    Single machine scheduling problems with uncertain parameters and the OWA criterion

    Get PDF
    In this paper a class of single machine scheduling problems is discussed. It is assumed that job parameters, such as processing times, due dates, or weights are uncertain and their values are specified in the form of a discrete scenario set. The Ordered Weighted Averaging (OWA) aggregation operator is used to choose an optimal schedule. The OWA operator generalizes traditional criteria in decision making under uncertainty, such as the maximum, average, median or Hurwicz criterion. It also allows us to extend the robust approach to scheduling by taking into account various attitudes of decision makers towards the risk. In this paper a general framework for solving single machine scheduling problems with the OWA criterion is proposed and some positive and negative computational results for two basic single machine scheduling problems are provided

    Min-Max Regret Scheduling To Minimize the Total Weight of Late Jobs With Interval Uncertainty

    Full text link
    We study the single machine scheduling problem with the objective to minimize the total weight of late jobs. It is assumed that the processing times of jobs are not exactly known at the time when a complete schedule must be dispatched. Instead, only interval bounds for these parameters are given. In contrast to the stochastic optimization approach, we consider the problem of finding a robust schedule, which minimizes the maximum regret of a solution. Heuristic algorithm based on mixed-integer linear programming is presented and examined through computational experiments

    Survey of dynamic scheduling in manufacturing systems

    Get PDF

    Robust job-sequencing with an uncertain flexible maintenance activity

    Get PDF
    In this study, the problem of scheduling a set of jobs and one uncertain maintenance activity on a single machine, with the objective of minimizing the makespan is addressed. The maintenance activity has a given duration and must be executed within a given time window. Furthermore, duration and time window of the maintenance are uncertain, and can take different values which can be described by different scenarios. The problem is to determine a job sequence which performs well, in terms of makespan, independently on the possible variation of the data concerning the maintenance. A robust scheduling approach is used for the problem, in which four different measures of robustness are considered, namely, maximum absolute regret, maximum relative regret, worst-case scenario, and ordered weighted averaging. Complexity and approximation results are presented. In particular, we show that, for all the four robustness criteria, the problem is strongly NP-hard. A number of special cases are explored, and an exact pseudopolynomial algorithm based on dynamic programming is devised when the number of scenarios is fixed. Two Mixed Integer Programming (MIP) models are also presented for the general problem. Several computational experiments have been conducted to evaluate the efficiency and effectiveness of the MIP models and of the dynamic programming approach

    Practical solutions for a dock assignment problem with trailer transportation.

    Get PDF
    We study a distribution warehouse in which trailers need to be assigned to docks for loading or unloading. A parking lot is used as a buffer zone and transportation between the parking lot and the docks is performed by auxiliary resources called terminal tractors. Each incoming trailer has a known arrival time and each outgoing trailer a desired departure time. The primary objective is to produce a docking schedule such that the weighted sum of the number of late outgoing trailers and the tardiness of these trailers is minimized; the secondary objective is to minimize the weighted completion time of all trailers, both incoming and outgoing. The purpose of this paper is to produce high-quality solutions to large instances that are comparable to a real-life case. We implement several heuristic algorithms: truncated branch and bound, beam search and tabu search. Lagrangian relaxation is embedded in the algorithms for constructing an initial solution and for computing lower bounds. The different solution frameworks are compared via extensive computational experiments.Dock assignment; Multicriteria scheduling; Branch and bound; Beam search; Lagrangian relaxation; Tabu search;

    Models and Strategies for Variants of the Job Shop Scheduling Problem

    Full text link
    Recently, a variety of constraint programming and Boolean satisfiability approaches to scheduling problems have been introduced. They have in common the use of relatively simple propagation mechanisms and an adaptive way to focus on the most constrained part of the problem. In some cases, these methods compare favorably to more classical constraint programming methods relying on propagation algorithms for global unary or cumulative resource constraints and dedicated search heuristics. In particular, we described an approach that combines restarting, with a generic adaptive heuristic and solution guided branching on a simple model based on a decomposition of disjunctive constraints. In this paper, we introduce an adaptation of this technique for an important subclass of job shop scheduling problems (JSPs), where the objective function involves minimization of earliness/tardiness costs. We further show that our technique can be improved by adding domain specific information for one variant of the JSP (involving time lag constraints). In particular we introduce a dedicated greedy heuristic, and an improved model for the case where the maximal time lag is 0 (also referred to as no-wait JSPs).Comment: Principles and Practice of Constraint Programming - CP 2011, Perugia : Italy (2011