15 research outputs found

    Antioxidant Activities of Plumbagin and Its Cu (II) Complex

    Get PDF
    Plumbagin and its Cu (II) complex [Cu (plumbagin)2]·H2O have been synthesized, and their antioxidant activities towards the inhibitory effect on DPPH free radical, reducing power, total antioxidant capacity, and inhibition on lipid peroxidation were investigated. Plumbagin and its Cu (II) complex were found to exhibit scavenging activities on DPPH radical with the inhibitory rate of 41% and 24%, respectively. The reducing power of plumbagin was outstanding at the concentrations of 1.0, 1.5, and 2.0 mg/mL, compared to Cu (II) complex and synthetic antioxidant 2,6-di-ter-butyl-4-methylphenol (BHT); the highest level reached 1.333 for plumbagin and 0.581 for Cu (II) complex. Also, the inhibition on lipid peroxidation of plumbagin was higher than that of Cu (II) complex and BHT, 46.4% for plumbagin and 24.5% for Cu (II) complex. The results give a strong impact for designing anticancer drugs, combined with their potential cytotoxic and antioxidant activities, which can be targeted selectively against cancer cells and increase their therapeutic index and additional advantages over other anticancer drugs

    Fluorescence Spectroscopy Study on the Interaction between Evodiamine and Bovine Serum Albumin

    No full text
    The interaction of evodiamine (Evo) with bovine serum albumins (BSAs) at different two temperatures (298 and 310 K) was investigated by means of fluorescence spectroscopy. The experimental results showed that Evo binds with BSA via a static quenching procedure with association constants K of 1.61×106 L/mol at 298 K and 6.78×105 L/mol at 310 K. The number of bound Evo molecules per protein is 1.31 at 298 K and 1.33 at 310 K. The results suggested that Evo reacts with BSA chiefly through hydrophobic and electrostatic interactions, and it does not alter the α-helical nature of BAS

    Synthesis and Characterization of High Efficiency and Stable Spherical Ag3PO4 Visible Light Photocatalyst for the Degradation of Methylene Blue Solutions

    No full text
    A facile method for the synthesis of Ag3PO4 visible light photocatalyst has been developed to improve the photocatalytic activity and stability. The as-prepared samples are investigated by X-ray powder diffraction, scanning electron microscopy, infrared spectroscopy, photoluminescence (PL) spectroscopy, and UV-Vis diffuse reflectance spectroscopy techniques. The results reveal that the prepared Ag3PO4 has cube structure with a band gap of 2.26 eV. The as-prepared samples show higher photocatalytic activity for methylene blue (MB) degradation than that of N-TiO2 under visible light irradiation

    Novel Approach for Fine Ilmenite Flotation Using Hydrophobized Glass Bubbles as the Buoyant Carrier

    No full text
    Ilmenite disseminated grain size is relatively fine, and it must be finely ground to fully separate ilmenite from gangue and then produce fine-grained minerals, which deteriorates flotation. A novel method using buoyant carriers to improve the recovery of fine ilmenite in froth flotation was introduced in this study. Hydrophobized glass bubbles (HGB) as carrier materials were obtained by an efficient, simple modification of ordinary glass bubbles. The carrier flotation of fine ilmenite in the presence of HGB was investigated by micro flotation tests, X-ray diffractometer analysis, Fourier transform infrared (FTIR), optical microscope observation, and the extended DLVO theory (XDLVO). Micro-flotation results showed that the recovery of fine ilmenite in presence of HGB was 37.7% higher than that when using NaOL alone at pH 6. FTIR analysis and optical microscope observation revealed that fine ilmenite particles can be closely attached on the HGB surface to increase apparent particle size considerably. The data calculated from the DLVO theory indicated that the acid–base interaction force determined the adsorption between two hydrophobic particles

    CEPC Technical Design Report -- Accelerator

    No full text
    The Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s

    CEPC Technical Design Report -- Accelerator

    No full text
    International audienceThe Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s

    CEPC Technical Design Report -- Accelerator

    No full text
    International audienceThe Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s

    CEPC Technical Design Report -- Accelerator

    No full text
    International audienceThe Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s
    corecore