11 research outputs found

    THE THOUGHTS OF K.H. BISRI MUSTOFA’S MORAL EDUCATION AND ITS RELEVANCE WITH DEVELOPMENT OF CHARACTER BUILDING

    Get PDF
    This study aims to describe the thoughts of K.H. Bisri Mustofa’s moral education in the books of Mitro Sejati and Ngudi Susilo and its relevance with the development of character building in Indonesia. To describe the concept of moral education in the aforementiod books, content analysis was used to grasp the main messages of the books. The finding showed that the thoughts of K.H. Bisri Mustofa’s moral education were relevant with the development of character building proclaimed by the government. The relevancyecould be found in the foundational thinking about moral education contended by K.H. Bisri Mustofa and character education in Indonesia, encompassing the importance of humanism in social interaction, moral degradation among adolescents, and the erosion of Eastern culture by Western culture.  Relevance was also found in the five main character values ​​that were prioritized in the implementation of the development of character building in which each value is relevant to KH. Bisri Mustofa. These values ​​include religious, integrity, nationalist, independent, and mutual cooperation

    COST OVERRUN AKIBAT DESAIN, ESTIMASI DAN REWORK SEBELUM IMPLEMENTASI KONSTRUKSI DIGITAL PADA KINERJA BIAYA KONSTRUKSI GEDUNG INDONESIA

    Get PDF
    Cost overrun merupakan fenomena yang masih terjadi pada pekerjaan konstruksi gedung Indonesia sampai dengan saat ini dengan beragam faktor penyebabnya. Hampir seluruh konstruksi gedung mengalami penambahan biaya, yang terkadang diiringi oleh penambahan waktu. Perubahan desain yang tak terduga selalu menimbulkan masalah baru dalam suatu pekerjaan konstruksi. Estimasi yang salah, serta rework yang terjadi dapat menghasilkan cost overrun yang mempengarui kinerja biaya. Tidak hanya Indonesia, permasalahan dunia konstruksi masih pada ketepatan kesesuaian pencapaian atas rencana biaya, mutu, dan waktu. Penambahan biaya ini sudah menjadi keniscayaan, hanya para stakeholder kegiatan konstruksi selalu berupaya memperkecil nilai tambahan biaya yang akan terjadi. Banyak variabel penyebab cost overrun, diantaranya pada tahap pra pelaksanaan : desain, estimasi, dan pada tahap pelaksanaan : rework. Penelitian ini mempelajari cost overrun yang terjadi akibat tiga variabel penyebab cost overrun tersebut serta mempelajari perubahan kinerja biaya itu sendiri dengan RII. Hasil analisa menggunakan SPSS dengan Model Regresi Linier Berganda,  didapatkan ketiga variabel tersebut masih berpengaruh menyebabkan cost overrun dengan nilai > 3%, dengan RII hasil cost overrun pada kinerja biaya terjadi pada biaya alat, nilai akhir kontrak, dan biaya operasional. Hasil dari uji kebaikan model menunjukkan nilai adjusted r square sebesar 3.5% yang artinya variabel bebas dalam model menjelaskan keragaman dari variabel terikatnya sebesar 3.5% sedangkan 96.5% lainnya dijelaskan oleh variabel bebas lain yang tidak disertakan dalam model penelitian. Hal ini dapat terjadi karena begitu banyaknya variabel penyebab cost overrun pada konstruksi

    PENGARUH HYDRAULIC ENGINEERING SOFTWARE TERHADAP KINERJA WAKTU PEKERJAAN DESAIN JARINGAN PERPIPAAN AIR LIMBAH SKALA KOTA

    Get PDF
    Saat ini Indonesia berada pada peringkat ke 125 dalam masalah penanganan sanitasi dan air minum [1]. Pemerintah Indonesia dalam hal ini Kementerian Pekerjaan Umum dan Perumahan Rakyat (PUPR) menyusun program 100% pelayanan air minum, 0 ha permukiman kumuh perkotaan dan 100% pelayanan sanitasi [2] untuk mendongkrak tingkat pelayanan sanitasi di Indonesia antara lain dengan program perencanaan jaringan pipa dan pengolahan air limbah. Tantangan yang dihadapi dalam perencanaan ini adalah terjadinya keterlambatan [3]. Hal ini tentunya dipengaruhi oleh banyak faktor yang salah satunya masih rendahnya penggunaan Advanced Engineering Software [4]. Penggunaan software konvensional seperti Microsoft Excel masih menjadi pilihan dalam menganalisis jaringan pipa air limbah sehingga membutuhkan waktu lebih banyak dalam mendesain ataupun mengoreksi desain. Oleh karena itu, penelitian ini dilakukan untuk mengetahui faktor-faktor pada penggunaan hydraulic engineering software yang berpengaruh terhadap kinerja waktu desain jaringan pipa air limbah. Hasil analisis linear berganda menunjukkan bawah dengan penggunaan secara simultan faktor-faktor kemudahan analisis, pengelolaan skenario, desain otomatis, integrasi dengan GIS dan akurasi memberikan pengaruh positif terhadap waktu desain jaringan pipa air limbah. Dari faktor-faktor tersebut diketahui bahwa pengelolaan skenario memberikan dampak positif paling besar terhadap kinerja waktu desain pipa air limbah skala kota

    Pengaruh Tingkat Penerapan BIM 5D Terhadap Kinerja Biaya Proyek Konstruksi

    Get PDF
    Dalam konstruksi, risiko biasanya permintaan untuk tambahan waktu, biaya, atau kualitas pekerjaan. Perselisihan akan terjadi Jika risiko tidak diselesaikan dengan baik. Dalam perkembangan revolusi industri 4.0, kita dapat menggunakan Building Information Modeling (BIM) untuk meningkatkan efisiensi. BIM adalah tampilan digital mengenai semua informasi bangunan yang telah  terintegrasi dengan periode siklus hidup bangunan. BIM akan mengoptimalkan kinerja proyek konstruksi. Di Indonesia, beberapa konsultan/kontraktor telah menerapkan BIM dalam proyek konstruksi. Penelitian ini untuk  mengetahui serta menganalisis faktor-faktor pada proses penerapan BIM 5D yang berpengaruh terhadap kinerja biaya pelaksanaan proyek konstruksi . Metode yang digunakan dalam penelitian adalah metode deskriptif menggunakan pendekatan Q-method dengan instrumen penelitian closed survey terhadap 53 kontraktor/konsultan yang menggunakan BIM. Hasil yang diperoleh dari indikator 5D BIM ada 5 berpengaruh terhadap  kinerja biaya proyek konstruksi

    ANALYSIS OF THE INFLUENCE OF ORDER VARIATION FACTORS ON THE COSTS AND TIME OF IMPLEMENTING CHANNEL DIVERCTION INFRASTRUCTURE CONSTRUCTION PROJECTS IN RESIDENTIAL AREAS

    Get PDF
    Tangerang is a big city in Indonesia. The housing sector rocketing in this region. Changes in development often occur because problems arise and have an impact on costs and time. Researchers focused on finding the cause of the work diverting residential channels being hampered. For this reason, changes were made to the sheetpile design and changes to the infrastructure mobilization method to meet the contract time. The research uses the SEM PLS method to determine the factors causing order variations. In addition, the data processing application was used to determine the effect of order variations on time and cost performance. The respondents were 60 owners and consultants. Based on the results of the cost performance analysis, additional work arising from order variations reached 10,516,305,346 IDR and reduced work due to order variations reached 6,628,461,533 IDR or around 12.96% of the initial contract price and the results of time performance analysis for time losses that occurred due to order variations on the project showed an additional time of 5 months or 125%

    Klasifikasi tingkat kematangan dan kemasakan buah durian dengan model neural network

    Get PDF
    This study was aimed to develop the model to predict the maturity and ripeness of durian based on its physical and chemical characteristics using neural network. The physicochemical and acoustic characteristics measurement was fed into the model as the inputs, which provided the levels of maturity and ripeness as the output of the model. The results suggested that the physico-chemical properties and the acoustic characteristic decreased with the increase of both maturity and ripeness level of durian. The total solid soluble, the water content and the total sugar increased according to the fruits maturity. The total acids increased in the beginning of durian maturing proces and then decreased when the maturity and ripeness level reached the mature-over ripened stage. Data training were done by model of neural network: model 4 output, with various node in the hidden layer 4, 6, 8 and 10 nodes. The results recommended that the best model to be applied was model 4 output with 4 nodes in the hidden layer and iteration 1000 and 5000 with the model accuration 87.5% -100%. Keywords: neural network, durian, maturity and ripenes

    Analisa Pengaruh Tingkat Penerapan BIM 5D Terhadap Kinerja Waktu Proyek Konstruksi: BIM, BIM5D, Time, Performance

    No full text
    In construction, risks are usually requests for additional time, cost, or quality of work. Disputes will occur If risks are not resolved properly. In the industrial revolution 4.0, we can use the Building Information Modeling (BIM) method to increase efficiency. BIM is a digital display that contains all information about building elements integrated with the building's life cycle period. BIM will optimize the performance of construction projects. In Indonesia, several consultants/contractors have implemented BIM in construction projects. This study aims to determine and analyze what factors in the process of implementing BIM 5D that affect the performance of construction project time. The research method used is descriptive research method with the Q-method approach using closed survey research instruments to 53 contractor/consultant respondents using BIM. The results obtained from the 5D BIM indicators have 3 effects on the time performance of construction projects.Dalam konstruksi, risiko biasanya permintaan untuk tambahan waktu, biaya, atau kualitas pekerjaan. Perselisihan akan terjadi Jika risiko tidak diselesaikan dengan baik. Dalam revolusi industri 4.0, kita dapat menggunakan metode Building Information Modeling (BIM) untuk meningkatkan efisiensi. BIM merupakan tampilan digital yang memuat semua informasi tentang elemen bangunan yang terintegrasi dengan periode siklus hidup bangunan. BIM akan mengoptimalkan kinerja proyek konstruksi. Di Indonesia, beberapa konsultan/kontraktor telah menerapkan BIM dalam proyek konstruksi. Penelitian ini bertujuan untuk  mengetahui dan menganalisis faktor-faktor apa saja pada proses penerapan BIM 5D yang berpengaruh terhadap kinerja waktu proyek konstruksi . Metode penelitian yang digunakan adalah metode penelitian deskriptif dengan pendekatan Q-method menggunakan instrumen penelitian closed survey kepada 53 responden kontraktor/konsultan yang menggunakan BIM. Hasil yang diperoleh dari indikator 5D BIM ada 3 berpengaruh terhadap  kinerja waktu proyek konstruks

    Klasifikasi Tingkat Kematangan dan Kemasakan Buah Durian dengan Model Neural Network

    No full text
    This study was aimed to develop the model to predict the maturity and ripeness of durian based on its physical and chemical characteristics using neural network. The physicochemical and acoustic characteristics measurement was fed into the model as the inputs, which provided the levels of maturity and ripeness as the output of the model. The results suggested that the physico-chemical properties and the acoustic charcteristic decreased with the increase of both maturity and ripeness level of durian. The total solid soluble, the water content and the total sugar increased according to the fruits maturity. The total acids increased in the beginning of durian maturing process and then decreased when the maturity and ripeness level reached the mature-over ripened stage. Data training were done by model of neural network: model 4 output, with various node in the hidden layer 4, 6, 8 and 10 nodes. The results recommended that the best model to be applied was model 4 output with 4 nodes in the hidden layer and iteration 1000 and 5000 with the model accuration 87.5 % - 100%

    Holistic marketing: Integrated marketing and relationship marketing impact to marketing performance

    No full text
    This research aims to analyze internal marketing and integrated marketing on performance marketing mediated holistic marketing and impacting social urban and synergizing to relationship marketing.  Research design uses a mix method. The data source uses primary and scunder data obtained from respondents' answers. The study sample included food and beverage companies in Southeast Asia that used social media as advertising media, which numbered 124 companies. Data collection through Google form and one-way communication by sharing with company leaders. The results of the study explained that marketing performance increased due to the role of internal marketing, integrated marketing. But the negative impact of integrated marketing is the increase in social urban due to the role of relationship marketing. This is because some companies use connections or relations in decision makers in the area that is used as the location of the company and the marketing area

    Pengaruh Hydraulic Engineering Software terhadap Kinerja Waktu Pekerjaan Desain Jaringan Perpipaan Air Limbah Skala Kota

    Full text link
    Saat ini Indonesia berada pada peringkat ke 125 dalam masalah penanganan sanitasi dan air minum [1]. Pemerintah Indonesia dalam hal ini Kementerian Pekerjaan Umum dan Perumahan Rakyat (PUPR) menyusun program 100% pelayanan air minum, 0 ha permukiman kumuh perkotaan dan 100% pelayanan sanitasi [2] untuk mendongkrak tingkat pelayanan sanitasi di Indonesia antara lain dengan program perencanaan jaringan pipa dan pengolahan air limbah. Tantangan yang dihadapi dalam perencanaan ini adalah terjadinya keterlambatan [3]. Hal ini tentunya dipengaruhi oleh banyak faktor yang salah satunya masih rendahnya penggunaan Advanced Engineering Software [4]. Penggunaan software konvensional seperti Microsoft Excel masih menjadi pilihan dalam menganalisis jaringan pipa air limbah sehingga membutuhkan waktu lebih banyak dalam mendesain ataupun mengoreksi desain. Oleh karena itu, penelitian ini dilakukan untuk mengetahui faktor-faktor pada penggunaan hydraulic engineering software yang berpengaruh terhadap kinerja waktu desain jaringan pipa air limbah. Hasil analisis linear berganda menunjukkan bawah dengan penggunaan secara simultan faktor-faktor kemudahan analisis, pengelolaan skenario, desain otomatis, integrasi dengan GIS dan akurasi memberikan pengaruh positif terhadap waktu desain jaringan pipa air limbah. Dari faktor-faktor tersebut diketahui bahwa pengelolaan skenario memberikan dampak positif paling besar terhadap kinerja waktu desain pipa air limbah skala kota
    corecore