9 research outputs found

    A Novel Project Risk Assessment Method Development via AHP-TOPSIS Hybrid Algorithm

    Get PDF
    In project planning, risk assessment method plays vital role. Poorly assessed project risks cause degeneration at project cost, project completion time, and project output quality and project scope. Each project activity risk influence these project success factors. Implementation performance of a project activity triggers or smooth of its successor’s activity risks. Because of this; employing robust and detailed risk assessment methods is important to reach those project goals. In project risk assessment literature, when it is investigated, it is noticed that risk assessment and evaluation methods are only developed at whole project level. Actually, they are not comprehensive enough to evaluate the project risks at activity level. Besides that traditional risk assessment methods such as risk matrix does not able analyze project risk quantitatively. With this motivation, main aim of this study is developing a multi-criteria based decision method which prioritizing project risks at activity level. AHP and TOPSIS method are combined to developed novel method. In this hybrid method, Constructing AHP model is to prioritize work packages with respect to relative importance of project time, project output quality and project cost. Broken down structure of these work packages are used as input for weighted criteria for TOPSIS method. In second layer of this decision method, TOPSIS model is used for prioritizing predetermined activity risks according weighted project work packages success criteria. In the application of this method, a case study approach is followed. In this sense, “Global Furniture Ltd.” which is established in Istanbul, Turkey is chosen as a case to apply newly developed model. Results showed that application of AHP-Stochastic TOPSIS Hybrid Algorithm provides a platform that project risks could be analyzed as quantitative and also at project activity level

    Developing Strategy Evaluation Method Via Strategic Control System Based Risk Assessment

    Get PDF
    In strategic planning process, strategy alternatives have to be evaluated properly to select best one to achieve strategic goals. During the evaluation process strategy alternatives are compared and measured according to their probable performance on their related strategic target. Risk, cost, feasibility, effect on performance target and implementation time are the main parameters which reflect performance of strategy. In this study, risk aspect is analyzed with a consecutive approach while evaluating a particular strategy in terms of the effect on performance targets. After this analysis, strategic control model based strategy evaluation technique is developed to assess the risk level of particular strategy and it is illustrated by an application

    Portföy çeşitlendirme problemine tamsayılı programlama yaklaşımı

    No full text
    Portföy çeşitlendirme problemleri borsada yatırım yapmak isteyen kişilerin ve de portföy yöneticilerinin önemsediği konulardandır. Portföy çeşitlendirmesi yaparken uzmanlar sayısal yöntemler kullanmaktan çok tecrübelerini ve çevrelerinden aldıkları haberleri kullanırlar. Bu tez çalışmasında portföy yönetiminin beş temel aşamasından iki aşaması olan yatırım analizi ve portföy seçimine bilimsel yaklaşımlarda bulunulmuş örnek model çözülerek bazı sonuçlara ulaşılmıştır. Yatırım analizi kısmında bir hisse senedi performans tahmin yöntemi olan teknik analiz yöntemi kullanılmış ve optimum portföy seşimi yapabilmek içinde tamsalılı programlama yöntemi kullanılmıştır. Optimum portföy seçimi 56 hisse senedi arasından yapılmıştır. Tez çalışmasını bölümlerin öncelik sırasına göre incelersek aşağıdaki gibi değerlendirebiliriz. Literatür araştırmasının ilk kısmında optimizasyon kavramından bahsedilmiş ve yöneylem araştırması konusu genel olarak tanıtılmıştır. Genel olarak matematiksel modeller bahdesildikten sonra tez çalışmasının uygulama kısmında faydalanılan tamsayılı programlama konusu incelenmiştir. Literatür aşamasının ikinci aşamasında portföy yönetimi ve risk analizi teknik analiz ve temel analiz konularında bahsedilmiştir. Tez çalışmasının uygulama aşamalarını aşağıdaki gibi açıklayabiliriz. · Portföy oluşturmada kullanılacak hisse senetlerinin seçilmesi ilk aşamayı oluşturmaktadır. Olşturulacak olan portföyde kullanılabilecek 56 tane hisse senedi vardır. Bunların 16 tanesi İMKB 30'dan 8 tanesi İMKB 50'den 11 tanesi İMKB 100'den 21 tanesi ise sıradan hisse senetleri arasından seçilmiştir. · İkinci aşamada, seçilmiş olan hisse senetlerine teknik analiz yorumu yapılmıştır. Bu yorumdan hangi hisse senedinin bir sonraki dönemde artıp artmayacağını veya artan hisse senedinin nekadar artacağı anlaşılmıştır. · Üçüncü aşamada analiz edilmiş hisse senetlerine endeks bazında güvenilirlik katsayıları yüzde değer olarak verilmiştir. Bu yüzdelik katsayıların atanmasının bir sebebi sadece getiri bazında değil güvenilirlik bazında da optimizasyon yapabilmektir. Başka bir sebebi ise tamsayılı programlama algoritmasının portföy oluşturmada kullanılbilecek hisse senetlerinin en karlı olanından sonsuz sayıda seçememesini sağlamaktır. Çünkü bu durumda portföy çeşitlendirilmesi yapılamaz. Güvenilirlik katsayıları seçilen 56 hisse senedinin portföyde maksimum kaç tane kullanılabileceğini belirlemek amacıyla verilir. Bu sayılar yüzdelik değerler olarak ve varsayımlara dayanarak verilir. Endeks Bazında Güvenilirlik Katsayıları: (İMKB30= %85, İMKB50=%70, İMKB100=%55, Diğer hisse senetleri=%40) · Dördüncü aşama tamsayılı programlama modelinin kurulmasıdır. Modeldeki kısıt fonksiyonlarını aşağıdaki gibi sıralayabiliriz. 1. Toplam bütçe 2000000000TL. dir. 2. Gıda sektörüne yapılacak olan yatırım 500000000TL yi geçmemelidir. 3. Sıradan hisse senetlerine yapılacak olan yatırım 800000000TL yi geçmemelidir. 4. Her bir hisse senedi için harcanabilecek para bütçenin %4'ünü geçmemelidir. Son bölümde is sonuçlar değerlendirilerek yorumlar yapılmıştır. Portfolio variation problem is a very import subject for portfolio managers and investors. Generally, Portfolio experts do not use numerical methods. They often use their experiences and some stock-market news. In this study, we focused on two phase of investment analysis (these are investment analysis and portfolio variation) and we developed some scientific approaches to them. Then we generated a model by using stock and solved it. We used technical analysis method in investment analysis phase. Optimal portfolio selection is made between 56 stocks. Below, priority order of thesis study is represented. In first part of literature survey, Optimization concept is described and made an introduction to operations research. General mathematical models and integer programming are method introduced. In second part of literature survey, Portfolio management, risk analysis, stock performace analysis methods are described. Application part of of this thesis study can be described as below. · Stocks which are used for portfolio variation was selected in firs part. There are 56 stocks. 16 of them are İMKB 30, 8 of them are İMKB 50, 11 of them are İMKB 100 and 21 of them are ordinary stocks. · In second part, Technical analysis method is performed to these stocks for forecasting their values in next period. · In third part, Index based confidence coefficients were assigned to these analyzed stocks. Main reason is to make optimization related to profit and confidence of stocks simultaneously. Another reason is not allow integer programming algorithm to select infinite number of stocks which is most profitable. Because, in that case portfolio selection can not be made. These confidence coefficients are percent values. Index Based Confidence Coefficients: (İMKB30= %85, İMKB50=%70, İMKB100=%55, Diğer hisse senetleri=%40) · Fourth part is consist of building the mathematical model of the problem. We can order constraints of model as below. 1. Total budget is 2000000000TL 2. Investment to food sector have to be less than or equal to 500000000TL 3. Investment to ordinary stock have to be less than or equal to 800000000TL 4. Capital amount which is allowed to spent each stocks must not be greater than %4 of budget. Last part of thesis study is consist of evaluation of results of solved mathematical model

    Decision support method development via anp combined vıkor algorithm for strategy ranking of government agencies strategic planning template

    No full text
    ANP-VIKOR Yöntemleri Kullanılarak Kamu Kurumlarının Stratejik Planlama Klavuzu için Strateji Önceliklendirme Yöntemi Geliştirilmesi Stratejik planlama stratejik yönetim sürecinin başarısını belirleyen ilk basamağıdır. Stratejik plan uzun dönemli bir planlama olduğu ve kurumun bütün bölümlerini ilgilendirdiği için çok fazlam miktarda bilginin analiz edilmesini gerektirir. Aynı zamanda planın başarılı olması için önceden belirlenmiş strateji alternatiflerinden en etkin olanlarının seçilmesi gerekir. Büyük ölçekli bir kurumda bu görev stratejik planlama takımına verilmektedir. Stratejik planlama takımını bu süreçte bilgilerin analiz edilmesi ve strateji alternatiflerinin önceliklendirilmesi ve en uygun stratejilerin seçimi işini çalıştaylar düzenleyerek ve beyin fırtınası benzeri grup karar verme yöntemleri ile yapmaktadır. Ancak günümüzde, analiz edilmesi gereken bilgilerin fazlalığı ve strateji alternatiflerinin sayısı bu sürecin klasik çalıştay yöntemleri ile yapılmasını çok güç kılmaktadır. Bu tez çalışmasında stratejik planlama sürecinde strateji seçimi için çok kriterli karar verme yöntemleri tabanlı bir grup karar destek sisteminin matematiksel yöntemi tasarlanmıştır. Tezin giriş kısmında stratejik planlama ile ilgili temel bilgiler verilmiştir. Tezin literatür taraması kısmında çok kriterli karar verme yöntemlerini kullanarak SWOT analizine göre Strateji seçimi veya önceliklendirmesi yapan bilimsel çalışmalar incelenmiştir. Bu çalışmaların irdelenmesi tezde geliştirilen yönteme temel oluşturmuştur. İkinci kısımda strateji önceliklendirme yönteminin uygulanacağı bir stratejik planlama modeli seçilmiş ve ana hatlarıyla anlatılmıştır. Bu planlama modeli Devlet Planlama Teşkilatı tarafından 2006 yılında revize edilen “Kamu İdareleri için Stratejik Planlama Kılavuzu “ olarak belirlenmiştir. Bu strateji planlama kılavuzunun kullanım yaygınlığı (5018 no’lu yasaya göre Türkiye’deki bütün kamu kurumlarının stratejik plan yapma mecburiyeti vardır.) ve bir stratejik planda olması gereken bütün parametreleri içermesi tezde tasarlanan yöntemin uygulamaya ve bilime sağlayacağı katkıyı artırmaktadır. Tezin ikinci kısmının diğer yarısında strateji önceliklendirme yönteminde kullanılmasına karar verilen ANP ve VIKOR algoritmaları anlatılmıştır. Tezin ikinci kısmının sonunda ise ANP-VIKOR hibrit strateji önceliklendirme yöntemi olarak adlandırılan yöntem uygulama basamakları şeklinde anlatılmıştır. Tezin dördüncü kısmında ANP-VIKOR hibrit strateji önceliklendirme yönteminin MTA’nın 2015-2019 stratejik planının stratejilerini önceliklendirmek amacıyla kullanımı uygulama çalışması olarak anlatılmıştır. (Uygulama çalışmasında MTA stratejik planının vizyonu SWOT analizi, stratejik amaçları, stratejik hedefleri ve performans hedefleri orijinal olarak alınmış olup önceliklendirilen stratejiler sayılarının yetersizliğinden dolayı maden mühendisliği ve jeoloji mühendisliği akademisyenleri tarafından tez çalışması için revize edilerek yeniden belirlenmiştir.) Tezin dördüncü ve beşinci kısımlarında sonuçların değerlendirilmesi, tezinde tasarlanan yöntemin getirdiği yenilikler ve konu ile ilgili gelecekte yapılabilecek muhtemel çalışmalar belirtilmiştir. ABSTRACT Decision Support Method Development via ANP Combined VIKOR Algorithm for Strategy Ranking of Government Agencies Strategic Planning Template Strategic planning is the first step that determines the success of strategic management process. It is necessary to analyze large volume of information as strategic planning represents a long-term planning and concerns all departments of a corporation. Also, the most efficient ones amongst the previously identified strategy alternatives should be chosen so that the plan can be successful. In a large-scale corporation, this duty is assigned to the strategic planning team. During this phase, the strategic planning team organizes workshops for analyzing information, prioritizing strategic alternatives and choosing the right strategies, which are held according to group decision-making methods similar to brain-storming. Today however, the excessiveness of the information that requires analysis and the number of strategy alternatives render it very difficult to conduct this process through classic workshop methods. This study has designed a mathematical method of a group decision support system, which is based on multiple-criteria decision-making methods during the strategic planning phase with the aim of choosing a strategy. The introduction section of the thesis has provided basic information concerning strategy planning. The literature scanning section of the thesis has used multiple-criteria decision-making methods; and according to the SWOT Analysis, examination was made into the scientific studies that performed Strategy Selection or Prioritization The digging into these studies has represented the basis for the method developed in the thesis. The second section switched to a strategic planning model where the strategy prioritization method will be applied and it was explained with main its outlines. This planning model was identified as the "Strategic Planning Guide for Public Administrations", which was revised in 2006 by the State Planning Organization. The prevalence of this strategic planning guide (all public institutions in Turkey are under the obligation to make strategic planning as per the Law numbered: 5018) and its inclusion of all parameters that are required in a strategic plan increases the contribution by the methods designed by the thesis to implementation and science. The other part of the thesis' second section has explained the ANP and VIKOR algorithms, which are decided for use in the strategy prioritization method. At the end of the thesis' second part, the method, which is called as the ANP-VIKOR hybrid strategy prioritization method, was explained in implementation steps. In the fourth section of the thesis, the use of the ANP-VIKOR hybrid strategy prioritization method for the purpose of prioritizing the strategies of MTA's 2015-2019 strategic plan was explained as an implementation study. (During the implementation study, the vision of the MTA strategic plan, the SWOT analysis, its strategic purposes, strategic targets and performance targets were taken as original and the prioritized strategies were revised and re-established by mine engineering and geology engineering academicians due to the insufficiency of numbers). On the other hand, the fourth and fifth sections of the thesis touched upon the assessment of results, the innovations introduced by the method designed in the thesis and the potential future studies that can be conducted on the subject

    Generating data base about activity times of contruction project

    No full text
    İnşaat mühendisliği projelerinin planlanmasında yaşanan en büyük sorunlardan birisi zaman parametresine göre yapılan çizelgelemenin verimsizliğidir. Bu tez çalışmasının amacı bu problemin giderilmesi yolunda bir fikir vermektir. Bu çalışmanın kaynak taraması kısmında; genel proje yönetimi, inşaat projeleri yönetimi, kullanılacak yöneylem araştırması ve istatistik konuları incelenmiş ve ilgili makalelerle desteklenmiştir. Bu tez çalışmasının uygulama kısmı şu adımlardan oluşmuştur: · SOYAK inşaat firmasından bitmiş 22 inşaat projesinin aktivite süreleri alındı ve bu süreleri etkileyen parametreler(temel alanı, döşeme alanı, kat sayısı, daire sayısı günlük çalışma süresi ve işçi sayısı) tespit edildi. · Alınan aktivite süreleri yukarıdaki parametrelere göre standartlaştırıldı ve birim işçiyle tamamlanan zamanları bulundu. · Bulunan bu standart değerler beta dağılımı ve normal dağılımla karşılaştırıldı ve aktivite sürelerinin dağılımları ile ilgili bilgi sahibi olundu. · Örnek bir proje tasarlandı ve aktivite sürelerini etkileyen parametreleri belirlendi. · Standartlaştırılmış birim değerler kullanılarak örnek projenin aktivite süreleri bulundu. · Bu sürelerin dağılımının Beta dağılımına uygun olduğu varsayılarak en kötümser süre en iyimser süre ve olağan süreleri bulunmuştur. · Son bölümde bu süreler kullanılarak kritik yol bulunmuştur. Ocak 2004 Emin Başar BAYLAN ABSTRACT One of the biggest problems of construction project planning is unproductiveness of time scheduling. This study put forward an idea to solve this problem. Literature study of this study includes General Project Management, Construction Project Management, Statistical and Operations Research methods (which are used) and some articles about these subjects. Application of this thesis study consists of these steps: · Activity durations of 22 completed projects were taken from SOYAK Company and their parameters that affect activity durations (base area, flooring area number of floors, daily working time, number of flats and number of workers) are designated. · These activity durations are standardized according to parameters below and unit completion time by a worker are determined. · These designated standard values were compared against beta and normal distributions then we understood something about distribution about standardized activity durations. · A case project was planned with is parameters that affect activity durations as we mentioned before. · Activity durations of case project were determined according to standardized unit time values. · Distributions of these activity durations were assumed to fit beta distribution then most likely completion time, optimistic completion time and pessimistic completion times were determined. · Last section of application part involves finding critical path of this case project. Ocak 2004 Emin Başar BAYLA

    Developing Strategy Evaluation Method Via Strategic Control System Based Risk Assessment

    No full text
    In strategic planning process, strategy alternatives have to be evaluated properly to select best one to achieve strategic goals. During the evaluation process strategy alternatives are compared and measured according to their probable performance on their related strategic target. Risk, cost, feasibility, effect on performance target and implementation time are the main parameters which reflect performance of strategy. In this study, risk aspect is analyzed with a consecutive approach while evaluating a particular strategy in terms of the effect on performance targets. After this analysis, strategic control model based strategy evaluation technique is developed to assess the risk level of particular strategy and it is illustrated by an application

    Generating data base about activity times of contruction project

    No full text
    İnşaat mühendisliği projelerinin planlanmasında yaşanan en büyük sorunlardan birisi zaman parametresine göre yapılan çizelgelemenin verimsizliğidir. Bu tez çalışmasının amacı bu problemin giderilmesi yolunda bir fikir vermektir. Bu çalışmanın kaynak taraması kısmında; genel proje yönetimi, inşaat projeleri yönetimi, kullanılacak yöneylem araştırması ve istatistik konuları incelenmiş ve ilgili makalelerle desteklenmiştir. Bu tez çalışmasının uygulama kısmı şu adımlardan oluşmuştur:·SOYAK inşaat firmasından bitmiş 22 inşaat projesinin aktivite süreleri alındı ve bu süreleri etkileyen parametreler(temel alanı, döşeme alanı, kat sayısı, daire sayısı günlük çalışma süresi ve işçi sayısı) tespit edildi. ·Alınan aktivite süreleri yukarıdaki parametrelere göre standartlaştırıldı ve birim işçiyle tamamlanan zamanları bulundu.·Bulunan bu standart değerler beta dağılımı ve normal dağılımla karşılaştırıldı ve aktivite sürelerinin dağılımları ile ilgili bilgi sahibi olundu.·Örnek bir proje tasarlandı ve aktivite sürelerini etkileyen parametreleri belirlendi.·Standartlaştırılmış birim değerler kullanılarak örnek projenin aktivite süreleri bulundu.·Bu sürelerin dağılımının Beta dağılımına uygun olduğu varsayılarak en kötümser süre en iyimser süre ve olağan süreleri bulunmuştur. ·Son bölümde bu süreler kullanılarak kritik yol bulunmuştur. Ocak 2004 Emin Başar BAYLANABSTRACT One of the biggest problems of construction project planning is unproductiveness of time scheduling. This study put forward an idea to solve this problem. Literature study of this study includes General Project Management, Construction Project Management, Statistical and Operations Research methods (which are used) and some articles about these subjects. Application of this thesis study consists of these steps:·Activity durations of 22 completed projects were taken from SOYAK Company and their parameters that affect activity durations (base area, flooring area number of floors, daily working time, number of flats and number of workers) are designated.·These activity durations are standardized according to parameters below and unit completion time by a worker are determined. ·These designated standard values were compared against beta and normal distributions then we understood something about distribution about standardized activity durations.·A case project was planned with is parameters that affect activity durations as we mentioned before.·Activity durations of case project were determined according to standardized unit time values.· Distributions of these activity durations were assumed to fit beta distribution then most likely completion time, optimistic completion time and pessimistic completion times were determined.·Last section of application part involves finding critical path of this case project. Ocak 2004 Emin Başar BAYLA

    Selecting the Best Pipeline of Yemen Oil Fields & Transportation via AHP

    Get PDF
    Analytic Hierarchy Process (AHP) is a decision-making algorithm developed by Dr. Saaty. It has many applications as documented in Decision Support System literature. The importance of decisions in the oil pipeline industry is reflected in the magnitude and nature of the industry. Worldwide, pipelines transport natural gas, crude oil, and finished oil products over long distances within countries and across borders to meet energy needs. Within this proposal for decision to select the best option between multi-band variable options to arrange pipeline for transportation oil safely with lowest cost from selected point in Shabwah production oil fields S1, S2 by using AHP.in connection with current oil export terminals and pipelines available routs in Yemen, Pipeline to Rass Issa Port via safer Company-Option(1). Shabwah -Safer Mareb, Pipeline Port of Al Shahr (Al Daba) via Petro masila company Option (2). Shabwah -Masila -Hadramout, Pipeline to port (Bir Ali) via MOPS block 4 YCOM company Option (3),Shabwah selected point to MOPS, Pipeline to Aden Port Via Aden Refinery Option (4),Shabwah -Aden refinery. In this study we trying to select the best way to build a new pipeline for the Shabwah region for transportation of oil  from Shabwah production  fields to exports safely with lowest cost   by using  AHP method for comparison and pairwise selection between options and studying the criteria of comparison  which was listed with the following : Criteria of Pairwise Comparison-according to ,(1).Length and distance, (2).Land nature and uses,(3). Risk assessment,(4).Cost of construction,(5).Maintenance operation,(6).Geopolitical parameter