Project scheduling under uncertainty using fuzzy modelling and solving techniques
In the real world, projects are subject to numerous uncertainties at different levels of planning. Fuzzy project scheduling is one of the approaches that deal with uncertainties in project scheduling problem. In this paper, we provide a new technique that keeps uncertainty at all steps of the modelling and solving procedure by considering a fuzzy modelling of the workload inspired from the fuzzy/possibilistic approach. Based on this modelling, two project scheduling techniques, Resource Constrained Scheduling and Resource Leveling, are considered and generalized to handle fuzzy parameters. We refer to these problems as the Fuzzy Resource Constrained Project Scheduling Problem (FRCPSP) and the Fuzzy Resource Leveling Problem (FRLP). A Greedy Algorithm and a Genetic Algorithm are provided to solve FRCPSP and FRLP respectively, and are applied to civil helicopter maintenance within the framework of a French industrial project called Helimaintenance
The Project Scheduling Problem with Non-Deterministic Activities Duration: A Literature Review
Purpose: The goal of this article is to provide an extensive literature review of the models and solution procedures proposed by many researchers interested on the Project Scheduling Problem with nondeterministic activities duration. Design/methodology/approach: This paper presents an exhaustive literature review, identifying the existing models where the activities duration were taken as uncertain or random parameters. In order to get published articles since 1996, was employed the Scopus database. The articles were selected on the basis of reviews of abstracts, methodologies, and conclusions. The results were classified according to following characteristics: year of publication, mathematical representation of the activities duration, solution techniques applied, and type of problem solved. Findings: Genetic Algorithms (GA) was pointed out as the main solution technique employed by researchers, and the Resource-Constrained Project Scheduling Problem (RCPSP) as the most studied type of problem. On the other hand, the application of new solution techniques, and the possibility of incorporating traditional methods into new PSP variants was presented as research trends. Originality/value: This literature review contents not only a descriptive analysis of the published articles but also a statistical information section in order to examine the state of the research activity carried out in relation to the Project Scheduling Problem with non-deterministic activities duration.Peer Reviewe
Recommended from our members
Issues related to direct seeding of rice in rainfed cropping systems in northwest Bangladesh
Economic factors and developments in rice production technologies are the major drivers that have led to the adoption of direct seeding of rice in place of transplanting in Asia. The primary economic motives for a shift to direct seeding are the savings in labor cost and the possibility of crop intensification. A key development challenge in the drought-prone rainfed agriculture of the Barind Tract of northwest Bangladesh is to simultaneously improve the reliability and yield of monsoon rice while improving total system productivity by increasing the area planted to drought-tolerant postrice crops. Research trials and field-scale evaluation by farmers have demonstrated that dry direct seeding or wet seeding of pregerminated
rice seed reduces labor for crop establishment, results in rice yields similar to or higher than those from conventional transplanting, and advances harvest by
7-10 days. Earlier harvest has the potential to reduce the risk of terminal drought in rice when the monsoon ends abruptly and increases the opportunity for establishing
a postrice crop of chickpea on residual moisture. Herbicide use is essential with direct seeding and this further reduces rice production costs. This modified
rice/legume system using direct seeding is knowledge-intensive. Widespread sustained adoption will depend on farmers undertaking timely tillage, adequate land
leveling, and timely application of herbicides. Extension/farmer training supported by clear decision support frameworks will be needed to provide farmers with access to the knowledge needed to implement direct seeding effectively
Fuzzy uncertainty modelling for project planning; application to helicopter maintenance
Maintenance is an activity of growing interest specially for critical systems. Particularly, aircraft maintenance costs are becoming an important issue in the
aeronautical industry. Managing an aircraft maintenance center is a complex activity. One of the difficulties comes from the numerous uncertainties that affect the activity and disturb the plans at short and medium term. Based
on a helicopter maintenance planning and scheduling problem, we study in this paper the integration of uncertainties into tactical and operational multiresource,
multi-project planning (respectively Rough Cut Capacity Planning and Resource Constraint Project Scheduling Problem). Our main contributions are in modelling the periodic workload on tactical level considering uncertainties in macro-tasks work contents, and modelling the continuous workload on operational level considering uncertainties in tasks durations. We model uncertainties
by a fuzzy/possibilistic approach instead of a stochastic approach since very limited data are available. We refer to the problems as the Fuzzy RoughCut Capacity Problem (FRCCP) and the Fuzzy Resource Constraint Project Scheduling Problem (RCPSP).We apply our models to helicopter maintenance activity within the frame of the Helimaintenance project, an industrial project approved by the French Aerospace Valley cluster which aims at building a center for civil helicopter maintenance
Time-Cost Tradeoff and Resource-Scheduling Problems in Construction: A State-of-the-Art Review
Duration, cost, and resources are defined as constraints in projects. Consequently, Construction manager needs to balance between theses constraints to ensure that project objectives are met. Choosing the best alternative of each activity is one of the most significant problems in construction management to minimize project duration, project cost and also satisfies resources constraints as well as smoothing resources. Advanced computer technologies could empower construction engineers and project managers to make right, fast and applicable decisions based on accurate data that can be studied, optimized, and quantified with great accuracy. This article strives to find the recent improvements of resource-scheduling problems and time-cost trade off and the interacting between them which can be used in innovating new approaches in construction management. To achieve this goal, a state-of-the-art review, is conducted as a literature sample including articles implying three areas of research; time-cost trade off, constrained resources and unconstrained resources. A content analysis is made to clarify contributions and gaps of knowledge to help suggesting and specifying opportunities for future research
A REVIEW AND AN ANNOTATED BIBLIOGRAPHY OF STUDIES REGARDING IRRIGATION INSTITUTIONS, MANAGEMENT AND INVESTMENT IN ASIA
Resource /Energy Economics and Policy,
A sketch outline for a research report on land tenures for China's rural sector
An outline for a paper on Land Tenures in China's Rural Sector based on ideas derived from evidence presented at the CIRD symposium
SOCIOECONOMIC ISSUES IN IRRIGATION DEVELOPMENT AND DISTRIBUTION
Resource /Energy Economics and Policy,
- …