    Design description of the Tangaye Village photovoltaic power system

    Get PDF
    The engineering design of a stand alone photovoltaic (PV) powered grain mill and water pump for the village of Tangaye, Upper Volta is described. The socioeconomic effects of reducing the time required by women in rural areas for drawing water and grinding grain were studied. The suitability of photovoltaic technology for use in rural areas by people of limited technical training was demonstrated. The PV system consists of a 1.8-kW (peak) solar cell array, 540 ampere hours of battery storage, instrumentation, automatic controls, and a data collection and storage system. The PV system is situated near an improved village well and supplies d.c. power to a grain mill and a water pump. The array is located in a fenced area and the mill, battery, instruments, controls, and data system are in a mill building. A water storage tank is located near the well. The system employs automatic controls which provide battery charge regulation and system over and under voltage protection. This report includes descriptions of the engineering design of the system and of the load that it serves; a discussion of PV array and battery sizing methodology; descriptions of the mechanical and electrical designs including the array, battery, controls, and instrumentation; and a discussion of the safety features. The system became operational on March 1, 1979

    Operational performance of the photovoltaic-powered grain mill and water pump at Tangaye, Burkina Faso (formerly Upper Volta)

    Get PDF
    A photovoltaic (PV) system powering a grain mill and water pump was installed in the remote African village of Tangaye, Burkina Faso (formerly Upper Volta) under the sponsorship of the U.S. Agency for International Development (AID) and by the National Aeronautics and Space Administration (NASA) Lewis Research Center (LeRC) in early 1979. The presence reports covers the second two years of operation from April 1981 through June 1983. During this time, the grain mill and water pump were operational 96 and 88 percent of the time respectively, and the PV system generated sufficient electricity to enable the grinding of about 111 metric tons of finely ground flow and the pumping of over 5000 cm sq of water from the 10 m deep well. The report includes a description of the current configuration of the system, a review of system performance, a discussion of the socioeconomic impact of the system on the villagers and a summary of results and conclusions covering the entire four-year period

    Operational performance of the photovoltaic-powered grain mill and water pump at Tangaye, Upper Volta

    Get PDF
    The first two years of operation of a stand alone photovoltaic (PV) power system for the village of Tangaye, Upper Volta in West Africa are described. The purpose of the experiment was to demonstrate that PV systems could provide reliable electrical power for multiple use applications in remote areas where local technical expertise is limited. The 1.8 kW (peak) power system supplies 120-V (d.c.) electrical power to operate a grain mill, a water pump, and mill building lights for the village. The system was initially sized to pump a part of the village water requirements from an existing improved well, and to meet a portion of the village grain grinding requirements. The data, observations, experiences, and conclusions developed during the first two years of operation are discussed. Reports of tests of the mills used in the project are included

    Tunisia Renewable Energy Project systems description report

    Get PDF
    In 1979, the Agency for International Development (AID) initiated a renewable energy project with the Government of Tunisia to develop an institutional capability to plan and institute renewable energy technologies in a rural area. The specific objective of the district energy applications subproject was to demonstrate solar and wind energy systems in a rural village setting. The NASA Lewis Research Center was asked by the AID Near East Bureau to manage and implement this subproject. This report describes the project and gives detailed desciptions of the various systems

    Image Reconstruction of Imatron Electron-Beam Tomography Data

    Get PDF

    Perfusion Assessment in Laparoscopic Left-Sided/Anterior Resection (PILLAR II): A Multi-Institutional Study

    Get PDF
    BackgroundOur primary objective was to demonstrate the utility and feasibility of the intraoperative assessment of colon and rectal perfusion using fluorescence angiography (FA) during left-sided colectomy and anterior resection. Anastomotic leak (AL) after colorectal resection increases morbidity, mortality, and, in cancer cases, recurrence rates. Inadequate perfusion may contribute to AL. The PINPOINT Endoscopic Fluorescence Imaging System allows for intraoperative assessment of anastomotic perfusion.Study DesignThis is a prospective, multicenter, open-label, clinical trial that assessed the feasibility and utility of FA for intraoperative perfusion assessment during left-sided colectomy and anterior resection at 11 centers in the United States.ResultsA total of 147 patients were enrolled, of whom 139 were eligible for analysis. Diverticulitis (44%), rectal cancer (25%), and colon cancer (21%) were the most prevalent indications for surgery. The mean level of anastomosis was 10 ± 4 cm from the anal verge. Splenic-flexure mobilization was performed in 81% and high ligation of the inferior mesenteric artery in 61.9% of patients. There was a 99% success rate for FA, and FA changed surgical plans in 11 (8%) patients, with the majority of changes occurring at the time of transection of the proximal margin (7%). Overall morbidity rates were 17%. The anastomotic leak rate was 1.4% (n = 2). There were no anastomotic leaks in the 11 patients who had a change in surgical plan based on intraoperative perfusion assessment with FA.ConclusionsPINPOINT is a safe and feasible tool for intraoperative assessment of tissue perfusion during colorectal resection. There were no anastomotic leaks in patients in whom the anastomosis was revised based on inadequate perfusion with FA
    corecore