266 research outputs found

    Design of flexible and adaptable healthcare buildings of the future: a BIM approach

    Get PDF
    The UK's Government Construction adviser announced that all the public construction will be implemented with BIM in the coming years. This decision affects dramatically the design phase of healthcare facilities as by 2016, BIM is mandatory in the implementation of the design process. Moreover, The UK Construction Strategy plan does not offer for investigating the multidisciplinary design space of possible solutions. The uncertainty that impacts on healthcare (demographic trends, changing patterns of disease, technological advances and clinical knowledge) has led healthcare policy makers to take action to manage demand for healthcare services and the supply enabled by healthcare infrastructure. A state of the art review of literature identified that healthcare facilities are not designed to be change-ready and that owners of such facilities have dynamic requirements. To future-proof healthcare facilities a design process is required to offer a collaborative, parametric lean construction practice that enables the design team to generate and analyse flexible healthcare building design spaces based on multi-stakeholder requirements. BIM and Integrated Project Delivery (IPD) offer dynamic decisions early in the design process. Here, IPD, the RIBA Outline Plan of Work 2012 and the BIM Guide from the Computer Integrated Construction Research Program were used to define the exact information exchange between the parties in a BIM-based construction process for change-ready healthcare facilities. A generic process map is derived from the literature for future testing and is presented in respect to the principles and philosophies of process protocol

    Supporting future-proof healthcare design by narrowing the design space of solutions using building information modelling

    Get PDF
    BIM has been characterized by the UK Government’s chief construction adviser as unstoppable regarding its rise in construction and he further positioned BIM as mandatory for public projects in the UK by 2016. Moreover, large scale public projects such as healthcare facilities must be seen as a process, being able to meet the constantly changing demands imposed on healthcare infrastructure. Facilities should be designed as change-ready rather than to meet fixed requirements, therefore, the designer should accommodate as large section of design space potential solutions instead of mistakenly narrowing the response of the project to only one solution. Scenario based design was employed as research and design method for the proposed software modules which would extend the Activity Database (ADB). Two modules are proposed that will enable designers to improve their spatial design decisions for both new and refurbishment projects through partially automated knowledge extraction. Additionally, the integration of flexibility and standardisation concepts has been addressed. The proposed design approach is intended to provide rich knowledge representation at the early stages of the design process in less time and effort

    The case for new academic workspaces

    Get PDF
    Executive summary: This report draws upon the combined efforts of a number of estates professionals, architects, academics, designers, and senior managers involved in the planning of new university buildings for the 21st century. Across these perspectives, all would agree – although perhaps for different reasons - that this planning is difficult and that a number of particular considerations apply in the design of academic workspaces. Despite these difficulties, they will also agree that when this planning goes well, ‘good’ buildings are truly transformational – for both the university as a whole and the people who work and study in them. The value of well-designed buildings goes far beyond their material costs, and endures long after those costs have been forgotten ..

    Electron gas polarization effect induced by heavy H-like ions of moderate velocities channeled in a silicon crystal

    Get PDF
    We report on the observation of a strong perturbation of the electron gas induced by 20 MeV/u U91+^{91+} ions and 13 MeV/u Pb81+^{81+} ions channeled in silicon crystals. This collective response (wake effect) in-duces a shift of the continuum energy level by more than 100 eV, which is observed by means of Radiative Electron Capture into the K and L-shells of the projectiles. We also observe an increase of the REC probability by 20-50% relative to the probability in a non-perturbed electron gas. The energy shift is in agreement with calculations using the linear response theory, whereas the local electron density enhancement is much smaller than predicted by the same model. This shows that, for the small values of the adiabaticity parameter achieved in our experiments, the density fluctuations are not strongly localized at the vicinity of the heavy ions

    Minimizing energy below the glass thresholds

    Full text link
    Focusing on the optimization version of the random K-satisfiability problem, the MAX-K-SAT problem, we study the performance of the finite energy version of the Survey Propagation (SP) algorithm. We show that a simple (linear time) backtrack decimation strategy is sufficient to reach configurations well below the lower bound for the dynamic threshold energy and very close to the analytic prediction for the optimal ground states. A comparative numerical study on one of the most efficient local search procedures is also given.Comment: 12 pages, submitted to Phys. Rev. E, accepted for publicatio

    Optimization by Quantum Annealing: Lessons from hard 3-SAT cases

    Full text link
    The Path Integral Monte Carlo simulated Quantum Annealing algorithm is applied to the optimization of a large hard instance of the Random 3-SAT Problem (N=10000). The dynamical behavior of the quantum and the classical annealing are compared, showing important qualitative differences in the way of exploring the complex energy landscape of the combinatorial optimization problem. At variance with the results obtained for the Ising spin glass and for the Traveling Salesman Problem, in the present case the linear-schedule Quantum Annealing performance is definitely worse than Classical Annealing. Nevertheless, a quantum cooling protocol based on field-cycling and able to outperform standard classical simulated annealing over short time scales is introduced.Comment: 10 pages, 6 figures, submitted to PR

    Augmenting the 6-3-5 method with design information

    Get PDF
    This paper describes a comparative study between the 6-3-5 Method and the ICR Grid. The ICR Grid is an evolved variant of 6-3-5 intended to better integrate information into the concept generation process. Unlike a conventional 6-3-5 process where participants continually sketch concepts, using the ICR Grid (the name derived from its Inform, Create, Reflect activities and structured, grid-like output) participants are additionally required to undertake information search tasks, use specific information items for concept development, and reflect on the merit of concepts as the session progresses. The results indicate that although the quantity of concepts was lower, the use of information had a positive effect in a number of areas, principally the quality and variety of output. Although grounded in the area of product development, this research is applicable to any organisation undertaking idea generation and problem solving. As well as providing insights on the transference of information to concepts, it holds additional interest for studies on the composition and use of digital libraries

    DNA barcoding cannot discriminate between Sardinella tawilis and S. hualiensis (Clupeiformes: Clupeidae)

    Get PDF
    Sardinella tawilis, the only known freshwater sardinella in the world, is endemic to Taal Lake, Philippines. Previous studies found the Taiwan sardinella, S. hualiensis, to be morphologically very similar to S. tawilis and identified it as the marine sister species of S. tawilis. In this study, DNA barcoding using the mitochondrial cytochrome c oxidase I (COI) gene was carried out to analyze species demarcation in the Sardinella genus, focusing primarily on the relationship between S. tawilis and S. hualiensis. The neighbour-joining (NJ) tree that was constructed using Kimura 2-parameter (K2P) model showed a single clade for the two species with 100% bootstrap support. K2P interspecific genetic divergence ranged from 0% to 0.522%, which is clearly below the suggested 3–3.5% cutoff for species discrimination. Recombination activating gene 1 (RAG1), mitochondrial control region (CR), cytochrome b, 16S rRNA, and S7 markers were used to further validate the results. Sardinella tawilis and S. hualiensis clustered together with a bootstrap support of 99–100% in each of the NJ trees. Low interspecific genetic distances between S. tawilis and S. hualiensis for all the markers except CR could be attributed to incipient allopatric speciation

    The advantages of information management through building information modelling

    Get PDF
    This article was published in the journal, Construction Management [© Taylor & Francis] and the definitive version is available at: http://dx.doi.org/10.1080/01446193.2013.777754As building information modelling (BIM) is positioned by governments and construction professionals as a solution to the problems in the construction industry, research is needed into the benefits BIM actually confers. The focus here is on the effectiveness of BIM as a medium for communicating information within a construction team. A case study of an offsite precast concrete fabrication facility was conducted. At the time of the study, the facility was supplying precast units for four public sector projects, and using four information management systems: e-mail, a construction project extranet tool, an Enterprise Resource Planning system and a new BIM-based system. The flow of information through the four media was measured and visualized as the projects progressed. This quantitative measurement of information flow was combined with qualitative data from interviews with facility staff. It was found that the introduction of the BIM-based system diverted information flow through the building model and away from the extranet system. The use of e-mail was largely unaffected. BIM allowed considerably more accurate, on-time and appropriate exchange of information. It is concluded it is possible to quantify some of the benefits of BIM to information management. This research paves the way for future research into the management of more construction project information linked more closely to building models
    • …
    corecore