10 research outputs found

    Evaluation of control modalities and functional impact of a self-piloted grasp neuroprosthesis in stroke patients: preliminary results from a multi-crossover N-of-1 randomized controlled study

    Get PDF
    The "14th Vienna International Workshop on Functional Electrical Stimulation" will be held as an integral part of the BMT2022.International audienc

    Evaluation d'une orthèse de cheville hélicoïdale par AQM

    No full text
    17ème congrès de la SOFAMEA, TOULOUSE, FRANCE, 24-/01/2018 - 26/01/2018Une orthèse peut être indiquée pour améliorer la marche des patients présentant un défaut de flexion dorsale de cheville en phase oscillante secondaire à une parésie des releveurs de pied. L'objectif de l'étude a été d'évaluer un nouveau modèle hélicoïdal d'orthèse de cheville comparativement à une orthèse en plastique thermoformée et à une condition contrôle sans orthèse

    Comparison between a novel helical and a posterior ankle–foot orthosis on gait in people with unilateral foot drop: a randomised crossover trial

    No full text
    Abstract Background Neuromuscular disease and peripheral neuropathy may cause drop foot with or without evertor weakness. We developed a helical-shaped, non-articulated ankle–foot orthosis (AFO) to provide medial–lateral stability while allowing mobility, to improve gait capacity. Our aim was to evaluate the effect of the helical AFO (hAFO) on functional gait capacity (6-min walk test) in people with peripheral neuropathy or neuromuscular disease (NMD) causing unilateral drop foot and compare with a posterior leaf spring AFO (plsAFO). Secondary aims were to compare functional mobility, 3D kinematic and kinetic gait variables and satisfaction between the AFOs. Methods Single centre, randomised crossover trial from January to July 2017 in 20 individuals (14 with peripheral neuropathy and 6 with NMD, 12 females, mean age 55.6 years, SD 15.3); 10 wore the hAFO for the first week and 10 wore the plsAFO before switching for the second week. The 6-min walk test (6MWT), Timed Up and Go (TUG) test and 3D gait analysis were evaluated with the hAFO, the plsAFO and shoes only (noAFO) at inclusion and 1 week after wearing each orthosis. Satisfaction was evaluated with the Quebec user evaluation of satisfaction with assistive technology (QUEST). Results Median [interquartile range] 6MWT distance was greater with the hAFO (444 m [79]) than the plsAFO (389 m [135], P < 0.001, Hedge’s g = 0.6) and noAFO (337 m [91], P < 0.001, g = 0.88). TUG time was shorter with the hAFO (8.1 s [2.8]) than the plsAFO (9.5 s [2.6], P < 0.001, g = − 0.5) and noAFO (10.0 s [2.6]), P < 0.001, g = − 0.6). The plsAFO limited plantarflexion during the loading response (plsAFO − 7.5 deg [6.0] vs. noAFO -13.0 deg [10.0], P = 0.0007, g = − 1.0) but the hAFO did not (− 11.0 deg [5.1] vs. noAFO, P = 0.05, g = − 0.5). Quasi-stiffness was lower for the hAFO than plsAFO (P = 0.009, g = − 0.7). The dimensionless eversion moment was higher (though not significantly) with the hAFO than noAFO. Neither orthosis reduced ankle power (P = 0.34). Median total QUEST score was higher for the hAFO (4.7 [0.7]) than the plsAFO (3.6 [0.8]) (P < 0.001, g = 1.9). Conclusions The helical orthosis significantly and considerably improved functional gait performance, did not limit ankle mobility, increased lateral stability, though not significantly, and was associated with greater patient satisfaction than the posterior leaf spring orthosis. Trial registration The trial began before registration was mandator

    The LHCb upgrade I

    No full text
    International audienceThe LHCb upgrade represents a major change of the experiment. The detectors have been almost completely renewed to allow running at an instantaneous luminosity five times larger than that of the previous running periods. Readout of all detectors into an all-software trigger is central to the new design, facilitating the reconstruction of events at the maximum LHC interaction rate, and their selection in real time. The experiment's tracking system has been completely upgraded with a new pixel vertex detector, a silicon tracker upstream of the dipole magnet and three scintillating fibre tracking stations downstream of the magnet. The whole photon detection system of the RICH detectors has been renewed and the readout electronics of the calorimeter and muon systems have been fully overhauled. The first stage of the all-software trigger is implemented on a GPU farm. The output of the trigger provides a combination of totally reconstructed physics objects, such as tracks and vertices, ready for final analysis, and of entire events which need further offline reprocessing. This scheme required a complete revision of the computing model and rewriting of the experiment's software

    The LHCb upgrade I

    No full text
    International audienceThe LHCb upgrade represents a major change of the experiment. The detectors have been almost completely renewed to allow running at an instantaneous luminosity five times larger than that of the previous running periods. Readout of all detectors into an all-software trigger is central to the new design, facilitating the reconstruction of events at the maximum LHC interaction rate, and their selection in real time. The experiment's tracking system has been completely upgraded with a new pixel vertex detector, a silicon tracker upstream of the dipole magnet and three scintillating fibre tracking stations downstream of the magnet. The whole photon detection system of the RICH detectors has been renewed and the readout electronics of the calorimeter and muon systems have been fully overhauled. The first stage of the all-software trigger is implemented on a GPU farm. The output of the trigger provides a combination of totally reconstructed physics objects, such as tracks and vertices, ready for final analysis, and of entire events which need further offline reprocessing. This scheme required a complete revision of the computing model and rewriting of the experiment's software

    The LHCb upgrade I

    No full text
    International audienceThe LHCb upgrade represents a major change of the experiment. The detectors have been almost completely renewed to allow running at an instantaneous luminosity five times larger than that of the previous running periods. Readout of all detectors into an all-software trigger is central to the new design, facilitating the reconstruction of events at the maximum LHC interaction rate, and their selection in real time. The experiment's tracking system has been completely upgraded with a new pixel vertex detector, a silicon tracker upstream of the dipole magnet and three scintillating fibre tracking stations downstream of the magnet. The whole photon detection system of the RICH detectors has been renewed and the readout electronics of the calorimeter and muon systems have been fully overhauled. The first stage of the all-software trigger is implemented on a GPU farm. The output of the trigger provides a combination of totally reconstructed physics objects, such as tracks and vertices, ready for final analysis, and of entire events which need further offline reprocessing. This scheme required a complete revision of the computing model and rewriting of the experiment's software

    The LHCb upgrade I

    No full text
    The LHCb upgrade represents a major change of the experiment. The detectors have been almost completely renewed to allow running at an instantaneous luminosity five times larger than that of the previous running periods. Readout of all detectors into an all-software trigger is central to the new design, facilitating the reconstruction of events at the maximum LHC interaction rate, and their selection in real time. The experiment's tracking system has been completely upgraded with a new pixel vertex detector, a silicon tracker upstream of the dipole magnet and three scintillating fibre tracking stations downstream of the magnet. The whole photon detection system of the RICH detectors has been renewed and the readout electronics of the calorimeter and muon systems have been fully overhauled. The first stage of the all-software trigger is implemented on a GPU farm. The output of the trigger provides a combination of totally reconstructed physics objects, such as tracks and vertices, ready for final analysis, and of entire events which need further offline reprocessing. This scheme required a complete revision of the computing model and rewriting of the experiment's software

    The LHCb upgrade I

    No full text
    International audienceThe LHCb upgrade represents a major change of the experiment. The detectors have been almost completely renewed to allow running at an instantaneous luminosity five times larger than that of the previous running periods. Readout of all detectors into an all-software trigger is central to the new design, facilitating the reconstruction of events at the maximum LHC interaction rate, and their selection in real time. The experiment's tracking system has been completely upgraded with a new pixel vertex detector, a silicon tracker upstream of the dipole magnet and three scintillating fibre tracking stations downstream of the magnet. The whole photon detection system of the RICH detectors has been renewed and the readout electronics of the calorimeter and muon systems have been fully overhauled. The first stage of the all-software trigger is implemented on a GPU farm. The output of the trigger provides a combination of totally reconstructed physics objects, such as tracks and vertices, ready for final analysis, and of entire events which need further offline reprocessing. This scheme required a complete revision of the computing model and rewriting of the experiment's software

    The LHCb upgrade I

    No full text
    International audienceThe LHCb upgrade represents a major change of the experiment. The detectors have been almost completely renewed to allow running at an instantaneous luminosity five times larger than that of the previous running periods. Readout of all detectors into an all-software trigger is central to the new design, facilitating the reconstruction of events at the maximum LHC interaction rate, and their selection in real time. The experiment's tracking system has been completely upgraded with a new pixel vertex detector, a silicon tracker upstream of the dipole magnet and three scintillating fibre tracking stations downstream of the magnet. The whole photon detection system of the RICH detectors has been renewed and the readout electronics of the calorimeter and muon systems have been fully overhauled. The first stage of the all-software trigger is implemented on a GPU farm. The output of the trigger provides a combination of totally reconstructed physics objects, such as tracks and vertices, ready for final analysis, and of entire events which need further offline reprocessing. This scheme required a complete revision of the computing model and rewriting of the experiment's software
    corecore