419 research outputs found
LHC Machine Protection
For nominal beam parameters at 7 TeV/c each of the two LHC proton beams has a stored energy of 362 MJ threatening to damage accelerator equipment in case of uncontrolled beam loss. The energy stored in the magnet system at 7 TeV/c will exceed 10 GJ. In order to avoid damage of accelerator equipment, complex machine protection systems are required. Magnet protection and powering interlock systems must be operational already before commissioning the magnet powering system. Beam operation, throughout the operational cycle from injection to colliding beams, requires fully operational protection systems, including beam interlock systems, beam dumping system, beam instrumentation (mainly beam loss monitors) as well as collimators and beam absorbers. Details of LHC machine protection have been presented on several occasions and the systems involved in protection are well documented [1]. This paper gives an overview of LHC machine protection, discusses the progress with the implementation and presents first results from the commissioning of some systems
Local snowmelt and temperature â but not regional seaâice â explain variation in spring phenology in coastal Arctic tundra
Requirements for the LHC collimation system
The LHC requires efficient collimation during all phases of the beam cycle. Collimation plays important roles in prevention of magnet quenches from regular beam diffusion, detection of abnormal beam loss and subsequent beam abort, radiation protection, and passive protection of the superconducting magnets in case of failures. The different roles of collimation and the high beam power in the LHC impose many challenges for the design of the collimation system. In particular, the collimators must be able to withstand the expected particle losses. The requirements for the LHC collimation system are presented
The energy calibration of LEP in the 1993 scan
This report summarizes the procedure for providing the absolute energy calibration of the LEP beams during the energy scan in 1993. The average beam energy around the LEP ring was measured in 25 calibrations with the resonant depolarization technique. The time variation of this average beam energy is well described by a model of the accelerator based on monitored quantities. The absolute calibration of the centre of mass energies of the off-peak points is determined with a precision of 2 parts in 10(5) resulting in a systematic error on the Z-mass of about 1.4 MeV and on the Z-width of about 1.5 MeV
The LHC Injection Tests
A series of LHC injection tests was performed in August and September 2008. The first saw beam injected into sector 23; the second into sectors 78 and 23; the third into sectors 78-67 and sectors 23-34-45. The fourth, into sectors 23-34-45, was performed the evening before the extended injection test on the 10th September which saw both beams brought around the full circumference of the LHC. The tests enabled the testing and debugging of a number of critical control and hardware systems; testing and validation of instrumentation with beam for the first time; deployment, and validation of a number of measurement procedures. Beam based measurements revealed a number of machine configuration issues that were rapidly resolved. The tests were undoubtedly an essential precursor to the successful start of LHC beam commissioning. This paper provides an outline of preparation for the tests, the machine configuration and summarizes the measurements made and individual system performance
Search for CP Violation in the Decay Z -> b (b bar) g
About three million hadronic decays of the Z collected by ALEPH in the years
1991-1994 are used to search for anomalous CP violation beyond the Standard
Model in the decay Z -> b \bar{b} g. The study is performed by analyzing
angular correlations between the two quarks and the gluon in three-jet events
and by measuring the differential two-jet rate. No signal of CP violation is
found. For the combinations of anomalous CP violating couplings, and , limits of \hat{h}_b < 0.59h^{\ast}_{b} < 3.02$ are given at 95\% CL.Comment: 8 pages, 1 postscript figure, uses here.sty, epsfig.st
Update on Beam Induced RF Heating in the LHC
Since June 2011 the rapid increase of the luminosity performance of the LHC has come at the expense of both increased temperature and pressure of specific, near-beam, LHC equipment. In some cases, this beam induced heating has caused delays while equipment cool-down, beam dumps and even degradation of some devices. This contribution gathers the observations of beam induced heating, attributed to longitudinal beam coupling impedance, their current level of understanding and possible actions planned to be implemented during the 1st LHC Long Shutdown (LS1) in 2013-2014
AWAKE, the advanced proton driven plasma wakefield acceleration experiment at CERN
The Advanced Proton Driven Plasma Wakefield Acceleration Experiment (AWAKE) aims at studying plasma wakefield generation and electron acceleration driven by proton bunches. It is a proof-of-principle R&D experiment at CERN and the worldŚłs first proton driven plasma wakefield acceleration experiment. The AWAKE experiment will be installed in the former CNGS facility and uses the 400 GeV/c proton beam bunches from the SPS. The first experiments will focus on the self-modulation instability of the long (rms ~12 cm) proton bunch in the plasma. These experiments are planned for the end of 2016. Later, in 2017/2018, low energy (~15 MeV) electrons will be externally injected into the sample wakefields and be accelerated beyond 1 GeV. The main goals of the experiment will be summarized. A summary of the AWAKE design and construction status will be presented
- âŠ