14 research outputs found

    A first nation-wide assessment of soil-transmitted helminthiasis in Fijian primary schools, and factors associated with the infection, using a lymphatic filariasis transmission assessment survey as surveillance platform

    Get PDF
    Background Soil-transmitted helminthiasis (STH) is endemic in Fiji but its prevalence is not known and likely to have changed after a decade of mass drug administration (MDA) for lymphatic filariasis (LF). By linking with LF transmission assessment surveys (LF-TAS), we undertook the first nation-wide assessment of STH in Fijian primary schools, as well as an analysis of factors associated with STH infections. Methodology/Principal findings A cross-sectional assessment for STH was conducted in all four Divisions of Fiji from 2014 to 2015. In the Western, Central, and Northern Divisions, schools were sub-sampled after LF-TAS, while, in the Eastern Division, schools were selected via simple random sampling. For the diagnosis of STH, stool samples were examined by coproscopy with a single Kato-Katz thick smear (KK) and the formol-ether-acetate concentration technique, except for the samples from the Eastern Division where only KK was used. Mean prevalence of any STH among class 1–2 students at the national level was 10.5% (95% CI: 6.9–15.5). Across the three Divisions via LF-TAS, the prevalence levels for ascariasis were 8.7% (95% CI: 4.3– 16.6), hookworm 3.9% (95% CI: 2.3–6.6) and trichuriasis 0%. In the Eastern Division, ascariasis prevalence was 13.3% (95% CI: 6.4–25.6), and hookworm 0.7% (95% CI: 0.2–2.5), with one case of trichuriasis. Among class 3–8 students, ascariasis prevalence was lower. Lower risk of any STH was associated with wearing shoes (adjusted OR 0.54, 95% CI: 0.32–0.90) and having piped water from the Fiji Water Authority at home (adjusted OR 0.48,95% CI: 0.25–0.92). Conclusions After a decade of community-based LF-MDA, STH in school-age children in Fiji is now close to 10%, but localities of endemicity remain. Preventive chemotherapy should be maintained in areas with elevated STH prevalence alongside targeted delivery of integrated WASH interventions. LF-TAS has provided an opportunity to develop future public health surveillance platforms

    Unique Ultrasonographic Findings of Isolated IgG4-Related Lymphadenopathy

    No full text
    IgG4-related disease is a rare immune-mediated disease that can involve many organs in the body. The lymph node is also where IgG4-related diseases occur, but its histological structure is different from that of other organs. For this reason, pathologists have difficulty diagnosing IgG4-related lymphadenopathy. If there were specific imaging findings of IgG4-related lymphadenopathy, it would be of great help to pathologists. A 64-year-old male visited our hospital with right ankle pain. On physical examination, the right lower extremity showed severe swelling with wound dehiscence, and infection was suspected. On CT (128-MDCT, Somatom Definition Flash, Siemens Healthcare) taken at the lower extremity, multiple enlarged lymph nodes were incidentally noted in the right inguinal area. On ultrasonography, a “starry night sign” resembling hyperechoic follicles was observed in the enlarged lymph node. A core needle biopsy was performed, and IgG4-related lymphadenopathy was diagnosed. Laboratory examination showed hypergammaglobulinemia with marked elevated serum IgG4, corresponding to IgG4-related disease. Chest and abdominal imaging were evaluated, but there was no extranodal IgG4-related disease. IgG4-related lymphadenopathy showed a very unique ultrasonography imaging finding. The cortex was filled with diffusely scattered hyperechoic foci and some bright foci gathered to form a follicle. This imaging finding may help diagnose IgG4-related lymphadenopathy

    Case report: Focal segmental glomerulosclerosis in a pediatric atypical progeroid syndrome

    No full text
    Atypical progeroid syndrome (APS) is a rare type of progeroid syndrome mainly caused by heterozygous missense mutations in the LMNA (MIM 150330) gene. APS has heterogeneous clinical manifestations, and its kidney manifestations, particularly in children, are rarely documented. Here, we report the first pediatric case of APS with focal segmental glomerulosclerosis (FSGS). A 10-year-old boy with progeroid features was referred to the nephrology clinic because of hyperuricemia. He had dark skin, protruding eyes, and beaked nose and was very thin, suggesting lipodystrophy. He had been treated for recurrent urinary tract infection during infancy, and liver biopsy for persisting hepatitis showed steatohepatitis. He also had hypertrophic cardiomyopathy (HCMP) with mitral and tricuspid valve regurgitation. Genetic studies were performed considering his multisystem symptoms, and he was diagnosed as having APS according to exome sequencing findings (c.898G > C, p.Asp300His of LMNA). During the first visit to the nephrology clinic, he had minimal proteinuria (urine protein/creatinine ratio of 0.23 mg/mg), which worsened during follow-up. In three years, his urine protein/creatinine ratio and N-acetyl-b-D-glucosaminidase/creatinine ratio increased to 1.52 and 18.7, respectively. The kidney biopsy result was consistent with findings of FSGS, peri-hilar type, showing segmental sclerosis of 1 (5%) glomerulus out of 21 glomeruli. An angiotensin receptor blocker was added to manage his proteinuria. This is the first pediatric report of FSGS in an APS patient with confirmed LMNA defect, who manifested progeroid features, lipodystrophy, HCMP with heart valve dysfunction, and steatohepatitis. Our case suggests that screening for proteinuric nephropathy is essential for managing APS patients since childhood.Y

    In Vivo Animal Study of a Highly Viscous N-butyl Cyanoacrylate Medical Adhesive for Intravenous Embolization

    No full text
    N-butyl cyanoacrylate (NBCA) is a liquid monomer that undergoes an exothermic polymerization reaction to form a solid upon initiation with hydroxyl anions. Recently, EGpresto, a highly viscous NBCA-based adhesive, has been developed for vascular-occlusion purposes. In this study, we investigated the heat of polymerization of EGpresto and compared the results with those of a low-viscosity NBCA glue. Results show that EGpresto exhibited a lower heat of polymerization (64 ± 7 °C vs. 34 ± 1 °C). This was due to its high viscosity, which resulted in a delayed polymerization time. To investigate the efficacy and safety of EGpresto for intravenous embolization, a 14 d in vivo animal test was conducted using three pigs. Five cc of EGpresto was injected into the epigastric vein of each animal. Complete postoperative vein occlusion was confirmed at 7 and 14 d by ultrasonographic visualization. After the animals were sacrificed, the operated and unoperated veins were exposed, and the injected adhesive was found without migration. During the histology, the injected adhesive was not found in the inner or outer vein walls, and the immune reactions seemed to be the only foreign-body reaction, showing that EGpresto is a non-toxic and safe intravascular embolic agent

    CEPC Technical Design Report -- Accelerator

    No full text
    International audienceThe Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s

    CEPC Technical Design Report -- Accelerator

    No full text
    International audienceThe Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s

    CEPC Technical Design Report -- Accelerator

    No full text
    The Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s

    CEPC Technical Design Report -- Accelerator

    No full text
    International audienceThe Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s

    CEPC Technical Design Report -- Accelerator

    No full text
    International audienceThe Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s
    corecore