86 research outputs found

    The ECRH-Power Upgrade at the Wendelstein 7-X Stellarator

    Get PDF
    The existing ECRH system at W7-X consists of 10 gyrotrons, with output power levels ranging from 0.6 MW up to 1.0 MW each at a frequency of 140 GHz, quasi-optical transmission lines and microwave launchers at the plasma vessel. Compared to other large fusion experiments, W7-X has a relatively low power-to-volume ratio. However high heating power is particularly necessary for achieving high plasma beta values, where the improved confinement of fast ions, one of the optimization criteria of W7-X, can be examined. It is therefore necessary to expand the ECRH systems in several consecutive steps. It is planned to increase the number of gyrotron positions from 10 to 12 and at the same time to evolve the gyrotron output power in several development steps from 1 MW to nominal 1.5 MW and, finally, up to 2 MW. At the same time, the transmission lines will also be upgraded for 2 MW operation. A special effort is also made to improve the reliability of the system by the fast control system

    Integration Concept of an Electron Cyclotron System in DEMO

    Get PDF
    The pre-conceptual layout for an electron cyclotron system (ECS) in DEMO is described. The present DEMO ECS considers only equatorial ports for both plasma heating and neoclassical tearing mode (NTM) control. This differs from ITER, where four launchers in upper oblique ports are dedicated to NTM control and one equatorial EC port for heating and current drive (H&CD) purposes as basic configuration. Rather than upper oblique ports, DEMO has upper vertical ports to allow the vertical removal of the large breeding blanket segments. While ITER is using front steering antennas for NTM control, in DEMO the antennas are recessed behind the breeding blanket and called mid-steering antennas, referred to the radially recessed position to the breeding blanket.In the DEMO pre-conceptual design phase two variants are studied to integrate the ECS in equatorial ports. The first option integrates waveguide bundles at four vertical levels inside EC port plugs with antennas with fixed and movable mid-steering mirrors that are powered by gyrotrons, operating at minimum two different multiples of the fundamental resonance frequency of the microwave output window. Alternatively, the second option integrates fixed antenna launchers connected to frequency step-tunable gyrotrons. The first variant is described in this paper, introducing the design and functional requirements, presenting the equatorial port allocation, the port plug design including its maintenance concept, the basic port cell layout, the transmission line system with diamond windows from the tokamak up to the RF building and the gyrotron sources.The ECS design studies are supported by neutronic and tokamak integration studies, quasi-optical and plasma physics studies, which will be summarized. Physics and technological gaps will be discussed and an outlook to future work will be given

    Integration concept of an Electron Cyclotron System in DEMO

    Get PDF
    The pre-conceptual layout for an electron cyclotron system (ECS) in DEMO is described. The present DEMO ECS considers only equatorial ports for both plasma heating and neoclassical tearing mode (NTM) control. This differs from ITER, where four launchers in upper oblique ports are dedicated to NTM control and one equatorial EC port for heating and current drive (H&CD) purposes as basic configuration. Rather than upper oblique ports, DEMO has upper vertical ports to allow the vertical removal of the large breeding blanket segments. While ITER is using front steering antennas for NTM control, in DEMO the antennas are recessed behind the breeding blanket and called mid-steering antennas, referred to the radially recessed position to the breeding blanket. In the DEMO pre-conceptual design phase two variants are studied to integrate the ECS in equatorial ports. The first option integrates waveguide bundles at four vertical levels inside EC port plugs with antennas with fixed and movable mid-steering mirrors that are powered by gyrotrons, operating at minimum two different multiples of the fundamental resonance frequency of the microwave output window. Alternatively, the second option integrates fixed antenna launchers connected to frequency step-tunable gyrotrons. The first variant is described in this paper, introducing the design and functional requirements, presenting the equatorial port allocation, the port plug design including its maintenance concept, the basic port cell layout, the transmission line system with diamond windows from the tokamak up to the RF building and the gyrotron sources. The ECS design studies are supported by neutronic and tokamak integration studies, quasi-optical and plasma physics studies, which will be summarized. Physics and technological gaps will be discussed and an outlook to future work will be given

    Recent experiments with the European 1MW, 170GHz industrial CW and short-pulse gyrotrons for ITER

    Get PDF
    The European Gyrotron Consortium (EGYC) is developing the European 1 MW, 170 GHz Continuous Wave (CW) industrial prototype gyrotron for ITER in cooperation with Thales Electron Devices (TED) and Fusion for Energy (F4E). This conventional, hollow-cavity gyrotron, is based on the 1 MW, 170 GHz Short-Pulse (SP) modular gyrotron that has been designed and manufactured by the Karlsruhe Institute of Technology (KIT) in collaboration with TED. Both gyrotrons have been tested successfully in multiple experiments. In this work we briefly report on the results with the CW gyrotron at KIT and we focus at the experiments at the Swiss Plasma Center (SPC). In addition, we present preliminary results from various upgrades of the SP tube that are currently tested at KIT

    Status and future development of Heating and Current Drive for the EU DEMO

    Get PDF
    The European DEMO is a pulsed device with pulse length of 2 hours. The functions devoted to the heating and current drive system are: plasma breakdown, plasma ramp-up to the flat-top where fusion reactions occur, the control of the plasma during the flat-top phase, and finally the plasma ramp-down. The EU-DEMO project was in a Pre-Concept Design Phase during 2014-2020, meaning that in some cases, the design values of the device and the precise requirements from the physics point of view were not yet frozen. A total of 130 MW was considered for the all phases of the plasma: in the flat top, 30 MW is required for neoclassical tearing modes (NTM) control, 30 MW for burn control, and 70 MW for the control of thermal instability (TI), without any specific functions requested from each system, Electron Cyclotron (EC), Ion Cyclotron (IC), or Neutral Beam (NB) Injection. At the beginning of 2020, a strategic decision was taken, to consider EC as the baseline for the next phase (in 2021 and beyond). R&D on IC and NB will be risk mitigation measures. In parallel with progresses in Physics modelling, a decision point on the heating strategy will be taken by 2024. This paper describes the status of the R&D development during the period 2014-2020. It assumes that the 3 systems EC, IC and NB will be needed. For integration studies, they are assumed to be implemented at a power level of at least 50 MW. This paper describes in detail the status reached by the EC, IC and NB at the end of 2020. It will be used in the future for further development of the baseline heating method EC, and serves as starting point to further develop IC and NB in areas needed for these systems to be considered for DEMO

    Status and future development of Heating and Current Drive for the EU DEMO

    Get PDF
    The European DEMO is a pulsed device with pulse length of 2 hours. The functions devoted to the heating and current drive system are: plasma breakdown, plasma ramp-up to the flat-top where fusion reactions occur, the control of the plasma during the flat-top phase, and finally the plasma ramp-down. The EU-DEMO project was in a Pre-Concept Design Phase during 2014-2020, meaning that in some cases, the design values of the device and the precise requirements from the physics point of view were not yet frozen. A total of 130 MW was considered for the all phases of the plasma: in the flat top, 30 MW is required for neoclassical tearing modes (NTM) control, 30 MW for burn control, and 70 MW for the control of thermal instability (TI), without any specific functions requested from each system, Electron Cyclotron (EC), Ion Cyclotron (IC), or Neutral Beam (NB) Injection. At the beginning of 2020, a strategic decision was taken, to consider EC as the baseline for the next phase (in 2021 and beyond). R&D on IC and NB will be risk mitigation measures. In parallel with progresses in Physics modelling, a decision point on the heating strategy will be taken by 2024. This paper describes the status of the R&D development during the period 2014-2020. It assumes that the 3 systems EC, IC and NB will be needed. For integration studies, they are assumed to be implemented at a power level of at least 50 MW. This paper describes in detail the status reached by the EC, IC and NB at the end of 2020. It will be used in the future for further development of the baseline heating method EC, and serves as starting point to further develop IC and NB in areas needed for these systems to be considered for DEMO
    • …
    corecore