    Robust optimization for U-shaped assembly line worker assignment and balancing problem with uncertain task times

    Get PDF
    Awareness of the importance of U-shaped assembly line balancing problems is all on the rise. In the U-shaped assembly line, balancing is affected by the uncertainty associated with the assembly task times. Therefore, it is crucial to develop an approach to respond to the uncertainty caused by the task times. When the great majority of existing literature related to uncertainty in the assembly line is considered, it is observed that the U-shaped assembly line balancing problem under uncertainty is scarcely investigated. That being the case, we aim to fill this research gap by proposing a robust counterpart formulation for the addressed problem. In this study, a robust optimization model is developed for the U-shaped assembly line worker assignment and balancing problem (UALWABP) to cope with the task time uncertainty characterized by a combined interval and polyhedral uncertainty set. A real case study is conducted through data from a company producing water meters

    A bibliographic review of production line design and balancing under uncertainty

    Get PDF
    This bibliography reviews the solution methods developed for the design and balancing problems of production lines such as assembly and disassembly lines. The line design problem aims in determining the number of workstations along with the corresponding assignment of tasks to each workstation, while the line balancing problem seeks an assignment of tasks, to the existing workstations of the line, which ensures that the workloads are as equal as possible among the workstations. These two optimisation problems can be also integrated and treated as a multi-objective optimisation problem. This review considers both deterministic and stochastic formulations for disassembly lines and is limited to assembly line design and balancing under uncertainty. This bibliography covers more than 90 publications since 1976 for assembly and 1999 for disassembly

    Research Trends and Outlooks in Assembly Line Balancing Problems

    Get PDF
    This paper presents the findings from the survey of articles published on the assembly line balancing problems (ALBPs) during 2014-2018. Before proceeding a comprehensive literature review, the ineffectiveness of the previous ALBP classification structures is discussed and a new classification scheme based on the layout configurations of assembly lines is subsequently proposed. The research trend in each layout of assembly lines is highlighted through the graphical presentations. The challenges in the ALBPs are also pinpointed as a technical guideline for future research works

    Second order conic approximation for disassembly line design with joint probabilistic constraints

    Get PDF
    A problem of profit oriented disassembly line design and balancing with possible partial disassembly and presence of hazardous parts is studied. The objective is to design a production line providing a maximal revenue with balanced workload. Task times are assumed to be random variables with known normal probability distributions. The cycle time constraints are to be jointly satisfied with at least a predetermined probability level. An AND/OR graph is used to model the precedence relationships among tasks. Several lower and upper–bounding schemes are developed using second order cone programming and convex piecewise linear approximation. To show the relevance and applicability of the proposed approach, a set of instances from the literature are solved to optimality

    A Survey on Cost and Profit Oriented Assembly Line Balancing

    Get PDF
    http://www.nt.ntnu.no/users/skoge/prost/proceedings/ifac2014/media/files/0866.pdfInternational audienceProblems, approaches and analytical models on assembly line balancing that deal explicitly with cost and profit oriented objectives are analysed. This survey paper serves to identify and work on open problems that have wide practical applications. The conclusions derived might give insights in developing decision support systems (DSS) in planning profitable or cost efficient assembly lines

    Re-balancing problem for assembly lines: new mathematical model and exact solution method

    Get PDF
    The purpose of this study is to develop a new mathematical model and an exact solution method for an assembly line rebalancing problem. When an existing assembly line has to be adapted to a new production context, the line balancing, resources allocation and component management solutions have to be revised. The objective is to minimize the number of modifications to be done in the initial line in order to reduce the time and investment needed to meet new production requirements. The proposed model is evaluated via a computational experiment. The obtained results the efficacy of the proposed method

    Balancing Lexicographic Multi-Objective Assembly Lines with Multi-Manned Stations

    Get PDF
    In a multi-manned assembly line, tasks of the same workpiece can be executed simultaneously by different workers working in the same station. This line has significant advantages over a simple assembly line such as shorter line length, less work-in-process, smaller installation space, and less product flow time. In many realistic line balancing situations, there are usually more than one objective conflicting with each other. This paper presents a preemptive goal programming model and some heuristic methods based on variable neighborhood search approach for multi-objective assembly line balancing problems with multi-manned stations. Three different objectives are considered, minimizing the total number of multi-manned stations as the primary objective, minimizing the total number of workers as the secondary objective, and smoothing the number of workers at stations as the tertiary objective. A set of test instances taken from the literature is solved to compare the performance of all methods, and results are presented

    Automatic assembly design project 1968/9 :|breport of economic planning committee

    Get PDF
    Investigations into automatic assembly systems have been carried out. The conclusions show the major features to be considered by a company operating the machine to assemble the contact block with regard to machine output and financial aspects. The machine system has been shown to be economically viable for use under suitable conditions, but the contact block is considered to be unsuitable for automatic assembly. Data for machine specification, reliability and maintenance has been provided

    Robust dynamic schedule coordination control in the supply chain

    Get PDF
    International audienceCoordination plays crucial role in supply chain management. In this paper, we extend the existing body of literature on supply chain coordination by representing a robust schedule coordination approach. A hybrid discrete/continuous flow shop supply chain with job shop processes at each supplier stage is studied. For this purpose, the developed scheduling model comprises operations control (for customer order fulfillment dynamics), channel control (production machine and transportation dynamics), resource control (material supply dynamics), and flow control (processing and shipment dynamics) with multiple objectives. Based on the scheduling model, we introduce a robust analysis of schedule coordination in the presence of disruptions in capacities and supply. The application of attainable sets opens a possibility to analyse schedule coordination dynamics under disruptions. The results provide insights of how to integrate the coordination issues into schedule robustness analysis. We exemplify the developed approach for the case of two-stage supply chain coordination, and derive managerial insights for both considered scheduling problem and application of dynamic control methods to supply chain coordination in general
    • …