2,522 research outputs found
Instrumentation for high-energy physics
The rst part of this summary contains a description of the passage of particles through matter. The basic physics processes for charged particles, photons, neutrons and neutrinos are mostly electromagnetic (collision losses described by Bethe-Bloch, bremsstrahlung, photo-electric effect, Compton scattering and pair production) for charged particles and photons; additional strong interactions for hadrons; neutrinos interacting weakly with matter. Concepts like radiation length, electromagnetic showers, nuclear interaction/absorption length and showers are covered. Important processes like multiple scattering, Cherenkov radiation, transition radiation, and dE=dx for particle identi cation are described next. This is followed by a short discussion of momentum measurement in magnetic elds. The last part of the summary covers particle detection by means of ionization detectors, scintillation detectors and semiconductor detectors. Signal processing is brie y discussed at the end
A primary electron beam facility at CERN
This document describes the concept of a primary electron beam facility at
CERN, to be used for dark gauge force and light dark matter searches. The
electron beam is produced in three stages: A Linac accelerates electrons from a
photo-cathode up to 3.5 GeV. This beam is injected into the Super Proton
Synchrotron, SPS, and accelerated up to a maximum energy of 16 GeV. Finally,
the accelerated beam is slowly extracted to an experiment, possibly followed by
a fast dump of the remaining electrons to another beamline. The beam parameters
are optimized using the requirements of the Light Dark Matter eXperiment, LDMX,
as benchmark
A primary electron beam facility at CERN
This paper describes the concept of a primary electron beam facility at CERN,
to be used for dark gauge force and light dark matter searches. The electron
beam is produced in three stages: A Linac accelerates electrons from a
photo-cathode up to 3.5 GeV. This beam is injected into the Super Proton
Synchrotron, SPS, and accelerated up to a maximum energy of 16 GeV. Finally,
the accelerated beam is slowly extracted to an experiment, possibly followed by
a fast dump of the remaining electrons to another beamline. The beam parameters
are optimized using the requirements of the Light Dark Matter eXperiment (LDMX)
as benchmark.Comment: 3 pages, 3 figure
The CLIC Programme: Towards a Staged e+e- Linear Collider Exploring the Terascale : CLIC Conceptual Design Report
This report describes the exploration of fundamental questions in particle
physics at the energy frontier with a future TeV-scale e+e- linear collider
based on the Compact Linear Collider (CLIC) two-beam acceleration technology. A
high-luminosity high-energy e+e- collider allows for the exploration of
Standard Model physics, such as precise measurements of the Higgs, top and
gauge sectors, as well as for a multitude of searches for New Physics, either
through direct discovery or indirectly, via high-precision observables. Given
the current state of knowledge, following the observation of a 125 GeV
Higgs-like particle at the LHC, and pending further LHC results at 8 TeV and 14
TeV, a linear e+e- collider built and operated in centre-of-mass energy stages
from a few-hundred GeV up to a few TeV will be an ideal physics exploration
tool, complementing the LHC. In this document, an overview of the physics
potential of CLIC is given. Two example scenarios are presented for a CLIC
accelerator built in three main stages of 500 GeV, 1.4 (1.5) TeV, and 3 TeV,
together with operating schemes that will make full use of the machine capacity
to explore the physics. The accelerator design, construction, and performance
are presented, as well as the layout and performance of the experiments. The
proposed staging example is accompanied by cost estimates of the accelerator
and detectors and by estimates of operating parameters, such as power
consumption. The resulting physics potential and measurement precisions are
illustrated through detector simulations under realistic beam conditions.Comment: 84 pages, published as CERN Yellow Report
https://cdsweb.cern.ch/record/147522
A scalable data taking system at a test beam for LHC
We propose the installation of a data taking system at a test beam for the simultaneous test of LHC detectors, trigger and readout electronics, together with the development of the supporting architecture in a multiprocessor environment. A strong emphasis is put on a highly modular design, such that new hardware and software developments can be conveniently introduced for training and evaluation. One of the main thrusts of the project will be the modelling and system integration of different readout architectures, which are meant to provide a valuable training ground for new techniques. To address these aspects in a realistic manner, we propose to collaborate with two detector R+D projects
The Compact Linear ee Collider (CLIC): Accelerator and Detector
The Compact Linear Collider (CLIC) is a TeV-scale high-luminosity linear
ee collider under development by international collaborations hosted by
CERN. This document provides an overview of the design, technology, and
implementation aspects of the CLIC accelerator and the detector. For an optimal
exploitation of its physics potential, CLIC is foreseen to be built and
operated in stages, at centre-of-mass energies of 380 GeV, 1.5 TeV and 3 TeV,
for a site length ranging between 11 km and 50 km. CLIC uses a two-beam
acceleration scheme, in which normal-conducting high-gradient 12 GHz
accelerating structures are powered via a high-current drive beam. For the
first stage, an alternative with X-band klystron powering is also considered.
CLIC accelerator optimisation, technical developments, and system tests have
resulted in significant progress in recent years. Moreover, this has led to an
increased energy efficiency and reduced power consumption of around 170 MW for
the 380 GeV stage, together with a reduced cost estimate of approximately 6
billion CHF. The detector concept, which matches the physics performance
requirements and the CLIC experimental conditions, has been refined using
improved software tools for simulation and reconstruction. Significant progress
has been made on detector technology developments for the tracking and
calorimetry systems. The construction of the first CLIC energy stage could
start as early as 2026 and first beams would be available by 2035, marking the
beginning of a physics programme spanning 25-30 years and providing excellent
sensitivity to Beyond Standard Model physics, through direct searches and via a
broad set of precision measurements of Standard Model processes, particularly
in the Higgs and top-quark sectors.Comment: Input to the European Particle Physics Strategy Update on behalf of
the CLIC and CLICdp Collaboration
Governance of the international linear collider project
PoS(ICHEP 2010)516 - http://pos.sissa.itInternational audienceGovernance models for the International Linear Collider Project are examined in the light of experience from similar international projects around the world. Recommendations for one path which could be followed to realise the ILC successfully are outlined
Development of fluorocarbon evaporative cooling recirculators and controls for the ATLAS inner silicon tracker
We report on the development of evaporative fluorocarbon cooling recirculators and their control systems for the ATLAS inner silicon tracker. We have developed a prototype circulator using a dry, hermetic compressor with C/sub 3/F/sup 8/ refrigerant, and have prototyped the remote-control analog pneumatic links for the regulation of coolant mass flows and operating temperatures that will be necessary in the magnetic field and radiation environment around ATLAS. pressure and flow measurement and control use 150+ channels of standard ATLAS LMB ("Local Monitor Board") DAQ and DACs on a multi-drop CAN network administered through a BridgeVIEW user interface. A hardwired thermal interlock system has been developed to cut power to individual silicon modules should their temperatures exceed safe values. Highly satisfactory performance of the circulator under steady state, partial-load and transient conditions was seen, with proportional fluid flow tuned to varying circuit power. Future developments, including a 6 kW demonstrator with ~25 cooling circuits, are outlined
- …