14 research outputs found

    AN ANALYSIS OF TAZKARA HAZAR DASTAAN KNOWN AS KHUMKNANAE JAVEED BY LALA SRI RAM

    Get PDF
    Tazkara is a type of biography in Urdu literature. In Tazkara the researcher compiles the data and events of the lives of poets and other literary personalities. Tazkara Hazar Dastaan known as Khumkhanae Javeed was gathered by Lala Sri Ram. This biography consists of Six volumes. There are 689 pages in Volume 1 and a list of 634 poets according to the Urdu alphabet ا تا بby poetic names included in it. Volume 2 consists of 751 pages with a list of 485 poets by poetic names according to پ تا ح.  Volume 3 consists of 737 pages with a list of 534 poets by poetic names according to خ تا ز. Volume 4 consists of 628 pages with a list of 421 poets by poetic names according to س تا ش. Volume 5 consists of 616 pages with a list of 647 poets by poetic names according to ش تا ع. Volume 6 consists of 556 pages with a list of 458 poets by poetic names according to ع تا ے. There are 3977 pages and 3179 poets in all volumes. It is a remarkable work. In this article, this biography is critically analyzed

    Effect of foliar application of nano-nutrients solution on growth and biochemical attributes of tomato (Solanum lycopersicum) under drought stress

    Get PDF
    IntroductionDrought stress has drastically hampered the growth and yield of many crops. Therefore, environmentally safe agricultural techniques are needed to mitigate drought stress impact. To this end, foliar spray of nano-nutrients solution to (NNS) alleviate harmful aspects of drought stress.MethodsIn a completely randomized design (CRD) experiment, seedlings were transplanted into pots at 2-3 leaf stage, each filled with loam-compost- organic manure soil (3:1:1). Plants were divided into two groups. (a) control group (b) applied stress group. Plants at vegetative stage were treated with 100% FC for control group and 60% FC for drought group, and these levels were maintained until harvesting. Three treatments of NNS with four levels i.e., 0%, 1%, 3% and 5% were given to all the pots after two weeks of drought stress treatment with a gap of 5 days at vegetative stage.Results and discussionApplication of 1% of nano-nutrient solution displayed an improvement in shoot length, shoot fresh and dry weight, number of leaves and flowers. Leaf chlorophylls and carotenoids and total phenolics contents were found maximum while minimum electrolyte leakage was observed at 3% application compared to control. Further, 1% application of NNS increased the Leaf RWC%, total soluble sugars, flavonoids contents. 5% NNS application exhibited higher total free amino acids with minimum lipid peroxidation rate in leaves of tomato under drought. Antioxidant enzyme activities increased in a concentration dependent manner as gradual increase was observed at 1%, 3% and 5%, respectively. Overall, this study introduced a new insights on using nano-nutrient solutions to maintain natural resources and ensure agricultural sustainabilit

    The Rv3874-Rv3875 chimeric protein shows a promiscuous serodiagnostic potential for tuberculosis.

    No full text
    Tuberculosis (TB) stays a major cause of death globally after COVID-19 and HIV. An early diagnosis to control TB effectively, needs a fast reliable diagnostic method with high sensitivity. Serodiagnosis involving polyclonal antibodies detection against an antigen of Mycobacterium tuberculosis (Mtb) in serum samples can be instrumental. In our study, Rv3874 and Rv3875 antigens were cloned, expressed, and purified individually and as a chimeric construct in Escherichia coli BL21. Enzyme-Linked Immunosorbent Assay (ELISA) based findings revealed that the Rv3874-Rv3875 chimeric construct was two-fold more sensitive (59.7%) than the individual sensitivities of Rv3874 (28.4%) and Rv3875 (24.9%) for 201 serum TB positive samples. Furthermore, the fusion construct was a little more sensitive (60.4%) for male subjects than that for females (58.8%). Lastly, our preliminary findings, molecular insights of secondary structure, and statistical and in silico analysis of each construct also advocate that CEP can be considered a better immunodiagnostic tool in addition to previously reported EC skin test

    CEPC Technical Design Report -- Accelerator

    No full text
    International audienceThe Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s

    CEPC Technical Design Report -- Accelerator

    No full text
    International audienceThe Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s

    CEPC Technical Design Report -- Accelerator

    No full text
    The Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s

    CEPC Technical Design Report -- Accelerator

    No full text
    International audienceThe Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s

    CEPC Technical Design Report -- Accelerator

    No full text
    International audienceThe Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s
    corecore