135,423 research outputs found

    A Concurrency Control Method Based on Commitment Ordering in Mobile Databases

    Full text link
    Disconnection of mobile clients from server, in an unclear time and for an unknown duration, due to mobility of mobile clients, is the most important challenges for concurrency control in mobile database with client-server model. Applying pessimistic common classic methods of concurrency control (like 2pl) in mobile database leads to long duration blocking and increasing waiting time of transactions. Because of high rate of aborting transactions, optimistic methods aren`t appropriate in mobile database. In this article, OPCOT concurrency control algorithm is introduced based on optimistic concurrency control method. Reducing communications between mobile client and server, decreasing blocking rate and deadlock of transactions, and increasing concurrency degree are the most important motivation of using optimistic method as the basis method of OPCOT algorithm. To reduce abortion rate of transactions, in execution time of transactions` operators a timestamp is assigned to them. In other to checking commitment ordering property of scheduler, the assigned timestamp is used in server on time of commitment. In this article, serializability of OPCOT algorithm scheduler has been proved by using serializability graph. Results of evaluating simulation show that OPCOT algorithm decreases abortion rate and waiting time of transactions in compare to 2pl and optimistic algorithms.Comment: 15 pages, 13 figures, Journal: International Journal of Database Management Systems (IJDMS

    How to enhance crop production and nitrogen fluxes? A result-oriented scheme to evaluate best agri-environmental measures in Veneto Region, Italy

    Get PDF
    The cost-effectiveness of adopting agri-environmental measures (AEMs) in Europe, which combine agricultural productions with reduced N losses, is debated due to poorly targeted site-specific funding that is allocated regardless of local variability. An integrated DAYCENT model-GIS platform was developed combining pedo-climatic and agricultural systems information. The aim was to evaluate best strategies to improve N fluxes of agro-ecosystems within a perspective of sustainable intensification. Indicators of agronomic efficiency and environmental quality were considered. The results showed that agronomic benefits were observed with a continuous soil cover (conservation agriculture and cover crops), which enhanced nitrogen use efficiency (+17%) and crop yields (+34%), although in some cases these might be overestimated due to modelling limitations. An overall environmental improvement was found with continuous soil cover and long-term change from mineral to organic inputs (NLeach 45 Mg ha 121), which were effective in the sandy soils of western and eastern Veneto with low SOM, improving the soil-water balance and nutrients availability over time. Results suggest that AEM subsidies should be allocated at a site-specific level that includes pedo-climatic variability, following a result-oriented approach

    Enhancing Energy Production with Exascale HPC Methods

    Get PDF
    High Performance Computing (HPC) resources have become the key actor for achieving more ambitious challenges in many disciplines. In this step beyond, an explosion on the available parallelism and the use of special purpose processors are crucial. With such a goal, the HPC4E project applies new exascale HPC techniques to energy industry simulations, customizing them if necessary, and going beyond the state-of-the-art in the required HPC exascale simulations for different energy sources. In this paper, a general overview of these methods is presented as well as some specific preliminary results.The research leading to these results has received funding from the European Union's Horizon 2020 Programme (2014-2020) under the HPC4E Project (www.hpc4e.eu), grant agreement n° 689772, the Spanish Ministry of Economy and Competitiveness under the CODEC2 project (TIN2015-63562-R), and from the Brazilian Ministry of Science, Technology and Innovation through Rede Nacional de Pesquisa (RNP). Computer time on Endeavour cluster is provided by the Intel Corporation, which enabled us to obtain the presented experimental results in uncertainty quantification in seismic imagingPostprint (author's final draft

    The Investigation of Pump Performance and Evaluation over the Internet

    Get PDF
    Selection and configuration are widely met tasks in design; this is an example of a web-based selection/configuration tool with embedded optimisation. Pumps inevitably deteriorate over their product lifecycle, in which interaction generally occurs in terms of flow, pressure and electricity consumption. Practical implementations of pump scheduling suggest that a 10% of the annual expenditure on energy costs may be saved. The object is to minimise the energy cost incurred, while selecting the best schedule of legal available pumps. The results illustrate that the recording of pump characteristics over the internet provides an efficient method of pump performance and evaluation

    Improving Transportation Construction Project Performance: Development of a Model to Support the Decision-Making Process for Incentive/Disincentive Construction Projects, MTI Report 09-07

    Get PDF
    This research presents a project time and cost performance simulation model to assist project planners and managers by providing a complete picture during the Incentive/Disincentive (I/D) contracting decision-making process of possible performance outcomes with probabilities based on historical data. This study was performed by collecting transportation construction project data. The collected project data from the Florida Department of Transportation were evaluated using time and cost performance indices and then statistical data analysis was performed to identify important factors that influence construction project time performance. Using Monte Carlo simulation procedures, this study demonstrated a methodology for developing an I/D project time and cost performance prediction model. User-friendly visual interfaces were developed to perform the simulation and report results using Visual Basic Application programming. The developed model was validated using additional cases of transportation construction projects. Based on statistical analysis, this research found that several project factors influence I/D contracting performance. The important factors that had significant impacts on project performance were the effects of contract type, project type, district, project size, project length, maximum incentive amount, and daily I/D amount. In conclusion, the developed model applied to I/D contracting projects will be a useful tool to assist the project planners and managers during the decision-making process and will promote the efficient use of I/D contracting, which will benefit the traveling public by saving their travel time from construction delays. With additional project data, the developed model can be updated easily and the more data used for the model, the better the accuracy of prediction that can be expected
    • …
    corecore