16 research outputs found

    A two-step lineage reprogramming strategy to generate functionally competent human hepatocytes from fibroblasts

    Get PDF
    Terminally differentiated cells can be generated by lineage reprogramming, which is, however, hindered by incomplete conversion with residual initial cell identity and partial functionality. Here, we demonstrate a new reprogramming strategy by mimicking the natural regeneration route, which permits generating expandable hepatic progenitor cells and functionally competent human hepatocytes. Fibroblasts were first induced into human hepatic progenitor-like cells (hHPLCs), which could robustly expand in vitro and efficiently engraft in vivo. Moreover, hHPLCs could be efficiently induced into mature human hepatocytes (hiHeps) in vitro, whose molecular identity highly resembles primary human hepatocytes (PHHs). Most importantly, hiHeps could be generated in large quantity and were functionally competent to replace PHHs for drug-metabolism estimation, toxicity prediction and hepatitis B virus infection modeling. Our results highlight the advantages of the progenitor stage for successful lineage reprogramming. This strategy is promising for generating other mature human cell types by lineage reprogramming.</p

    Ikzf1 promotes terminal differentiation of mouse fetal liver derived erythroid cells

    No full text
    Objective To explore potential function of IKAROS family zinc finger 1 (Ikzf1) in terminal erythroid differentiation. Methods Single-cell regulatory network inference and clustering (SCENIC) was used to predict transcription factors of terminal erythroid differentiation based on single cell transcriptomes of human and mouse bone marrow erythroid cells. Expression of the predicted Ikzf1 during terminal erythroid differentiation was acquired from public RNA-seq data and validated by RT-qPCR. Short hairpin RNA (shRNA) interference was performed to knock down Ikzf1 in mouse erythroid cells from fetal liver with a GFP cassette to mark successfully transfected cells. The knockdown efficiency in GFP+ cells was verified by RT-qPCR. The effect of Ikzf1 knockdown on erythroid differentiation and enucleation was analyzed by flow cytometry. Results SCENIC predicted that the transcription factor Ikzf1 regulated both human and mouse erythroid differentiation. RNA-seq data and RT-qPCR showed highly expressed Ikzf1 at proerythroblast and basophilic erythroblast stages of terminal erythroid differentiation. Ikzf1 expression was indeed down-regulated by shRNA in erythroid cells from mouse fetal liver. Flow cytometry analysis showed that knockdown of Ikzf1 affected terminal differentiation and significantly reduced the ratio of erythroid enucleation (P< 0.05). Conclusions Transcription factor Ikzf1 is highly expressed in early stage erythroblasts and involved in terminal erythroid differentiation as well as enucleation

    Tumor endothelial cell-derived cadherin-2 promotes angiogenesis and has prognostic significance for lung adenocarcinoma

    No full text
    Abstract In lung cancer, antiangiogenic strategies targeting tumor-derived endothelial cells (TECs) afford a survival advantage, but the characteristics of TECs have not been comprehensively elucidated. Herein, high-purity (> 98%) TECs were obtained, and these cells retained expression of EC markers and exhibited high viability. ITRAQ-2DLC-MS/MS was performed to profile the proteome and the heterogeneity of ECs. Only 31 of 1820 identified proteins were differentially expressed between adenocarcinoma (ADC)- and squamous cell carcinoma (SCC)-derived TECs (TEC-A and TEC-S, respectively), and cadherin-2 (CDH2) was the most significantly upregulated protein in TEC-A samples. Positive immunostaining for CDH2 (score > 3) was significantly more frequent in the endothelium of ADC tissues than in that of SCC tissues. Loss- or gain-of-function analysis showed that CDH2 significantly promoted in vitro and in vivo angiogenesis and sensitivity to the antagonist exherin. The MAPK/ERK and MAPK/JNK signaling pathways may play crucial roles in CDH2-induced HIF-1α/VEGF-mediated angiogenesis. Moreover, high CDH2 expression in TECs was significantly associated with tumor stage, visceral pleural metastasis, and decreased overall survival in patients with ADC but not SCC. Together, these data indicate the importance of CDH2 in angiogenesis and highlight its potential both for antiangiogenic therapy and as a candidate prognostic marker for ADC

    CEPC Technical Design Report -- Accelerator

    No full text
    International audienceThe Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s

    CEPC Technical Design Report -- Accelerator

    No full text
    International audienceThe Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s

    CEPC Technical Design Report -- Accelerator

    No full text
    The Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s
    corecore