91 research outputs found
The Prosepects of Chinese and Japanese Academic Terminology in Modern Time
40020425151近年、日中近代語交渉に関する研究が盛んにされているものの、学術用語の生成についてまだ言及する余地がある。本稿では日中両国における近代訳語の発生及び相互の影響関係という日中語彙交渉の過程の時代区分をもとに、日中語彙交流史の見地から先行研究の問題点及び本研究で扱う範囲、位置づけを明らかにした。departmental bulletin pape
Probing New Physics from Top-charm Associated Productions at Linear Colliders
The top-charm associated productions via , and collisions at linear colliders, which are extremely suppressed in the
Standard Model (SM), could be significantly enhanced in some extensions of the
SM. In this article we calculate the full contribution of the topcolor-assisted
technicolor (TC2) to these productions and then compare the results with the
existing predictions of the SM, the general two-Higgs-doublet model and the
Minimal Supersymmetric Model. We find that the TC2 model predicts much larger
production rates than other models and the largest-rate channel is , which exceeds 10 fb for a large part of the parameter
space. From the analysis of the observability of such productions at the future
linear colliders, we find that the predictions of the TC2 model can reach the
observable level for a large part of the parameter space while the predictions
of other models are hardly accessible.Comment: discussions added (version in Eur. Phys. J. C
【研究資料】日本の伝統芸能を活用して健康寿命の延伸を推進する可能性を探る(その4) : 伝統芸能が継承する知恵に基づくオリジナル体操創作における伴奏音楽の役割について
application/pdfdepartmental bulletin pape
Automated Planning of Concrete Joint Layouts with 4D-BIM
Concrete pouring represents a major critical path activity that is often affected by design limitations, structural considerations and on-site operational constraints. As such, meticulous planning is required to ensure that both the aesthetic and structural integrity of joints between cast in-situ components is achieved. Failure to adequately plan concrete pouring could lead to structural defects, construction rework or structural instability, all having major financial implications. Given the inherent complexity of large-scale construction projects, the ‘manual planning’ of concrete pouring is a challenging task and prone to human errors. Against this backdrop, this study developed 4D Building Information Management (BIM) approach to facilitate automated concrete joint positioning solution (as a proof of concept) for design professionals and contractors. The study first developed structural model in Revit, then extracted spatial information regarding all construction joints and linked them to dynamic Microsoft (MS) Excel and Matlab spreadsheets using integration facilitated by Dynamo software. Midspan points of each beam as well as floor perimeter information were gathered via codes developed in MS Excel macros. Based on the Excel outputs, Matlab programming was used to determine best concreating starting points and directions, and daily allowed concrete volume, considering limitations due to cold joints. These information were then pushed back to Revit via Dynamo in order to develop daily concrete scheduling. The developed automated programme framework offers a cost-effective and accurate methodology to address the limitations and inefficiencies of traditional methods of designing construction joints and planning pours. This framework extends the body of knowledge by introducing innovative solutions to integrate structural design considerations, constructional procedures and operational aspects for mitigating human error, and providing a novel, yet technically sound, basis for further application of BIM in structural engineering
- …