    Precedence-Constrained Min Sum Set Cover

    Get PDF
    We introduce a version of the Min Sum Set Cover (MSSC) problem in which there are "AND" precedence constraints on the m sets. In the Precedence-Constrained Min Sum Set Cover (PCMSSC) problem, when interpreted as directed edges, the constraints induce an acyclic directed graph. PCMSSC models the aim of scheduling software tests to prioritize the rate of fault detection subject to dependencies between tests. Our greedy scheme for PCMSSC is similar to the approaches of Feige, Lovasz, and, Tetali for MSSC, and Chekuri and Motwani for precedence-constrained scheduling to minimize weighted completion time. With a factor-4 increase in approximation ratio, we reduce PCMSSC to the problem of finding a maximum-density precedence-closed sub-family of sets, where density is the ratio of sub-family union size to cardinality. We provide a greedy factor-sqrt m algorithm for maximizing density; on forests of in-trees, we show this algorithm finds an optimal solution. Harnessing an alternative greedy argument of Chekuri and Kumar for Maximum Coverage with Group Budget Constraints, on forests of out-trees, we design an algorithm with approximation ratio equal to maximum tree height. Finally, with a reduction from the Planted Dense Subgraph detection problem, we show that its conjectured hardness implies there is no polynomial-time algorithm for PCMSSC with approximation factor in O(m^{1/12-epsilon})

    Solving Assembly Line Balancing Problems by Combining IP and CP

    Full text link
    Assembly line balancing problems consist in partitioning the work necessary to assemble a number of products among different stations of an assembly line. We present a hybrid approach for solving such problems, which combines constraint programming and integer programming.Comment: 10 pages, Sixth Annual Workshop of the ERCIM Working Group on Constraints, Prague, June 200

    Approximate Deadline-Scheduling with Precedence Constraints

    Full text link
    We consider the classic problem of scheduling a set of n jobs non-preemptively on a single machine. Each job j has non-negative processing time, weight, and deadline, and a feasible schedule needs to be consistent with chain-like precedence constraints. The goal is to compute a feasible schedule that minimizes the sum of penalties of late jobs. Lenstra and Rinnoy Kan [Annals of Disc. Math., 1977] in their seminal work introduced this problem and showed that it is strongly NP-hard, even when all processing times and weights are 1. We study the approximability of the problem and our main result is an O(log k)-approximation algorithm for instances with k distinct job deadlines

    Scheduling to Minimize Total Weighted Completion Time via Time-Indexed Linear Programming Relaxations

    Full text link
    We study approximation algorithms for scheduling problems with the objective of minimizing total weighted completion time, under identical and related machine models with job precedence constraints. We give algorithms that improve upon many previous 15 to 20-year-old state-of-art results. A major theme in these results is the use of time-indexed linear programming relaxations. These are natural relaxations for their respective problems, but surprisingly are not studied in the literature. We also consider the scheduling problem of minimizing total weighted completion time on unrelated machines. The recent breakthrough result of [Bansal-Srinivasan-Svensson, STOC 2016] gave a (1.5−c)(1.5-c)-approximation for the problem, based on some lift-and-project SDP relaxation. Our main result is that a (1.5−c)(1.5 - c)-approximation can also be achieved using a natural and considerably simpler time-indexed LP relaxation for the problem. We hope this relaxation can provide new insights into the problem

    Flexible resources allocation techniques: characteristics and modelling

    Get PDF
    At the interface between engineering, economics, social sciences and humanities, industrial engineering aims to provide answers to various sectors of business problems. One of these problems is the adjustment between the workload needed by the work to be realised and the availability of the company resources. The objective of this work is to help to find a methodology for the allocation of flexible human resources in industrial activities planning and scheduling. This model takes into account two levers of flexibility, one related to the working time modulation, and the other to the varieties of tasks that can be performed by a given resource (multi–skilled actor). On the one hand, multi–skilled actors will help to guide the various choices of the allocation to appreciate the impact of these choices on the tasks durations. On the other hand, the working time modulation that allows actors to have a work planning varying according to the workload which the company has to face

    Dagstuhl Reports : Volume 1, Issue 2, February 2011

    Get PDF
    Online Privacy: Towards Informational Self-Determination on the Internet (Dagstuhl Perspectives Workshop 11061) : Simone Fischer-Hübner, Chris Hoofnagle, Kai Rannenberg, Michael Waidner, Ioannis Krontiris and Michael Marhöfer Self-Repairing Programs (Dagstuhl Seminar 11062) : Mauro Pezzé, Martin C. Rinard, Westley Weimer and Andreas Zeller Theory and Applications of Graph Searching Problems (Dagstuhl Seminar 11071) : Fedor V. Fomin, Pierre Fraigniaud, Stephan Kreutzer and Dimitrios M. Thilikos Combinatorial and Algorithmic Aspects of Sequence Processing (Dagstuhl Seminar 11081) : Maxime Crochemore, Lila Kari, Mehryar Mohri and Dirk Nowotka Packing and Scheduling Algorithms for Information and Communication Services (Dagstuhl Seminar 11091) Klaus Jansen, Claire Mathieu, Hadas Shachnai and Neal E. Youn

    Project network models with discounted cash flows. A guided tour through recent developments.

    Get PDF
    The vast majority of the project scheduling methodologies presented in the literature have been developed with the objective of minimizing the project duration subject to precedence and other constraints. In doing so, the financial aspects of project management are largely ignored. Recent efforts have taken into account discounted cash flow and have focused on the maximalization of the net present value (npv) of the project as the more appropriate objective. In this paper we offer a guided tour through the important recent developments in the expanding field of research on deterministic and stochastic project network models with discounted cash flows. Subsequent to a close examination of the rationale behind the npv objective, we offer a taxonomy of the problems studied in the literature and critically review the major contributions. Proper attention is given to npv maximization models for the unconstrained scheduling problem with known cash flows, optimal and suboptimal scheduling procedures with various types of resource constraints, and the problem of determining both the timing and amount of payments.Scheduling; Models; Model; Discounted cash flow; Cash flow; Project scheduling; Project management; Management; Net present value; Value; Problems; Maximization; Optimal;
    • …