3 research outputs found

    Approximation Algorithms for Generalized Path Scheduling

    Get PDF
    Scheduling problems where the machines can be represented as the edges of a network and each job needs to be processed by a sequence of machines that form a path in this network have been the subject of many research articles (e.g. flow shop is the special case where the network as well as the sequence of machines for each job is a simple path). In this paper we consider one such problem, called Generalized Path Scheduling (GPS) problem, which can be defined as follows. Given a set of non-preemptive jobs J and identical machines M ( |J| = n and |M| = m ). The machines are ordered on a path. Each job j = {P_j = {l_j, r_j}, p_j} is defined by its processing time p_j and a sub-path P_j from machine with index l_j to r_j (l_j, r_j ? M, and l_j ? r_j) specifying the order of machines it must go through. We assume each machine has a queue of infinite size where jobs can sit in the queue to resolve conflicts. Two objective functions, makespan and total completion time, are considered. Machines can be identical or unrelated. In the latter case, this problem generalizes the classical Flow shop problem (in which all jobs have to go through all machines from 1 to m in that order). Generalized Path Scheduling has been studied (e.g. see [Ronald Koch et al., 2009; Zachary Friggstad et al., 2019]). In this paper, we present several improved approximation algorithms for both objectives. For the case of number of machines being sub-logarithmic in the number of jobs we present a PTAS for both makespan and total completion time. The PTAS holds even on unrelated machines setting and therefore, generalizes the result of Hall [Leslie A. Hall, 1998] for the classic problem of Flow shop. For the case of identical machines, we present an O((log m)/(log log m))-approximation algorithms for both objectives, which improve the previous best result of [Zachary Friggstad et al., 2019]. We also show that the GPS problem is NP-complete for both makespan and total completion time objectives

    Scheduling Problems over Network of Machines

    Get PDF
    We consider scheduling problems in which jobs need to be processed through a (shared) network of machines. The network is given in the form of a graph the edges of which represent the machines. We are also given a set of jobs, each specified by its processing time and a path in the graph. Every job needs to be processed in the order of edges specified by its path. We assume that jobs can wait between machines and preemption is not allowed; that is, once a job is started being processed on a machine, it must be completed without interruption. Every machine can only process one job at a time. The makespan of a schedule is the earliest time by which all the jobs have finished processing. The flow time (a.k.a. the completion time) of a job in a schedule is the difference in time between when it finishes processing on its last machine and when the it begins processing on its first machine. The total flow time (or the sum of completion times) is the sum of flow times (or completion times) of all jobs. Our focus is on finding schedules with the minimum sum of completion times or minimum makespan. In this paper, we develop several algorithms (both approximate and exact) for the problem both on general graphs and when the underlying graph of machines is a tree. Even in the very special case when the underlying network is a simple star, the problem is very interesting as it models a biprocessor scheduling with applications to data migration
    corecore