944 research outputs found
An Improved Multiobjective PSO for the Scheduling Problem of Panel Block Construction
Uncertainty is common in ship construction. However, few studies have focused on scheduling problems under uncertainty in shipbuilding. This paper formulates the scheduling problem of panel block construction as a multiobjective fuzzy flow shop scheduling problem (FSSP) with a fuzzy processing time, a fuzzy due date, and the just-in-time (JIT) concept. An improved multiobjective particle swarm optimization called MOPSO-M is developed to solve the scheduling problem. MOPSO-M utilizes a ranked-order-value rule to convert the continuous position of particles into the discrete permutations of jobs, and an available mapping is employed to obtain the precedence-based permutation of the jobs. In addition, to improve the performance of MOPSO-M, archive maintenance is combined with global best position selection, and mutation and a velocity constriction mechanism are introduced into the algorithm. The feasibility and effectiveness of MOPSO-M are assessed in comparison with general MOPSO and nondominated sorting genetic algorithm-II (NSGA-II)
Swarm lexicographic goal programming for fuzzy open shop scheduling
In this work we consider a multiobjective open shop scheduling problem with uncertain processing times and flexible due dates, both modelled using fuzzy sets. We adopt a goal programming model based on lexicographic multiobjective optimisation of both makespan and due-date satisfaction and propose a particle swarm algorithm to solve the resulting problem. We present experimental results which show that this multiobjective approach achieves as good results as single-objective algorithms for the objective with the highest priority, while greatly improving on the second objectiv
Hybrid Ant Colony Optimization For Fuzzy Unrelated Parallel Machine Scheduling Problems
This study extends the best hybrid ant colony optimization variant developed by Liao et al. (2014) for crisp unrelated parallel machine scheduling problems to solve fuzzy unrelated parallel machine scheduling problems in consideration of trapezoidal fuzzy processing times, trapezoidal fuzzy sequencing dependent setup times and trapezoidal fuzzy release times. The objective is to find the best schedule taking minimum fuzzy makespan in completing all jobs. In this study, fuzzy arithmetic is used to determine fuzzy completion times of jobs and defuzzification function is used to convert fuzzy numbers back to crisp numbers for ranking. Eight fuzzy ranking methods are tested to find the most feasible one to be employed in this study. The fuzzy arithmetic testing includes four different cases and each case with the following operations separately, i.e., addition, subtraction, multiplication and division, to investigate the spread of fuzziness as fuzzy numbers are subject to more and more number of operations. The effect of fuzzy ranking methods on hybrid ant colony optimization (hACO) is investigated. To prove the correctness of our methodology and coding, unrelated parallel machine scheduling with fuzzy numbers and crisp numbers are compared based on scheduling problems up to 15 machines and 200 jobs. Relative percentage deviation (RPD) is used to evaluate the performance of hACO in solving fuzzy unrelated parallel machine scheduling problems. A numerical study on large-scale scheduling problems up to 20 machines and 200 jobs is conducted to assess the performance of the hACO algorithm. For comparison, a discrete particle swarm optimization (dPSO) algorithm is implemented for fuzzy unrelated parallel machine scheduling problem as well. The results show that the hACO has better performance than dPSO not only in solution quality in terms of RPD value, but also in computational time
A Fuzzy Simheuristic for the Permutation Flow Shop Problem under Stochastic and Fuzzy Uncertainty
[EN] Stochastic, as well as fuzzy uncertainty, can be found in most real-world systems. Considering both types of uncertainties simultaneously makes optimization problems incredibly challenging. In this paper, we analyze the permutation flow shop problem (PFSP) with both stochastic and fuzzy processing times. The main goal is to find the solution (permutation of jobs) that minimizes the expected makespan. However, due to the existence of uncertainty, other characteristics of the solution are also taken into account. In particular, we illustrate how survival analysis can be employed to enrich the probabilistic information given to decision-makers. To solve the aforementioned optimization problem, we extend the concept of a simheuristic framework so it can also include fuzzy elements. Hence, both stochastic and fuzzy uncertainty are simultaneously incorporated in the PFSP. In order to test our approach, classical PFSP instances have been adapted and extended, so that processing times become either stochastic or fuzzy. The experimental results show the effectiveness of the proposed approach when compared with more traditional ones.This work has been partially supported by the Spanish Ministry of Science (PID2019111100RB-C21/AEI/10.13039/501100011033), as well as by the Barcelona Council and the "la Caixa" Foundation under the framework of the Barcelona Science Plan 2020-2023 (grant 21S09355-001).Castaneda, J.; MartĂn, XA.; Ammouriova, M.; Panadero, J.; Juan-PĂ©rez, ĂA. (2022). A Fuzzy Simheuristic for the Permutation Flow Shop Problem under Stochastic and Fuzzy Uncertainty. Mathematics. 10(10):1-17. https://doi.org/10.3390/math10101760117101
Procedural Optimization Models for Multiobjective Flexible JSSP
The most challenging issues related to manufacturing efficiency occur if the jobs to be sched-uled are structurally different, if these jobs allow flexible routings on the equipments and mul-tiple objectives are required. This framework, called Multi-objective Flexible Job Shop Scheduling Problems (MOFJSSP), applicable to many real processes, has been less reported in the literature than the JSSP framework, which has been extensively formalized, modeled and analyzed from many perspectives. The MOFJSSP lie, as many other NP-hard problems, in a tedious place where the vast optimization theory meets the real world context. The paper brings to discussion the most optimization models suited to MOFJSSP and analyzes in detail the genetic algorithms and agent-based models as the most appropriate procedural models
Recommended from our members
An intelligent manufacturing system for heat treatment scheduling
This thesis was submitted for the degree of Doctor of Philosophy and awarded by Brunel University.This research is focused on the integration problem of process planning and scheduling in steel heat treatment operations environment using artificial intelligent techniques that are capable of dealing with such problems.
This work addresses the issues involved in developing a suitable methodology for scheduling heat treatment operations of steel. Several intelligent algorithms have been developed for these propose namely, Genetic Algorithm (GA), Sexual Genetic Algorithm (SGA), Genetic Algorithm with Chromosome differentiation (GACD), Age Genetic Algorithm (AGA), and Mimetic Genetic Algorithm (MGA). These algorithms have been employed to develop an efficient intelligent algorithm using Algorithm Portfolio methodology. After that all the algorithms have been tested on two types of scheduling benchmarks.
To apply these algorithms on heat treatment scheduling, a furnace model is developed for optimisation proposes. Furthermore, a system that is capable of selecting the optimal heat treatment regime is developed so the required metal properties can be achieved with the least energy consumption and the shortest time using Neuro-Fuzzy (NF) and Particle Swarm Optimisation (PSO) methodologies. Based on this system, PSO is used to optimise the heat treatment process by selecting different heat treatment conditions. The selected conditions are evaluated so the best selection can be identified. This work addresses the issues involved in developing a suitable methodology for developing an NF system and PSO for mechanical properties of the steel.
Using the optimisers, furnace model and heat treatment system model, the intelligent system model is developed and implemented successfully. The results of this system were exciting and the optimisers were working correctly
- âŠ