3,846 research outputs found

    Comparisons of the execution times and memory requirements for high-speed discrete fourier transforms and fast fourier transforms, for the measurement of AC power harmonics

    Get PDF
    Conventional wisdom dictates that a Fast Fourier Transform (FFT) will be a more computationally effective method for measuring multiple harmonics than a Discrete Fourier Transform (DFT) approach. However, in this paper it is shown that carefully coded discrete transforms which distribute their computational load over many frames can be made to produce results in shorter execution times than the FFT approach, even for large number of harmonic measurement frequencies. This is because the execution time of the presented DFT actually rises with N and not the classical N2 value, while the execution time of the FFT rises with Nlog2N

    A History of Miranda and Why It Remains Vital Today

    Get PDF

    Benchmarking and optimisation of Simulink code using Real-Time Workshop and Embedded Coder for inverter and microgrid control applications

    Get PDF
    When creating software for a new power systems control or protection device, the use of auto-generated C code via MATLAB Simulink Real-Time Workshop and Embedded Coder toolboxes can be a sensible alternative to hand written C code. This approach offers the benefits of a simulation environment, platform independence and robust code. This paper briefly summarises recent experiences with this coding process including the pros and cons of such an approach. Extensive benchmarking activities are presented, together with descriptions of simple (but non-obvious) optimisations made as a result of the benchmarking. Examples include replacement of certain Simulink blocks with seemingly more complex blocks which execute faster. "S functions" are also designed for certain key algorithms. These must be fully "in-lined" to obtain the best speed performance. Together, these optimisations can lead to an increase in execution speed of more than 1.4x in a large piece of auto-generated C code. An example is presented, which carries out Fourier analysis of 3 signals at a common (variable) frequency. The overall speed improvement relative to the baseline is 2.3x, of which more than 1.4x is due to non-obvious improvements resulting from benchmarking activities. Such execution speed improvements allow higher frame rates or larger algorithms within inverters, drives, protection and control applications

    A Proof of Entropy Minimization for Outputs in Deletion Channels via Hidden Word Statistics

    Get PDF
    From the output produced by a memoryless deletion channel from a uniformly random input of known length nn, one obtains a posterior distribution on the channel input. The difference between the Shannon entropy of this distribution and that of the uniform prior measures the amount of information about the channel input which is conveyed by the output of length mm, and it is natural to ask for which outputs this is extremized. This question was posed in a previous work, where it was conjectured on the basis of experimental data that the entropy of the posterior is minimized and maximized by the constant strings 000\texttt{000}\ldots and 111\texttt{111}\ldots and the alternating strings 0101\texttt{0101}\ldots and 1010\texttt{1010}\ldots respectively. In the present work we confirm the minimization conjecture in the asymptotic limit using results from hidden word statistics. We show how the analytic-combinatorial methods of Flajolet, Szpankowski and Vall\'ee for dealing with the hidden pattern matching problem can be applied to resolve the case of fixed output length and nn\rightarrow\infty, by obtaining estimates for the entropy in terms of the moments of the posterior distribution and establishing its minimization via a measure of autocorrelation.Comment: 11 pages, 2 figure

    Integration of a mean-torque diesel engine model into a hardware-in-the-loop shipboard network simulation using lambda tuning

    Get PDF
    This study describes the creation of a hardware-in-the-loop (HIL) environment for use in evaluating network architecture, control concepts and equipment for use within marine electrical systems. The environment allows a scaled hardware network to be connected to a simulation of a multi-megawatt marine diesel prime mover, coupled via a synchronous generator. This allows All-Electric marine scenarios to be investigated without large-scale hardware trials. The method of closing the loop between simulation and hardware is described, with particular reference to the control of the laboratory synchronous machine, which represents the simulated generator(s). The fidelity of the HIL simulation is progressively improved in this study. First, a faster and more powerful field drive is implemented to improve voltage tracking. Second, the phase tracking is improved by using two nested proportional–integral–derivative–acceleration controllers for torque control, tuned using lambda tuning. The HIL environment is tested using a scenario involving a large constant-power load step. This provides a very severe test of the HIL environment, and also reveals the potentially adverse effects of constant-power loads within marine power systems

    Polymorphic systems with arrays : decidability and undecidability

    Get PDF
    Polymorphic systems with arrays (PSAs) is a general class of nondeterministic reactive systems. A PSA is polymorphic in the sense that it depends on a signature, which consists of a number of type variables, and a number of symbols whose types can be built from the type variables. Some of the state variables of a PSA can be arrays, which are functions from one type to another. We present several new decidability and undecidability results for parameterised control-state reachability problems on subclasses of PSAs

    Influência do uso de areia lavada na taxa de respiração de um latossolo vermelho distroférrico argiloso incubado com agregados íntegros e triturados

    Get PDF
    bitstream/item/66211/1/32008.pdfFERTBIO

    Ubiquitous energy storage

    Get PDF
    This paper presents a vision of a future power system with "ubiquitous energy storage", where storage would be utilized at all levels of the electricity system. The growing requirement for storage is reviewed, driven by the expansion of distributed generation. The capabilities and existing applications of various storage technologies are presented, providing a useful review of the state of the art. Energy storage will have to be integrated with the power system and there are various ways in which this may be achieved. Some of these options are discussed, as are commercial and regulatory issues. In two case studies, the costs and benefits of some storage options are assessed. It is concluded that electrical storage is not cost effective but that thermal storage offers attractive opportunities

    Increasing security of supply by the use of a local power controller during large system disturbances

    Get PDF
    This paper describes intelligent ways in which distributed generation and local loads can be controlled during large system disturbances, using Local Power Controllers. When distributed generation is available, and a system disturbance is detected early enough, the generation can be dispatched, and its output power can be matched as closely as possible to local microgrid demand levels. Priority-based load shedding can be implemented to aid this process. In this state, the local microgrid supports the wider network by relieving the wider network of the micro-grid load. Should grid performance degrade further, the local microgrid can separate itself from the network and maintain power to the most important local loads, re-synchronising to the grid only after more normal performance is regained. Such an intelligent system would be a suitable for hospitals, data centres, or any other industrial facility where there are critical loads. The paper demonstrates the actions of such Local Power Controllers using laboratory experiments at the 10kVA scale

    The use of real time digital simulation and hardware in the loop to de-risk novel control algorithms

    Get PDF
    Low power demonstrators are commonly used to validate novel control algorithms. However, the response of the demonstrator to network transients and faults is often unexplored. The importance of this work has, in the past, justified facilities such as the T45 Shore Integration Test Facility (SITF) at the Electric Ship Technology Demonstrator (ESTD). This paper presents the use of real time digital simulation and hardware in the loop to de-risk a innovative control algorithm with respect to network transients and faults. A novel feature of the study is the modelling of events at the power electronics level (time steps of circa 2 μs) and the system level (time steps of circa 50 μs)
    corecore