    Status of the RFQ linac installation and conditioning of the Linear IFMIF Prototype Accelerator

    Get PDF
    Abstract The Radio Frequency Quadrupole (RFQ) linac and 1.6 MW RF power system of the Linear IFMIF Prototype Accelerator (LIPAc) facility in the International Fusion Energy Research Center (IFERC) in Rokkasho (Japan) has been installed and conditioned. During the assembly and tuning process, the RFQ cavity was protected with a temporary tent from the potential deterioration of performance caused by dust. The vacuum in the cavity was improved through the 100 °C baking process of the cavity. The high power test of the 175 MHz RF systems up to 200 kW in CW for each of the eight RF chains was performed for checking its stable output reproducibility in Japan, before connecting 9–3/16 inch coaxial transmission lines from the RF chains to the RF input couplers of the cavity. It was confirmed that the eight RF chains provided the balanced RF power to the single RFQ cavity in-phase using a feedback loop and a synchronization system. The peak power in the cavity achieved 150 kW in the pulsed mode, which corresponds approximately to the required electric field to accelerate proton beam. Such RF conditioning process is ongoing to achieve 600 kW approximately required for deuteron beam commissioning planned in 2018

    Commissioning Plan of the IFMIF-DONES Accelerator

    Get PDF
    IFMIF-DONES (International Fusion Materials Irradiation Facility- DEMO-Oriented Neutron Early Source) - a powerful neutron irradiation facility for studies and certification of materials to be used in fusion reactors - is planned as part of the European roadmap to fusion electricity. Its main goal will be to characterize and to qualify materials under irradiation in a neutron field similar to the one faced in a fusion reactor. The intense neutron source is produced by impinging deuterons, from high-power linear deuteron accelerator, on a liquid lithium curtain. The facility has accomplished the preliminary design phase and is currently in its detailed design phase. At the present stage, it is important to have a clear understanding of how the commissioning of the facility will be performed, especially the commissioning of a 5 MW CW deuteron beam, together with the lithium curtain and the beam optimization for the neutron irradiation. In this contribution, the present plans for the hardware and beam commissioning of the accelerator will be given, focusing on the most critical aspects of the tiered approach and on the integration of the procedure with the lithium and tests systems

    The Magnetic Spectrometer Prisma at Lnl

    Get PDF
    The magnetic spectrometer PRISMA [1,2,3] has been recently installed at LNL. It has been designed to be used with heavy-ion beams accelerated at energies up to E = 5-10 AMeV by means of the Tandem-ALPI accelerator complex of the Laboratori Nazionali di Legnaro. The next operation of the new superconductive injector PIAVE and its coupling with the ALPI Linac will allow to extend the nuclear physics studies in the A=100-200 mass region. Moreover, PRISMA i

    Beam Dynamics Simulation and Measurements for the IFMIF/EVEDA Project

    Get PDF
    International audienceIn the framework of IFMIF/EVEDA project the source and RFQ are ready to be tested with beam. In this article the beam dynamics simulation and the measurement performed in preparation of the first beam injection are presented. The installed line is composed by the proton and deuteron Source with the LEBT composed of two solenoids that inject in the 10 meters long RFQ, the MEBT, diagnostic plate and the beam dump. The line is prepared to be tested with protons of 8 mA in pulsed mode (up to 0.1%)

    Beam Dynamics of the First Beams for IFMIF-EVEDA RFQ Commissioning

    No full text
    International audienceThe installation of the IFMIF-EVEDA RFQ, MEBT, LEBT, source and beam dump was completed in September 2017. The beam dynamics of the first beams for the IFMIF-EVEDA RFQ commissioning is presented. Moreover, a proposal for the CW RFQ steady state commissioning is shown, with a focus on the beam dynamics challenges of the beam transport after the RFQ

    ESS Normal Conducting Linac Status and Plans

    No full text
    International audienceThe European Spallation Source (ESS) uses a linear accelerator to deliver the high intensity proton beam to the target station for producing intense beams of neutrons. The average beam power is 5 MW with a peak beam power at the target of 125 MW. The normal conducting linear accelerator (linac) operating at 352.21 MHz accelerates a proton beam of 62.5 mA from 0.075 to 90 MeV. It consists of an ion source, Low Energy Beam Transport (LEBT), Radio Frequency Quadrupole (RFQ), Medium Energy Beam Transport (MEBT), and Drift Tube Linac (DTL). The design, construction and testing of those structures is done by European partner labs as an in-kind contribution to the ESS project. This paper presents the status and plans for the ESS normal conducting linac

    Source and LEBT Beam Preparation for IFMIF-EVEDA RFQ

    No full text
    International audienceThe commissioning phase of the IFMIF-EVEDA RFQ requires a complete beam characterization with simula-tions and measurements of the beam input from the IFMIF-EVEDA ion source and LEBT, in order to reach the RFQ input beam parameters. In this article, the simula-tions results of the complex source-LEBT with the corre-sponding set of measurements and their impact on the commissioning plan will be reported

    Lattice design for 5MeV-125mA CW RFQ operation in the LIPAc

    No full text
    The installation and commissioning of the LIPAc are on- going under the Broader Approach agreement, which is the prototype accelerator of the IFMIF for proof of principle and design. The deuteron beam will be accelerated by the RFQ linac from 100 keV to 5 MeV during the commission- ing phase-B and by the SRF linac up to 9 MeV during the phase-C. The commissioning phase-B+ will be imple- mented between phase-B and C to complete the engineer- ing validation of the RFQ linac before installing the SRF linac. The lattice for the deuteron beam of 5 MeV and 125 mA at the commissioning phase-B+ was designed