16 research outputs found

    Use of fluorescence imaging and indocyanine green during colorectal surgery: Results of an intercontinental Delphi survey

    Get PDF
    BACKGROUND: Fluorescence imaging with indocyanine green is increasingly being used in colorectal surgery to assess anastomotic perfusion, and to detect sentinel lymph nodes. METHODS: In this 2-round, online, Delphi survey, 35 international experts were asked to vote on 69 statements pertaining to patient preparation and contraindications to fluorescence imaging during colorectal surgery, indications, technical aspects, potential advantages/disadvantages, and effectiveness versus limitations, and training and research. Methodological steps were adopted during survey design to minimize risk of bias. RESULTS: More than 70% consensus was reached on 60 of 69 statements, including moderate-strong consensus regarding fluorescence imaging's value assessing anastomotic perfusion and leak risk, but not on its value mapping sentinel nodes. Similarly, although consensus was reached regarding most technical aspects of its use assessing anastomoses, little consensus was achieved for lymph-node assessments. Evaluating anastomoses, experts agreed that the optimum total indocyanine green dose and timing are 5 to 10 mg and 30 to 60 seconds pre-evaluation, indocyanine green should be dosed milligram/kilogram, lines should be flushed with saline, and indocyanine green can be readministered if bright perfusion is not achieved, although how long surgeons should wait remains unknown. The only consensus achieved for lymph-node assessments was that 2 to 4 injection points are needed. Ninety-six percent and 100% consensus were reached that fluorescence imaging will increase in practice and research over the next decade, respectively. CONCLUSION: Although further research remains necessary, fluorescence imaging appears to have value assessing anastomotic perfusion, but its value for lymph-node mapping remains questionable

    Manufacturing flow line systems: a review of models and analytical results

    Get PDF
    The most important models and results of the manufacturing flow line literature are described. These include the major classes of models (asynchronous, synchronous, and continuous); the major features (blocking, processing times, failures and repairs); the major properties (conservation of flow, flow rate-idle time, reversibility, and others); and the relationships among different models. Exact and approximate methods for obtaining quantitative measures of performance are also reviewed. The exact methods are appropriate for small systems. The approximate methods, which are the only means available for large systems, are generally based on decomposition, and make use of the exact methods for small systems. Extensions are briefly discussed. Directions for future research are suggested.National Science Foundation (U.S.) (Grant DDM-8914277

    Critical Home Video

    No full text
    This catalogue for an exhibition of British video art is comprised of 15 leaves contained in a box resembling a case for a video tape. The 12 videos in the exhibition are each represented by a card featuring one video still and a brief descriptive text. Mabb's curatorial introduction outlines the origins of this exhibition of low-budget video art from London

    An Investigation of Production Workers’ Performance Variations and the Potential Impact of Attitudes

    Get PDF
    In most manufacturing systems the contribution of human labour remains a vital element that affects overall performance and output. Workers’ individual performance is known to be a product of personal attitudes towards work. However, in current system design processes, worker performance variability is assumed to be largely insignificant and the potential impact of worker attitudes is ignored. This paper describes a field study that investigated the extent to which workers’ production task cycle times vary and the degree to which such variations are associated with attitude differences. Results show that worker performance varies significantly, much more than is assumed by contemporary manufacturing system designers and that this appears to be due to production task characteristics. The findings of this research and their implications are discussed
    corecore