5 research outputs found

    Aplicación de tres métodos de solución al problema de dimensionamiento de lotes y MRP.

    Get PDF
    El contenido del presente documento muestra la aplicación de tres métodos de solución a partir del planteamiento de un problema de dimensionamiento de lotes: Solución mediante la Heurística de Silver – Meal, la Heurística de Balanceo de Período y Parte y la Heurística de Costo Mínimo Unitario. La evaluación de los métodos anteriormente mencionados se realizó de forma manual, a través de recursos bibliográficos proporcionados por el orientador de la asignatura: Control de Producción e Inventarios. Teniendo en cuenta los resultados obtenidos se realizó una comparación entre los mismos y se procedió a elegir la mejor solución la cual se ve justificada mediante una política de costo mínimo

    A review of discrete-time optimization models for tactical production planning

    Full text link
    This is an Accepted Manuscript of an article published in International Journal of Production Research on 27 Mar 2014, available online: http://doi.org/10.1080/00207543.2014.899721[EN] This study presents a review of optimization models for tactical production planning. The objective of this research is to identify streams and future research directions in this field based on the different classification criteria proposed. The major findings indicate that: (1) the most popular production-planning area is master production scheduling with a big-bucket time-type period; (2) most of the considered limited resources correspond to productive resources and, to a lesser extent, to inventory capacities; (3) the consideration of backlogs, set-up times, parallel machines, overtime capacities and network-type multisite configuration stand out in terms of extensions; (4) the most widely used modelling approach is linear/integer/mixed integer linear programming solved with exact algorithms, such as branch-and-bound, in commercial MIP solvers; (5) CPLEX, C and its variants and Lindo/Lingo are the most popular development tools among solvers, programming languages and modelling languages, respectively; (6) most works perform numerical experiments with random created instances, while a small number of works were validated by real-world data from industrial firms, of which the most popular are sawmills, wood and furniture, automobile and semiconductors and electronic devices.This study has been funded by the Universitat Politècnica de València projects: ‘Material Requirement Planning Fourth Generation (MRPIV)’ (Ref. PAID-05-12) and ‘Quantitative Models for the Design of Socially Responsible Supply Chains under Uncertainty Conditions. Application of Solution Strategies based on Hybrid Metaheuristics’ (PAID-06-12).Díaz-Madroñero Boluda, FM.; Mula, J.; Peidro Payá, D. (2014). A review of discrete-time optimization models for tactical production planning. International Journal of Production Research. 52(17):5171-5205. doi:10.1080/00207543.2014.899721S51715205521

    Stok kontrolü ve ekonomik sipariş miktarı modellerinde yeni açılımlar: ödemelerde gecikmeye izin verilmesi durumu ve bir model önerisi

    Get PDF
    Stok kontrol modelleri, talebin kesin olarak bilinip bilinememesine göre deterministik ve olasılıklı modeller olarak ikiye ayrılmaktadır. Deterministik stok kontrol modelleri arasında en yaygın kullanılan modeller Klasik Ekonomik Sipariş ve Üretim Miktarı Modelleridir. Bu modellerde ele alınan varsayımların çoğu, gerçek hayatta geçerli olabilen değişik durumları veya içinde bulunulan ekonomik koşulları dikkate almamaktadır. Dolayısıyla, sözü edilen varsayımların gevşetilmesi veya ek yeni varsayımlar yardımıyla, gerçek yaşamla daha tutarlı ve geçerli ekonomik koşulları dikkate alan yeni modeller üretilmiştir. Örneğin, stoksuzluk, öğrenme, enflasyon ve paranın zaman değeri etkileri, stoktaki ürünlerin zamanla bozulması, kusurlu ürün, ödemelerde gecikmeye izin verilmesi gibi yeni açılımlar, bu alanda geniş bir çalışma yelpazesi oluşmasını sağlamıştır. Bu çalışmada, klasik ekonomik sipariş miktarı modellerinde geçerli olan varsayımlardan bazıları gevşetilerek gelen siparişlerin belli bir oranda kusurlu ürün içerdiği, stoksuzluğa ve ödemelerde belli bir süre gecikmeye izin verildiği durum için yeni bir ekonomik sipariş miktarı modeli elde edilmektedir. Modelde, ödemelerde izin verilen gecikme süresinin iki farklı durumu için optimal değerler ile izin verilen gecikme süresi ve kusurlu ürün oranı arasındaki ilişkiler belirlenmektedir. Ayrıca, geliştirilen model için sayısal örnekler verilmekte ve izin verilen gecikme süresi ve kusurlu ürün oranındaki değişimlerin etkileri duyarlılık analizi ile incelenmektedir. Yapılan analizler sonucu ödemelerde izin verilen gecikme süresi arttıkça sipariş miktarının azaldığı toplam karın ise azaldığı görülmektedir. Anahtar Kelimeler: Ekonomik Sipariş Miktarı, Kusurlu Ürün, Ödemelerde Gecikmeye İzin Verilmesi, Stoksuzluk.\ud Inventory control models are classified as deterministic and stochastic models upon the condition that the demand is definitely known, or not. Economic Order and Production Quantity models are among the most widely used techniques in deterministic inventory control models. As a result of many unrealistic assumptions embedded in these models, some real life situations and current economic circumstances are not considered. Therefore, by loosening these assumptions and introducing some extra hypotheses, many new models consistent with real life and consider current economic conditions were developed. A vast literature has occurred under these conditions which are known as new approaches such as shortage, effect of learning, inflation and time value of money, deterioration, defective items and permissible delay in payment. In this study, a new model is proposed in the case of defective items, permissible delay in payments and shortage by loosening some of the assumptions of classical Economic Order Quantity models. For two case of permissible delay in payments, the relationships between permissible delay time, rate of defective item and optimal values are determined. Furthermore, numerical examples are given and analyzed for the developed model. Changes in the optimal values with respect to the rate of defective item and permissible delay in payments are analyzed with sensitivity analysis. Result of the analysis show that while permissible delay of payment increases order quantity decreases and total profit increases. However when rate of defective items increases order quantity increases and total profit decreases. Keywords: Economic Order Quantity, Defective Items, Permissible Delay in Payments, Shortag

    MRP IV: Planificación de requerimientos de materiales cuarta generación. Integración de la planificación de la producción y del transporte de aprovisionamiento

    Full text link
    Tesis por compendioEl sistema de planificación de requerimientos de materiales o MRP (Material Requirement Planning), desarrollado por Orlicky en 1975, sigue siendo en nuestros días y, a pesar de sus deficiencias identificadas, el sistema de planificación de la producción más utilizado por las empresas industriales. Las evoluciones del MRP se vieron reflejadas en el sistema MRPII (Manufacturing Resource Planning), que considera restricciones de capacidad productiva, MRPIII (Money Resource Planning), que introduce la función de finanzas; y la evolución comercial del mismo en el ERP (Enterprise Resource Planning), que incorpora modularmente todas las funciones de la empresa en un único sistema de decisión, cuyo núcleo central es el MRP. Los desarrollos posteriores de los sistemas ERP han incorporado las nuevas tecnologías de la información y comunicaciones. Asimismo, éstos se han adaptado al contexto económico actual caracterizado por la globalización de los negocios y la deslocalización de los proveedores desarrollando otras funciones como la gestión de la cadena de suministro o del transporte, entre otros. Por otro lado, existen muchos trabajos en la literatura académica que han intentado resolver algunas de las debilidades del MRP tales como la optimización de los resultados, la consideración de la incertidumbre en determinados parámetros, el inflado de los tiempos de entrega, etc. Sin embargo, tanto en el ámbito comercial como en el científico, el MRP y sus variantes se centran en el requerimiento de los materiales y en la planificación de las capacidades de producción, lo que es su desventaja principal en aquellas cadenas de suministro donde existe una gran deslocalización de los proveedores de materias primas y componentes. En estos entornos, la planificación del transporte adquiere un protagonismo fundamental, puesto que los elevados costes y las restricciones logísticas suelen hacer subóptimos e incluso infactibles los planes de producción propuestos, siendo la re-planificación manual una práctica habitual en las empresas. Esta tesis doctoral propone un modelo denominado MRPIV, que considera de forma integrada las decisiones de la planificación de materiales, capacidades de recursos de producción y el transporte, con las restricciones propias de este último, tales como diferentes modos de recogida (milk-run, camión completo, rutas) en la cadena de suministro con el objetivo de evitar la suboptimización de estos planes que en la actualidad se generan usualmente de forma secuencial e independiente. El modelo propuesto se ha validado en una cadena de suministro del sector del automóvil confirmando la reducción de costes totales y una planificación más eficiente del transporte de los camiones necesarios para efectuar el aprovisionamiento.Díaz-Madroñero Boluda, FM. (2015). MRP IV: Planificación de requerimientos de materiales cuarta generación. Integración de la planificación de la producción y del transporte de aprovisionamiento [Tesis doctoral no publicada]. Universitat Politècnica de València. https://doi.org/10.4995/Thesis/10251/48524TESISCompendi