439 research outputs found

    Design of Equipment Rack with TRIZ Method to Reduce Searching Time in Change Over Activity (Case Study : PT. Jans2en Indonesia)

    Get PDF
    Janssen is a manufacturing plant that works in furniture assembly. Component shortages often occurs, it will cause the increase of work in process (WIP) in assembly section. In previous studies, we analyze the root causes with FMEA and then it is resulted that router section is the constraint of the system. There are many non value added activities such as searching and transportation caused by a messy condition of work places and the devices that aren’t put in the right place. The impact is that the time allocated for every change over is higher than before. There are many components that are worked by the router section, so improvements are needed to minimize changes in over time. 5S method and the use of a new design of rack by TRIZ method are suggested for fixing the conditions of work environment. It is expected to eliminate non value added activities and changes in over time. Result shows that we can reduce non value activities in change over of regular components up to 41% and the elimination of this time is 41,6%. The non value activities in changeover of new items is 36,6% and this elimination of time is 53,3%. Key word : change over, kaizen, design, TRIZ metho

    User Story Software Estimation:a Simplification of Software Estimation Model with Distributed Extreme Programming Estimation Technique

    Get PDF
    Software estimation is an area of software engineering concerned with the identification, classification and measurement of features of software that affect the cost of developing and sustaining computer programs [19]. Measuring the software through software estimation has purpose to know the complexity of the software, estimate the human resources, and get better visibility of execution and process model. There is a lot of software estimation that work sufficiently in certain conditions or step in software engineering for example measuring line of codes, function point, COCOMO, or use case points. This paper proposes another estimation technique called Distributed eXtreme Programming Estimation (DXP Estimation). DXP estimation provides a basic technique for the team that using eXtreme Programming method in onsite or distributed development. According to writer knowledge this is a first estimation technique that applied into agile method in eXtreme Programming

    Teknologi Augmented Reality Sebagai Media Informasi Pemasaraan Pada Kupu-kupu Malam Car Auto-fashion

    Full text link
    Information technology is growing rapidly until recently and almost touching many areas and facilitate us in our daily activities that we do. In practice, the technology is designed to ease or alleviate human tasks. Persainganlah which spurred the development of technologies capable of growing rapidly today. One is the 3D technology, one of the interesting technologies.Augmented Reality is a technology that can combine virtual objects twodimensional or three-dimensional into a real neighborhood and then projecting the virtual objects in real time. As the title above "Augmented Reality Technology For Media Information Marketing On Kupu-kupu Malam Car Auto-Fashion", create a 3D object that is designed and combined with Augmented Reality technology can certainly be an attractive product presentation to customers.Used as an interactive catalog for 2 Dimention not a presentation that customers get but a presentation 3Dimensi. Even after combined with the technology of Augmented Reality 3D objects that have been made can be directly rotated or moved by you, so that the object can be viewed from any direction but you are moving. So the catalog is made to 3 Dimention objects can interact directly to you

    Aplikasi Six Sigma Dmaic dan Kaizen sebagai Metode Pengendalian dan Perbaikan Kualitas Produk PT. Sarandi Karya Nugraha

    Full text link
    APPLICATION OF SIX SIGMA DMAIC AND KAIZEN AS A CONTROL METHOD AND QUALITY IMPROVEMENT PRODUCTS at PT. Sarandi Karya Nugraha. PT. Sarandi Karya Nugraha is a company that engaged in health equipment and produce a hospital furniture, such as emergency trolley. In producing an average production per month, the defective product was 12.84%. This research is used to determine the ability of the process based on product defects that exist with the approach of six sigma then be controlled by analyzing the causes of disability using the Seven Tools and seeking continuous improvement by implementing Kaizen Five-Step Plan, 5W and 1H, and the Five-M checklist. After processing the data, obtained DPMO value of 29043.41 which means that from one million opportunity there will be the possibility of disability product produced as much as 29043.41. The Company is at 3.39-sigma level with CTQ (Critical To Quality) most coarse cause paint defects that 46.5% of the total disability 7490. From the analysis by means of the implementation of kaizen, the main policies that should be run by the companies that tighten controls in all areas

    Organic Fertilizer Production From Cattle Waste Vermicomposting Assisted by Lumbricus Rubellus

    Full text link
    Composting is decomposition of compound in organic waste by specific treatment using microorganism aerobically. Natural composting for producing organic fertilizer from manure and market waste utilize long time processing and less equal to the market demand. Vermicomposting is a technique to produce high quality compos fertilizer from biodegradable garbage and mixture of red worm (Lumbricus Rubellus). In conventional compos production took 8 weeks of processing time, in vermicomposting only took half processing time of conventional technique. It is occurred by red worm additional ease cellulose degradation contain in manure which is could not decomposed with composting bacteria. The purposes of this research are to investigate the effect of manure comparison to red worm growth and to evaluate the effect of comparison between manure and market waste to red worm growth. This research was conducted by vary the weight of red worm (100 gr, 200 gr, 300 gr, 400 gr, 500 gr) and market waste addition (50 gr, 100 gr, 150 gr, 200 gr, 300 gr). Moreover, 3 kg of manure was mixed by various weight of red worm, while variation of market waste addition was involved 500 gr red worm and 3 kg manure mixture. Optimum increasing weight of red worm that was obtained by 100 gr red worm addition is 160 gr within 2 weeks. In added market waste variation, the highest increasing of red worm was resulted by 50 gr market waste addition, with 60 gr increasing weight of red worm. Production of casting fertilizer was highly effected by composition of used materials such as medium, manure and red worm comparison as well as market waste additiona

    Pengaruh Kinerja Keuangan Terhadap Jumlah Penyaluran Kredit Pada PT. Bpr Setia Karib Abadi Semarang

    Full text link
    The soundness of the bank is used as a benchmark for bank management to assess whether the management of the bank had was done in line with the sound banking principles and in accordance with applicable regulations. PT.BPR Setia Karib Abadi Semarang is one company that is engaged in banking carries on business as Rural Bank. In the normal course of business of PT. BPR Setia Karib Abadi Semarang experience performing loans which fluctuate each year thereby affecting the company's financial performance and earnings. The purpose of this study to determine the influence of financial performance with CAMEL method to total loans at PT. BPR Setia Karib Abadi Semarang.This type of research is explanatory research. In this study took a sample of 4-year quarterly financial statements of the year 2009 - 2012. Technique analysis data using simple linear regression and multiple regression, with significance testing using the t test and F test with SPSS tools 17.Based on the results of analysis of CAR variable does not affect the amount of lending and give a contribution of 11.3%. KAP variables did not affect the amount of lending and contributed 0.02%. PPAP variables affect the amount of lending and influence contributed by 52.5%. ROA variable does not affect the amount of lending and give a contribution of 7.2%. ROA variable does not affect the amount of lending and give a contribution of 21.2%. LDR variables affect the amount of lending and influence contributed 70.7%. NPL variable does not affect the amount of lending and give a contribution of 0.03%. Overall financial performance of the variable does not affect the amount of lending. Conclusions and Suggestions for the company. Financial performance PT. BPR Setia Karib Abadi in healthy condition in rate of the years and have strange influence to total loans.Company mus be order to always strive to maintain the condition of its financial performance and careful - cautious in lending to bank soundness is maintained with a healthy category. Because PPAP and LDR influence on lending

    Evaluasi Pelaksanaan E-procurement Di Lingkungan Kota Tegal Tahun 2010

    Full text link
    Procurement System in Tegal has implemented e-Procurement system. In the e-Procurement system of the whole process starting from the announcement of the auction, bidding, selection, until the announcement of the winner will be made online via the website (website). Internet access by the broader community, particularly in the construction business has made e-Procurement is flexibly applied and became a necessity for modern government. e-Procurement is believed to be an instrument for good governance and improved public services because it will increase cost efficiency, effectiveness, faster cycle times, improve government accountability. From the provider of construction services, the success in participating in the auction system soon is one of the factors determining survival.Of these problems can be answered with a descriptive qualitative research data collection techniques such as observation, interviews (interviews), and literature. Techniques of data analysis done by data reduction, organization and interpretation of data.This paper is the result of studies to recognize the characteristics of the implementation of e-Procurement program money is currently in the Department of Economic Development and Regional Secretary Tegal conclusions that can be drawn from this study regarding the implementation of an electronic auction system held in Government lingungan Tegal. Some problems were encountered, the recommendations can be delivered the lack of control of IT human resources, the availability of internet connections are limited. While the government is lack of human resources, There is improvement of the system that causes Audited interfere with the comfort of the e-Procurement system services to a standstill, most of the procurement committee still have not mastered the application of e-Procurement. And from the government\u27s even harder training and development providers LPSE electronic goods, infrastructure improvements mainly problems of e-Procurement system is experiencing technical problems and technical center network
    • …
    corecore