59,687 research outputs found
Single Machine Group Scheduling with Position Dependent Processing Times and Ready Times
We investigate a single machine group scheduling problem with position dependent processing times and ready times. The actual processing time of a job is a function of positive group-dependent job-independent positional factors. The actual setup time of the group is a linear function of the total completion time of the former group. Each job has a release time. The decision should be taken regarding possible sequences of jobs in each group and group sequence to minimize the makespan. We show that jobs in each group are scheduled in nondecreasing order of its release time and the groups are arranged in nondecreasing order of some certain conditions. We also present a polynomial time solution procedure for the special case of the proposed problem
Recommended from our members
Single machine scheduling with general positional deterioration and rate-modifying maintenance
We present polynomial-time algorithms for single machine problems with generalized positional deterioration effects and machine maintenance. The decisions should be taken regarding possible sequences of jobs and on the number of maintenance activities to be included into a schedule in order to minimize the overall makespan. We deal with general non-decreasing functions to represent deterioration rates of job processing times. Another novel extension of existing models is our assumption that a maintenance activity does not necessarily fully restore the machine to its original perfect state. In the resulting schedules, the jobs are split into groups, a particular group to be sequenced after a particular maintenance period, and the actual processing time of a job is affected by the group that job is placed into and its position within the group
Scheduling Jobs in Flowshops with the Introduction of Additional Machines in the Future
This is the author's peer-reviewed final manuscript, as accepted by the publisher. The published article is copyrighted by Elsevier and can be found at: http://www.journals.elsevier.com/expert-systems-with-applications/.The problem of scheduling jobs to minimize total weighted tardiness in flowshops,\ud
with the possibility of evolving into hybrid flowshops in the future, is investigated in\ud
this paper. As this research is guided by a real problem in industry, the flowshop\ud
considered has considerable flexibility, which stimulated the development of an\ud
innovative methodology for this research. Each stage of the flowshop currently has\ud
one or several identical machines. However, the manufacturing company is planning\ud
to introduce additional machines with different capabilities in different stages in the\ud
near future. Thus, the algorithm proposed and developed for the problem is not only\ud
capable of solving the current flow line configuration but also the potential new\ud
configurations that may result in the future. A meta-heuristic search algorithm based\ud
on Tabu search is developed to solve this NP-hard, industry-guided problem. Six\ud
different initial solution finding mechanisms are proposed. A carefully planned\ud
nested split-plot design is performed to test the significance of different factors and\ud
their impact on the performance of the different algorithms. To the best of our\ud
knowledge, this research is the first of its kind that attempts to solve an industry-guided\ud
problem with the concern for future developments
Minimizing sum of completion times on a single machine with sequence-dependent family setup times
This paper presents a branch-and-bound (B&B) algorithm for minimizing the sum of completion times in a singlemachine scheduling setting with sequence-dependent family setup times. The main feature of the B&B algorithm is a new lower bounding scheme that is based on a networkformulation of the problem. With extensive computational tests, we demonstrate that the B&B algorithm can solve problems with up to 60 jobs and 12 families, where setup and processing times are uniformly distributed in various combinations of the [1,50] and [1,100] ranges
Tabu search algorithms for job-shop problems with a single transport robot
We consider a generalized job-shop problem where the jobs additionally have to be transported between the machines by a single transport robot. Besides transportation times for the jobs, empty moving times for the robot are taken into account. The objective is to determine a schedule with minimal makespan. \u
- …