΈΡΠ΅ΡΠΊΠΎΠ³ΠΎ ΠΏΠΎΠΈΡΠΊΠΎΠ²ΠΎΠ³ΠΎ ΠΌΠ΅ΡΠΎΠ΄Π°
ΠΠ΅ΠΎΡ ΠΈΠΌΠΈΡΠ΅ΡΠΊΠΈΠ΅ ΠΏΠΎΠΈΡΠΊΠΈ ΠΊΠΎΡΠ΅Π½Π½ΠΎΠ³ΠΎ Π·ΠΎΠ»ΠΎΡΠ°
Rational complex of prospecting methods for endogenic gold deposits which are of different scale and significance is studied and distinguished. Prospecting aims and tasks at the geological and explorations legs as far as methods of geochemical investigations are offered. Special attention is pied to anomalies finding out and appreciation of its ore formation and economic value.Π Π°ΡΡΠΌΠΎΡΡΠ΅Π½Ρ ΡΠ°ΡΠΈΠΎΠ½Π°Π»ΡΠ½ΡΠ΅ ΠΊΠΎΠΌΠΏΠ»Π΅ΠΊΡΡ ΠΏΠΎΠΈΡΠΊΠΎΠ²ΡΡ
ΠΌΠ΅ΡΠΎΠ΄ΠΎΠ² ΠΊΠΎΡΠ΅Π½Π½ΡΡ
Π·ΠΎΠ»ΠΎΡΠΎΡΡΠ΄Π½ΡΡ
ΠΎΠ±ΡΠ΅ΠΊΡΠΎΠ² ΡΠ°Π·Π»ΠΈΡΠ½ΠΎΠ³ΠΎ ΡΠ°Π½Π³Π°, Π²ΠΊΠ»ΡΡΠ°ΡΡΠΈΠ΅ Π²ΡΡΠ²Π»Π΅Π½ΠΈΠ΅, ΠΈΠ½ΡΠ΅ΡΠΏΡΠ΅ΡΠ°ΡΠΈΡ ΠΈ ΠΎΡΠ΅Π½ΠΊΡ Π³Π΅ΠΎΡ
ΠΈΠΌΠΈΡΠ΅ΡΠΊΠΈΡ
Π°Π½ΠΎΠΌΠ°Π»ΠΈΠΉ
Π Π°ΡΠΈΠΎΠ½Π°Π»ΡΠ½ΡΠΉ ΠΊΠΎΠΌΠΏΠ»Π΅ΠΊΡ ΡΠ°Π±ΠΎΡ ΠΏΠΎ Π³Π»ΡΠ±ΠΈΠ½Π½ΠΎΠΌΡ Π³Π΅ΠΎΡ ΠΈΠΌΠΈΡΠ΅ΡΠΊΠΎΠΌΡ ΠΏΡΠΎΠ³Π½ΠΎΠ·ΠΈΡΠΎΠ²Π°Π½ΠΈΡ
Complex of methods for the forecasting of deeply buried endogenetic mineralization as a result of lithogeochemical sampling of soils. The main attention is stressed for the elements of indication, sampling, methods of analysis and methods of evaluation.Π Π°ΡΡΠΌΠΎΡΡΠ΅Π½ ΠΊΠΎΠΌΠΏΠ»Π΅ΠΊΡ ΡΠ°Π±ΠΎΡ ΠΏΠΎ ΠΏΡΠΎΠ³Π½ΠΎΠ·ΠΈΡΠΎΠ²Π°Π½ΠΈΡ Π³Π»ΡΠ±ΠΎΠΊΠΎΠ·Π°Π»Π΅Π³Π°ΡΡΠ΅Π³ΠΎ ΡΠ½Π΄ΠΎΠ³Π΅Π½Π½ΠΎΠ³ΠΎ ΠΎΡΡΠ΄Π΅Π½Π΅Π½ΠΈΡ ΠΏΠΎ ΡΠ΅Π·ΡΠ»ΡΡΠ°ΡΠ°ΠΌ Π»ΠΈΡΠΎΠ³Π΅ΠΎΡ
ΠΈΠΌΠΈΡΠ΅ΡΠΊΠΎΠ³ΠΎ ΠΎΠΏΡΠΎΠ±ΠΎΠ²Π°Π½ΠΈΡ ΠΏΠΎΠ²Π΅ΡΡ
Π½ΠΎΡΡΠΈ. ΠΠ»Π°Π²Π½ΠΎΠ΅ Π²Π½ΠΈΠΌΠ°Π½ΠΈΠ΅ ΡΠ΄Π΅Π»Π΅Π½ΠΎ ΡΠ»Π΅ΠΌΠ΅Π½ΡΠ°ΠΌ-ΠΈΠ½Π΄ΠΈΠΊΠ°ΡΠΎΡΠ°ΠΌ, Π²ΠΎΠΏΡΠΎΡΠ°ΠΌ ΠΎΠΏΡΠΎΠ±ΠΎΠ²Π°Π½ΠΈΡ, Π°Π½Π°Π»ΠΈΡΠΈΠΊΠ΅, ΠΌΠ΅ΡΠΎΠ΄Π°ΠΌ ΠΎΠ±ΡΠ°Π±ΠΎΡΠΊΠΈ Π°Π½Π°Π»ΠΈΡΠΈΡΠ΅ΡΠΊΠΈΡ
Π΄Π°Π½Π½ΡΡ
, ΡΠΏΠΎΡΠΎΠ±Π°ΠΌ ΠΎΡΠ΅Π½ΠΊΠΈ Π°Π½ΠΎΠΌΠ°Π»ΠΈΠΉ
Π Π΅Π»ΡΠ΅Ρ ΠΎΡΡΡΠΎΠ²Π° Π¨ΡΠΈ-ΠΠ°Π½ΠΊΠ° (ΡΠ³ΠΎ-Π·Π°ΠΏΠ°Π΄Π½Π°Ρ ΡΠ°ΡΡΡ) ΠΈ ΡΠΎΡΡΡΠΏΠΈ
On the explored territory 5 genetic types of the relief are distinguished as well as related to them gem sands. These gem sands had been formed in the Kalu-Ganga river valley within the junction zone of the low accumulative plain-depression and low hill and low mountain ridge relief made up by the productive Proterozoic thick layers.ΠΡΠ΄Π΅Π»Π΅Π½Ρ ΠΎΡΠ½ΠΎΠ²Π½ΡΠ΅ Π³Π΅Π½Π΅ΡΠΈΡΠ΅ΡΠΊΠΈΠ΅ ΡΠΈΠΏΡ ΡΠ΅Π»ΡΠ΅ΡΠ° ΠΎ. Π¨ΡΠΈ-ΠΠ°Π½ΠΊΠ°, ΡΠΊΠ°Π·Π°Π½Ρ ΠΌΠ΅ΡΡΠ° Π²ΠΎΠ·ΠΌΠΎΠΆΠ½ΡΡ
ΠΊΠΎΠ½ΡΠ΅Π½ΡΡΠ°ΡΠΈΠΈ ΡΠΎΡΡΡΠΏΠ΅ΠΉ Π΄ΡΠ°Π³ΠΎΡΠ΅Π½Π½ΡΡ
ΠΊΠ°ΠΌΠ½Π΅ΠΉ
White LED modules encapsulation features
The behaviour and causes of changes for correlated color temperature (CCT)
and radiant spectral power in white LED modules of different design at their
encapsulation by optical compounds are investigated. It is shown that CCT of original
white LED radiation can both decrease and increase after polymeric covering application.
The Π‘Π‘T variation direction is determined mainly by primary lens presence on LED. The
variation value of color parameters of white LED modules is determined by created
optical surface curvature and spectral characteristics of deposited polymer
Les particularités et la composition minéralogique du gisement aurifère de la Perma dans les formations protérozoïques de l'Atacora, nord-ouest de la République du Bénin
(J. de la Recherche Scientifique de l'UniversitΓ© de LomΓ©, 1999, 3(2): 154-173
JINR Tier-1 centre for the CMS experiment at LHC
An overview of the JINR Tier-1 centre for the CMS experiment at the LHC is given. Special emphasis is placed on the main tasks and services of the CMS Tier-1 at JINR. In February 2015 the JINR CMS Tier-1 resources were increased to the level that was outlined in JINRβs rollout plan: CPU 2400 cores (28800 HEP-Spec06), 2.4 PB disks, and 5.0 PB tapes. The first results of the Tier-1 operations received during the LHC Run-2 start are presented