132,989 research outputs found

    Building information modelling project decision support framework

    Get PDF
    Building Information Modelling (BIM) is an information technology [IT] enabled approach to managing design data in the AEC/FM (Architecture, Engineering and Construction/ Facilities Management) industry. BIM enables improved interdisciplinary collaboration across distributed teams, intelligent documentation and information retrieval, greater consistency in building data, better conflict detection and enhanced facilities management. Despite the apparent benefits the adoption of BIM in practice has been slow. Workshops with industry focus groups were conducted to identify the industry needs, concerns and expectations from participants who had implemented BIM or were BIM “ready”. Factors inhibiting BIM adoption include lack of training, low business incentives, perception of lack of rewards, technological concerns, industry fragmentation related to uneven ICT adoption practices, contractual matters and resistance to changing current work practice. Successful BIM usage depends on collective adoption of BIM across the different disciplines and support by the client. The relationship of current work practices to future BIM scenarios was identified as an important strategy as the participants believed that BIM cannot be efficiently used with traditional practices and methods. The key to successful implementation is to explore the extent to which current work practices must change. Currently there is a perception that all work practices and processes must adopt and change for effective usage of BIM. It is acknowledged that new roles and responsibilities are emerging and that different parties will lead BIM on different projects. A contingency based approach to the problem of implementation was taken which relies upon integration of BIM project champion, procurement strategy, team capability analysis, commercial software availability/applicability and phase decision making and event analysis. Organizations need to understand: (a) their own work processes and requirements; (b) the range of BIM applications available in the market and their capabilities (c) the potential benefits of different BIM applications and their roles in different phases of the project lifecycle, and (d) collective supply chain adoption capabilities. A framework is proposed to support organizations selection of BIM usage strategies that meet their project requirements. Case studies are being conducted to develop the framework. The results of the preliminary design management case study is presented for contractor led BIM specific to the design and construct procurement strategy

    Transforming pre-service teacher curriculum: observation through a TPACK lens

    Get PDF
    This paper will discuss an international online collaborative learning experience through the lens of the Technological Pedagogical Content Knowledge (TPACK) framework. The teacher knowledge required to effectively provide transformative learning experiences for 21st century learners in a digital world is complex, situated and changing. The discussion looks beyond the opportunity for knowledge development of content, pedagogy and technology as components of TPACK towards the interaction between those three components. Implications for practice are also discussed. In today’s technology infused classrooms it is within the realms of teacher educators, practising teaching and pre-service teachers explore and address effective practices using technology to enhance learning

    Teaching and learning in virtual worlds: is it worth the effort?

    Get PDF
    Educators have been quick to spot the enormous potential afforded by virtual worlds for situated and authentic learning, practising tasks with potentially serious consequences in the real world and for bringing geographically dispersed faculty and students together in the same space (Gee, 2007; Johnson and Levine, 2008). Though this potential has largely been realised, it generally isn’t without cost in terms of lack of institutional buy-in, steep learning curves for all participants, and lack of a sound theoretical framework to support learning activities (Campbell, 2009; Cheal, 2007; Kluge & Riley, 2008). This symposium will explore the affordances and issues associated with teaching and learning in virtual worlds, all the time considering the question: is it worth the effort

    Learning in Social Networks: Rationale and Ideas for Its Implementation in Higher Education

    Get PDF
    The internet has fast become a prevalent medium for collaboration between people and social networks, in particular, have gained vast popularity and relevance over the past few years. Within this framework, our paper will analyse the role played by social networks in current teaching practices. Specifically, we focus on the principles guiding the design of study activities which use social networks and we relate concrete experiences that show how they contribute to improving teaching and learning within a university environment

    WETICE 2004 Evaluating Collaborative Enterprises (ECE) Workshop - Final report

    Get PDF
    A summary of the fifth Evaluating Collaborative Enterprises (ECE) workshop which ran on June 14th at University of Modena, Italy. The overall theme of the workshop this year was evaluation within the software lifecyle rather than as a separate activity. Each of the five papers touched on this subject and the subsequent winner of Best Paper covered it thoroughly. Concerns about the level of interactivity within the workshop and WETICE itself prompted a format change to ``paired-paper'' sessions with plenty of discussion time. Several outstanding issus were identified during the discussion, including development of ``evaluation components'' alongside software components, the need to convince managers of the business case for evaluation and meta-evaluation of popular techniques with a view to avoiding studies that select inappropriate techniques or rely too heavily on one type of technique

    Naming the Pain in Requirements Engineering: A Design for a Global Family of Surveys and First Results from Germany

    Get PDF
    For many years, we have observed industry struggling in defining a high quality requirements engineering (RE) and researchers trying to understand industrial expectations and problems. Although we are investigating the discipline with a plethora of empirical studies, they still do not allow for empirical generalisations. To lay an empirical and externally valid foundation about the state of the practice in RE, we aim at a series of open and reproducible surveys that allow us to steer future research in a problem-driven manner. We designed a globally distributed family of surveys in joint collaborations with different researchers and completed the first run in Germany. The instrument is based on a theory in the form of a set of hypotheses inferred from our experiences and available studies. We test each hypothesis in our theory and identify further candidates to extend the theory by correlation and Grounded Theory analysis. In this article, we report on the design of the family of surveys, its underlying theory, and the full results obtained from Germany with participants from 58 companies. The results reveal, for example, a tendency to improve RE via internally defined qualitative methods rather than relying on normative approaches like CMMI. We also discovered various RE problems that are statistically significant in practice. For instance, we could corroborate communication flaws or moving targets as problems in practice. Our results are not yet fully representative but already give first insights into current practices and problems in RE, and they allow us to draw lessons learnt for future replications. Our results obtained from this first run in Germany make us confident that the survey design and instrument are well-suited to be replicated and, thereby, to create a generalisable empirical basis of RE in practice

    On Regulatory and Organizational Constraints in Visualization Design and Evaluation

    Full text link
    Problem-based visualization research provides explicit guidance toward identifying and designing for the needs of users, but absent is more concrete guidance toward factors external to a user's needs that also have implications for visualization design and evaluation. This lack of more explicit guidance can leave visualization researchers and practitioners vulnerable to unforeseen constraints beyond the user's needs that can affect the validity of evaluations, or even lead to the premature termination of a project. Here we explore two types of external constraints in depth, regulatory and organizational constraints, and describe how these constraints impact visualization design and evaluation. By borrowing from techniques in software development, project management, and visualization research we recommend strategies for identifying, mitigating, and evaluating these external constraints through a design study methodology. Finally, we present an application of those recommendations in a healthcare case study. We argue that by explicitly incorporating external constraints into visualization design and evaluation, researchers and practitioners can improve the utility and validity of their visualization solution and improve the likelihood of successful collaborations with industries where external constraints are more present.Comment: 9 pages, 2 figures, presented at BELIV workshop associated with IEEE VIS 201
    corecore