18 research outputs found

    Cargo-Positioning System for Next-Generation Spacecraft

    Get PDF
    A report discusses a proposed system for mounting loaded pallets in the cargo bay of a next-generation space-shuttle-like spacecraft, such that the center of mass of the cargo would lie within a 1-in. (2.54-cm) cube that would also contain the center of mass of the spacecraft. The system would include (1) an algorithm for planning the locations of the pallets, given the geometric and weight properties of the pallets, and the geometric restrictions of the cargo bay; (2) quick-connect/quick-disconnect mounting mechanisms similar to those now used on air hoses; (3) other mounting mechanisms, comprising mostly spring-loaded pins, in a locking subsystem that would prevent shifting of the pallets under load; and (4) mechanisms for performing fine position adjustments to satisfy the center-of-mass requirement. The position- adjusting mechanisms would be motor-driven lead-screw mechanisms in groups of three - one for positioning each pin of the locking subsystem along each of three mutually perpendicular coordinate axes. The system also would include a triple-threaded screw that would provide compensation for thermal expansion or contraction of the spacecraft

    Affordability Approaches for Human Space Exploration

    Get PDF
    The design and development of historical NASA Programs (Apollo, Shuttle and International Space Station), have been based on pre-agreed missions which included specific pre-defined destinations (e.g., the Moon and low Earth orbit). Due to more constrained budget profiles, and the desire to have a more flexible architecture for Mission capture as it is affordable, NASA is working toward a set of Programs that are capability based, rather than mission and/or destination specific. This means designing for a performance capability that can be applied to a specific human exploration mission/destination later (sometime years later). This approach does support developing systems to flatter budgets over time, however, it also poses the challenge of how to accomplish this effectively while maintaining a trained workforce, extensive manufacturing, test and launch facilities, and ensuring mission success ranging from Low Earth Orbit to asteroid destinations. NASA Marshall Space Flight Center (MSFC) in support of Exploration Systems Directorate (ESD) in Washington, DC has been developing approaches to track affordability across multiple Programs. The first step is to ensure a common definition of affordability: the discipline to bear cost in meeting a budget with margin over the life of the program. The second step is to infuse responsibility and accountability for affordability into all levels of the implementing organization since affordability is no single person s job; it is everyone s job. The third step is to use existing data to identify common affordability elements organized by configuration (vehicle/facility), cost, schedule, and risk. The fourth step is to analyze and trend this affordability data using an affordability dashboard to provide status, measures, and trends for ESD and Program level of affordability tracking. This paper will provide examples of how regular application of this approach supports affordable and therefore sustainable human space exploration architecture

    Model-Based Systems Engineering Pathfinder: Informing the Next Steps

    Get PDF
    In 2016, the NASA Engineering and Safety Center established a model-based systems engineering (MBSE) Pathfinder. The primary motivations for establishing the MBSE Pathfinder were to advance the Agency's applications of MBSE and capture lessons-learned to inform the next steps. The MBSE Pathfinder had four teams working in parallel for eight months on different topics of interest to NASA. The teams were encouraged to learn, and use creativity and innovation in their system modeling. The results were captured via reports, webinars, and a knowledge capture meeting. The approach taken for the MBSE Pathfinder was very successful in providing a number of lessons-learned for NASA and for other organizations considering MBSE or pathfinder efforts, and in building a very strong and collaborative user community

    Space Launch System Upper Stage Technology Assessment

    Get PDF
    The Space Launch System (SLS) is envisioned as a heavy-lift vehicle that will provide the foundation for future beyond low-Earth orbit (LEO) exploration missions. Previous studies have been performed to determine the optimal configuration for the SLS and the applicability of commercial off-the-shelf in-space stages for Earth departure. Currently NASA is analyzing the concept of a Dual Use Upper Stage (DUUS) that will provide LEO insertion and Earth departure burns. This paper will explore candidate in-space stages based on the DUUS design for a wide range of beyond LEO missions. Mission payloads will range from small robotic systems up to human systems with deep space habitats and landers. Mission destinations will include cislunar space, Mars, Jupiter, and Saturn. Given these wide-ranging mission objectives, a vehicle-sizing tool has been developed to determine the size of an Earth departure stage based on the mission objectives. The tool calculates masses for all the major subsystems of the vehicle including propellant loads, avionics, power, engines, main propulsion system components, tanks, pressurization system and gases, primary structural elements, and secondary structural elements. The tool uses an iterative sizing algorithm to determine the resulting mass of the stage. Any input into one of the subsystem sizing routines or the mission parameters can be treated as a parametric sweep or as a distribution for use in Monte Carlo analysis. Taking these factors together allows for multi-variable, coupled analysis runs. To increase confidence in the tool, the results have been verified against two point-of-departure designs of the DUUS. The tool has also been verified against Apollo moon mission elements and other manned space systems. This paper will focus on trading key propulsion technologies including chemical, Nuclear Thermal Propulsion (NTP), and Solar Electric Propulsion (SEP). All of the key performance inputs and relationships will be presented and discussed in light of the various missions. For each mission there are several trajectory options and each will be discussed in terms of delta-v required and transit duration. Each propulsion system will be modeled, sized, and judged based on their applicability to the whole range of beyond LEO missions. Criteria for scoring will include the resulting dry mass of the stage, resulting propellant required, time to destination, and an assessment of key enabling technologies. In addition to the larger metrics, this paper will present the results of several coupled sensitivity studies. The ultimate goals of these tools and studies are to provide NASA with the most mass-, technology-, and cost-effective in-space stage for its future exploration missions

    Space Launch System Mission Flexibility Assessment

    Get PDF
    The Space Launch System (SLS) is envisioned as a heavy lift vehicle that will provide the foundation for future beyond low Earth orbit (LEO) missions. While multiple assessments have been performed to determine the optimal configuration for the SLS, this effort was undertaken to evaluate the flexibility of various concepts for the range of missions that may be required of this system. These mission scenarios include single launch crew and/or cargo delivery to LEO, single launch cargo delivery missions to LEO in support of multi-launch mission campaigns, and single launch beyond LEO missions. Specifically, we assessed options for the single launch beyond LEO mission scenario using a variety of in-space stages and vehicle staging criteria. This was performed to determine the most flexible (and perhaps optimal) method of designing this particular type of mission. A specific mission opportunity to the Jovian system was further assessed to determine potential solutions that may meet currently envisioned mission objectives. This application sought to significantly reduce mission cost by allowing for a direct, faster transfer from Earth to Jupiter and to determine the order-of-magnitude mass margin that would be made available from utilization of the SLS. In general, smaller, existing stages provided comparable performance to larger, new stage developments when the mission scenario allowed for optimal LEO dropoff orbits (e.g. highly elliptical staging orbits). Initial results using this method with early SLS configurations and existing Upper Stages showed the potential of capturing Lunar flyby missions as well as providing significant mass delivery to a Jupiter transfer orbit

    Enhanced Feasibility Assessment of Payload Adapters for NASAs Space Launch System

    Get PDF
    The first flight of NASAs new exploration-classlaunch vehicle, the Space Launch System (SLS), will test amyriad of systems designed to enable the next generation of deepspace human spaceflight, and launch from Kennedy SpaceCenter no earlier than December 2019. The initial Block 1configuration for EM-1 will be capable of lofting at least 70metric tons (t) of payload and send the Orion crew vehicle intoa distant retrograde lunar orbit, paving the way for future crewmissions to cislunar space and eventually Mars. A Block 1Bversion of SLS will lift at least 34 t to trans-lunar injection (TLI)in its crew configuration and at least 37 t to TLI in its cargoconfiguration no earlier than 2024. For Mars-class payloads,larger fairings and payload adapters for the Block 2 cargovehicle are under consideration. For missions beyond the Earth-Moon system, SLS offers greater characteristic energy (C3)than any other launch vehicle, enabling shorter transit times orheavier payloads with more robust science packages formissions to the outer solar system. Indeed, the unmatchedcombination of thrust, payload volume and departure energythat SLS provides opens new opportunities for human androbotic exploration of deep space

    SLS Dual Use Upper Stage (DUUS) Opportunities

    Get PDF
    Objective: Provide an overview of SLS DUUS type capability requirements to provide context for possible International Partner collaboration. Addition of a DUUS would greatly increase exploration mission capture and performance margin for cis-Lunar and Near Earth System exploration campaigns

    Common Data Acquisition Systems (DAS) Software Development for Rocket Propulsion Test (RPT) Test Facilities - A General Overview

    Get PDF
    The advent of the commercial space launch industry and NASA's more recent resumption of operation of Stennis Space Center's large test facilities after thirty years of contractor control resulted in a need for a non-proprietary data acquisition system (DAS) software to support government and commercial testing. The software is designed for modularity and adaptability to minimize the software development effort for current and future data systems. An additional benefit of the software's architecture is its ability to easily migrate to other testing facilities thus providing future commonality across Stennis. Adapting the software to other Rocket Propulsion Test (RPT) Centers such as MSFC, White Sands, and Plumbrook Station would provide additional commonality and help reduce testing costs for NASA. Ultimately, the software provides the government with unlimited rights and guarantees privacy of data to commercial entities. The project engaged all RPT Centers and NASA's Independent Verification & Validation facility to enhance product quality. The design consists of a translation layer which provides the transparency of the software application layers to underlying hardware regardless of test facility location and a flexible and easily accessible database. This presentation addresses system technical design, issues encountered, and the status of Stennis' development and deployment

    Integrated System Test Approaches for the NASA Ares I Crew Launch Vehicle

    Get PDF
    The Ares I Crew Launch Vehicle (CLV) is being developed by the U.S. National Aeronautics and Space Administration (NASA) to provide crew access to the International Space Station (ISS) and, together with the Ares V Cargo Launch Vehicle (CaLV), serves as one component of a future launch capability for human exploration of the Moon. During the system requirements definition process and early design cycles, NASA defined and began implementing plans for integrated ground and flight testing necessary to achieve the first human launch of Ares I. The individual Ares I flight hardware elements: the first stage five segment booster (FSB), upper stage, and J-2X upper stage engine, will undergo extensive development, qualification, and certification testing prior to flight. Key integrated system tests include the Main Propulsion Test Article (MPTA), acceptance tests of the integrated upper stage and upper stage engine assembly, a full-scale integrated vehicle dynamic test (IVDT), aerodynamic testing to characterize vehicle performance, and integrated testing of the avionics and software components. The Ares I-X development flight test will provide flight data to validate engineering models for aerodynamic performance, stage separation, structural dynamic performance, and control system functionality. The Ares I-Y flight test will validate ascent performance of the first stage, stage separation functionality, and a highaltitude actuation of the launch abort system (LAS) following separation. The Orion-1 flight test will be conducted as a full, un-crewed, operational flight test through the entire ascent flight profile prior to the first crewed launch

    NASA Data Acquisitions System (NDAS) Software Architecture

    Get PDF
    The NDAS Software Project is for the development of common low speed data acquisition system software to support NASA's rocket propulsion testing facilities at John C. Stennis Space Center (SSC), White Sands Test Facility (WSTF), Plum Brook Station (PBS), and Marshall Space Flight Center (MSFC)
    corecore