54 research outputs found

    Hydrogen vs. Battery in the long-term operation. A comparative between energy management strategies for hybrid renewable microgrids

    Get PDF
    The growth of the world’s energy demand over recent decades in relation to energy intensity and demography is clear. At the same time, the use of renewable energy sources is pursued to address decarbonization targets, but the stochasticity of renewable energy systems produces an increasing need for management systems to supply such energy volume while guaranteeing, at the same time, the security and reliability of the microgrids. Locally distributed energy storage systems (ESS) may provide the capacity to temporarily decouple production and demand. In this sense, the most implemented ESS in local energy districts are small–medium-scale electrochemical batteries. However, hydrogen systems are viable for storing larger energy quantities thanks to its intrinsic high mass-energy density. To match generation, demand and storage, energy management systems (EMSs) become crucial. This paper compares two strategies for an energy management system based on hydrogen-priority vs. battery-priority for the operation of a hybrid renewable microgrid. The overall performance of the two mentioned strategies is compared in the long-term operation via a set of evaluation parameters defined by the unmet load, storage efficiency, operating hours and cumulative energy. The results show that the hydrogen-priority strategy allows the microgrid to be led towards island operation because it saves a higher amount of energy, while the battery-priority strategy reduces the energy efficiency in the storage round trip. The main contribution of this work lies in the demonstration that conventional EMS for microgrids’ operation based on battery-priority strategy should turn into hydrogen-priority to keep the reliability and independence of the microgrid in the long-term operation

    A nearly zero-energy microgrid testbed laboratory: Centralized control strategy based on SCADA system

    Get PDF
    Currently, despite the use of renewable energy sources (RESs), distribution networks are facing problems, such as complexity and low productivity. Emerging microgrids (MGs) with RESs based on supervisory control and data acquisition (SCADA) are an effective solution to control, manage, and finally deal with these challenges. The development and success of MGs is highly dependent on the use of power electronic interfaces. The use of these interfaces is directly related to the progress of SCADA systems and communication infrastructures. The use of SCADA systems for the control and operation of MGs and active distribution networks promotes productivity and efficiency. This paper presents a real MG case study called the LAMBDA MG testbed laboratory, which has been implemented in the electrical department of the Sapienza University of Rome with a centralized energy management system (CEMS). The real-time results of the SCADA system show that a CEMS can create proper energy balance in a LAMBDA MG testbed and, consequently, minimize the exchange power of the LAMBDA MG and main grid

    Joint Model Predictive Control of Electric and Heating Resources in a Smart Building

    Get PDF
    The new challenge in power systems design and operation is to organize and control smart micro grids supplying aggregation of users and special loads as electric vehicles charging stations. The presence of renewable and storage can help the optimal operation only if a good control manages all the elements of the grid. New models of green buildings and energy communities are proposed. For a real application they need an appropriate and advanced power system equipped with a building automation control system. This article presents an economic model predictive control approach to the problem of managing the electric and heating resources in a smart building in a coordinated way, for the purpose of achieving in real time nearly zero energy consumption and automated participation to demand response programs. The proposed control, leveraging a mixed integer quadratic programming problem, allows to meet manifold thermal and electric users' requirements and react to inbound demand response signals, while still guaranteeing stable operation of the building's electric and thermal storage equipment. The simulation results, performed for a real case study in Italy, highlight the peculiarities of the proposed approach in the joint handling of electric and thermal building flexibility

    Use of the INSPIRE EF data specifications to develop the SEIS-Malta geodatabase for the air quality data management

    Get PDF
    SEIS-Malta system (Shared Environmental Information System (SEIS) and web-based GIS interface) forms part of a global project on environmental monitoring funded under the 2007- 2013 Structural Funds Programme for Malta. • The project “Developing national environmental infrastructure and capacity”, is co-financed by the European Regional Development Fund (ERDF) which provides 85% of the project’s funding and the Government of Malta, which finances the rest under Malta’s Operational Programme I - Cohesion Policy 2007- 2013 “Investing in Competitiveness for a Better Quality of Life”.peer-reviewe

    Influence of LV Neutral Grounding on Global Earthing Systems

    Get PDF
    International Standards define a Global Earthing System as an earthing net created interconnecting local Earthing Systems (generally through the shield of MV cables and/or bare buried conductors). In Italy the Regulatory Authority for Electricity and Gas requires Distributors to guarantee the electrical continuity of LV neutral conductor. This requirement has led to the standard practice of realizing “reinforcement groundings” along the LV neutral conductor path and at users’ delivery cabinet. Moreover, in urban high load scenarios (prime candidates to be part of a Global Earthing System), it is common that LV distribution scheme creates, trough neutral conductors, an effective connection between grounding systems of MV/LV substations, modifying Global Earthing System consistency. Aim of this paper is to evaluate the effect, in terms of electrical safety, of the above mentioned LV neutral distribution scheme when an MV-side fault to ground occurs. At this purpose simulations are carried out on a realistic urban test case and suitable evaluation indexes are proposed

    A Practical Method to Test the Safety of HV/MV Substation Grounding System

    Get PDF
    The adequacy of a Grounding System (GS) to the safety conditions has to be periodically tested by measurements. The test methods and techniques used to verify the electrical characteristics of the GS include the measurements of step and touch voltages. The goal of the test is to verify that touch voltage and step voltage remain below a safe value in all the zones of the installation. The measurements can present some operational difficulties. The purpose of this paper is to present the procedure, step-by-step, of a practical method of measuring touch/step voltages in grounding systems located in urban or industrial areas with reduced accessibility. The suggested method uses auxiliary current electrodes located at short distances. This paper demonstrates by test measurements done in a real case that the method provides conservative results
    • …
    corecore