6 research outputs found

    Entropía de la información derivada de los estados operativos en los bloques energéticos

    Get PDF
    The article proposes a method to reduce the volume of data to be handled during the exploitation of the energetic information, applying new and more efficient calculating algorisms, which through generating patterns and the definition of the states and modes of operation, might reduce the amount of operation, making valid the concept of Information Entropy; being the latest applied in shaping Monitors Risk New Generation, which properties are distinctive to other tools used to analyze the working capacity in real time.El artículo propone un método para reducir el volumen de datos a manejar durante la explotación de los bloques energéticos, aplicando nuevos algoritmos de cálculos más eficientes, los cuales mediante la generación de patrones y la definición de los estados y modos de operación reducen la cantidad de información, haciendo válido el concepto de Entropía de la Información, esta última aplicada y desarrollada en la configuración de los Monitores de Riesgos de Nueva Generación, cuyas propiedades son distintivas ante otras herramientas, utilizadas para el análisis del estado de capacidad de trabajo en tiempo real

    Defensa en profundidad para la evaluación de riesgos laborales por ruido en termoeléctrica

    No full text
    Introducción: Las técnicas de evaluación de riesgos laborales se llevan a cabo por diferentes procedimientos, a través de las aplicaciones de métodos normativos del cumplimiento de los parámetros asociados con las mediciones de los umbrales de daño a la salud del hombre. Sin embargo, no se tienen en cuenta los principios básicos de seguridad, que incluyen las experiencias de buenas prácticas en industrias de altos requisitos de seguridad y disponibilidad. Objetivos: El objetivo de este artículo es proponer un método bajo el enfoque de defensa en profundidad para evaluar los riesgos laborales por ruido en la Central Termoeléctrica (CTE) de 100 MW. Material y Métodos: Se aplicó la técnica de entrevistas a técnicos y especialistas en seguridad y salud del trabajo, así como tecnólogos para explorar los elementos que tomaban en cuenta en la evaluación de los riesgos laborales por ruido, y se realizó la consulta a especialistas para precisar los elementos que debían formar parte de los aspectos de seguridad de acuerdo al método propuesto. Además Se realizó la evaluación de los riesgos laborales por ruido de acuerdo a dos metodologías implementadas con anterioridad y la propuesta. Resultados: Se muestran de acuerdo a las tres metodologías. Se determinó que la generación de ruidos no es un aspecto significativo a tener en cuenta, para la metodología 1, se evidenció una dispersión del nivel sonoro, con tendencia estable a los valores máximos en determinadas áreas según la Norma Cubana de ruido, para la metodología 2 mientras que para la metodología 3, los aspectos de seguridad evaluados negativamente por cada escalón, son los que se requieren tomar medidas correctivas dirigidas a modificar los ítems calificados negativamente a positivos para elevar el nivel de seguridad. Conclusiones: La evaluación empleando escalones de defensa en profundidad aplicado a los riesgos laborales posibilita un análisis con el enfoque de procesos, que permite estimar la contribución relativa y sus causas, así como resolverlas en un corto plazo

    Deep defense to asses labor risks for noise in power station

    No full text
    Originales[ES] Introducción: Las técnicas de evaluación de riesgos laborales se llevan a cabo por diferentes procedimientos, a través de las aplicaciones de métodos normativos del cumplimiento de los parámetros asociados con las mediciones de los umbrales de daño a la salud del hombre. Sin embargo, no se tienen en cuenta los principios básicos de seguridad, que incluyen las experiencias de buenas prácticas en industrias de altos requisitos de seguridad y disponibilidad. Objetivos: El objetivo de este artículo es proponer un método bajo el enfoque de defensa en profundidad para evaluar los riesgos laborales por ruido en la Central Termoeléctrica (CTE) de 100 MW. Material y Métodos: Se aplicó la técnica de entrevistas a técnicos y especialistas en seguridad y salud del trabajo, así como tecnólogos para explorar los elementos que tomaban en cuenta en la evaluación de los riesgos laborales por ruido, y se realizó la consulta a especialistas para precisar los elementos que debían formar parte de los aspectos de seguridad de acuerdo al método propuesto. Además Se realizó la evaluación de los riesgos laborales por ruido de acuerdo a dos metodologías implementadas con anterioridad y la propuesta. Resultados: Se muestran de acuerdo a las tres metodologías. Se determinó que la generación de ruidos no es un aspecto significativo a tener en cuenta, para la metodología 1, se evidenció una dispersión del nivel sonoro, con tendencia estable a los valores máximos en determinadas áreas según la Norma Cubana de ruido, para la metodología 2 mientras que para la metodología 3, los aspectos de seguridad evaluados negativamente por cada escalón, son los que se requieren tomar medidas correctivas dirigidas a modificar los ítems calificados negativamente a positivos para elevar el nivel de seguridad. Conclusiones: La evaluación empleando escalones de defensa en profundidad aplicado a los riesgos laborales posibilita un análisis con el enfoque de procesos, que permite estimar la contribución relativa y sus causas, así como resolverlas en un corto plazo.[EN] Abstract: The labour risks evaluation techniques are carried out using several methods, through the application of normative methods applying the execution of the parameters associated with the measurements of the men’s health damage thresholds. Basic security principles are nevertheless not taken into account, which enclose the good practices experiences in high-requirement security and availability industries.Objectives: The purpose of this article is to propose a method attending on the defence in depth in order to evaluate the noise labour risks in the Thermal Power Station (TPS) of 100 MW.Material and Methods: In order to explore the elements considered in the evaluation of the noise labours risks, interviews to technicians and specialists in labour security and health were taken. It was carried out the consultation to specialists in order to specify the elements that should be part of the security aspects according to the nominative method. The evaluation of the labours risks for noise together with the proposal were also carried out according to two methodologies prior employed. Results: three methodologies were used. It was determined that the noise generation is not a significant aspect to keep in mind for the methodology 1. For the methodology 2 it was demonstrated a dispersion of the noise level with stable tendency to the maximal values in determining areas according to the Noise Cuban Norm, while for the methodology 3, the security aspects negatively evaluated for each step, are those which require to take corrective measures implemented to modify the negatively-qualified items to positive in order to raise the security level. Conclusions: The evaluation using the depth security levels applied to the labour risks allows to estimate an analysis with the process approach, that allow not only to esteem the relative contribution and its causes but to resolve them in a short-term period.N

    Avaliação de árvores de falhas mediante uma planilha EXCEL

    No full text
    The present paper was dedicated to the evaluation of fault trees through an EXCEL worksheet. The determination of the Minimal Cut Sets (MCSs) was accomplished performing all possible combinations of the basic events that take part of the tree. The method prevents the calculation from collapsing due to a combinatorial explosion. The available memory is never a limitation. It was applied the factorization of non-repeated events, a recursive method for the generation of the events combinations and an ordering scheme giving priority to the components which are more repeated and appear closer to the top gate. The EXCEL worksheet determines the most important MCSs, the system failure probability, and the components importance measures. Instantaneous unavailability analysis is also possible. The results for two representative fault trees are presented. They were resolved in a reasonable time, showing an adequate performance for industrial applications of moderate complexity.O presente trabalho foi dedicado à avaliação de árvores de falhas mediante uma planilha EXCEL. A determinação dos Cortes Mínimos (CM) foi realizada formando todas as combinações possíveis dos eventos básicos que integram a árvore. O método impede que o cálculo colapse por explosão combinatória. A memória disponível nunca constitui uma limitação. Foi aplicada a fatoração de eventos não repetidos, um método recursivo para a formação das combinações de eventos e um ordenamento dos componentes que da prioridade aos mais repetidos e próximos do portão topo. A planilha EXCEL determina os CM mais importantes, a probabilidade de falha do sistema e as medidas de importância dos componentes. Também são possíveis análises de indisponibilidade instantânea. São apresentados os resultados para duas árvores de falhas representativas que foram resolvidas em tempos razoáveis, mostrando um desempenho adequado para aplicações industriais de moderada complexidade.El presente trabajo fue dedicado a la evaluación de árboles de fallos mediante una planilla EXCEL. La determinación de los Cortes Mínimos (CM) fue realizada formando todas las combinaciones posibles de los sucesos básicos que integran el árbol. El método impide que el cálculo colapse por explosión combinatoria. La memoria disponible nunca constituye una limitación. Fue aplicada la factorización de sucesos no repetidos, un método recursivo para la formación de las combinaciones y un ordenamiento de los componentes que prioriza los más repetidos y próximos a la puerta tope. La planilla EXCEL determina los CM más importantes, la probabilidad de fallo del sistema y las medidas de importancia de los componentes. También son posibles análisis de indisponibilidad instantánea. Se presentan los resultados para dos árboles de fallos representativos que fueron resueltos en tiempos razonables, mostrando un desempeño adecuado para uso en aplicaciones industriales de moderada complejidad

    Análisis de confiabilidad y riesgo de una instalación experimental para el tratamiento de aguas residuales//Reliability and risk analysis of an experimental set-up for wastewater treatment

    No full text
    Una de las exigencias modernas para el uso de equipos en todas las ramas de la economía, la ciencia y la educación, es su explotación segura. En este trabajo, se realizó el análisis de confiabilidad y riesgo de una instalación experimental para el tratamiento de aguas residuales con radiación ultravioleta. Se empleó la técnica del árbol de fallos y se analizaron dos variantes de cálculo. La primera variante consideró fuentes no confiables de suministro de energía eléctrica y la segunda consideró la existencia de fuentes confiables. Como resultado se identificaron 20 conjuntos mínimos de corte, 12 de primer orden y 8 de tercer orden. Además, se infirió, la necesidad de contar con una fuente alternativa de electricidad y que esimportante establecer redundancia de grupo de componentes para instalaciones a escala industrial. El análisis demostró que la instalación es segura para su uso en la experimentación a escala de laboratorio.Palabras claves: confiabilidad, riesgo, instalación experimental, tratamiento de aguas residuales, radiación ultravioleta, árbol de fallos.______________________________________________________________________________AbstractOne of the modern requirements for using equipments in all the areas of economy, science and education, is its safety operation. In this work, it was carried out the reliability and risk analysis of an experimental setup for the wastewater treatment with ultraviolet radiation. The fault tree technique was used and two variants of calculation were analyzed. The first variant considered unreliable sources of electricity supply and the second considered the existence of reliable sources. As a result, 20 minimal cut sets were identified 12 of first-order and 8 of third-order. Besides, the necessity of an alternative supply electrical power source was inferred and it is important to establish redundant components group for industrial scalefacilities. The analysis demostrated the set-up is safety for its use in the laboratory.Key words: reliability, risk, experimental set-up, wastewater treatment, ultraviolet radiation, fault tree.</p