101,067 research outputs found
PSCPF: planning, scheduling and control of patient flow
Paper aims: Lack of operational planning in healthcare organizations may result in service disconnection and reduced value per effort to the patient. Production Planning, Scheduling and Control assists in determining âwhat,â âhow much,â= âwhenâ and âwhereâ to deliver, which may be of great relevance to healthcare services. This study proposes a structural framework and analyzes the implementation of PPSC concepts in OR management. Originality: The application of concepts from manufacturing applied to healthcare as the PPSC, present in this text, demonstrates the crossing and alignment of global management techniques and tools applicable to both areas. Research method: The discussion is based on data gathered through action-research in a Brazilian public hospital. Main findings: In the hospital under study, the PSCPF implementation resulted in increased production control of surgeries, increased efficiency in management of waiting lists, increased operational efficiency, and motivational gains from staff integration. Implications for theory and practice: The understanding and proper implementation of the concept of PPSC contributed =to mitigate problems related to capacity management, reduced the unawareness of different levels of demand and waiting lists, cut down scheduling errors, and prevented the provision of false information from the disconnection between the various areas of the hospital.- (undefined
The relevance of outsourcing and leagile strategies in performance optimization of an integrated process planning and scheduling
Over the past few years growing global competition has forced the manufacturing industries to upgrade their old production strategies with the modern day approaches. As a result, recent interest has been developed towards finding an appropriate policy that could enable them to compete with others, and facilitate them to emerge as a market winner. Keeping in mind the abovementioned facts, in this paper the authors have proposed an integrated process planning and scheduling model inheriting the salient features of outsourcing, and leagile principles to compete in the existing market scenario. The paper also proposes a model based on leagile principles, where the integrated planning management has been practiced. In the present work a scheduling problem has been considered and overall minimization of makespan has been aimed. The paper shows the relevance of both the strategies in performance enhancement of the industries, in terms of their reduced makespan. The authors have also proposed a new hybrid Enhanced Swift Converging Simulated Annealing (ESCSA) algorithm, to solve the complex real-time scheduling problems. The proposed algorithm inherits the prominent features of the Genetic Algorithm (GA), Simulated Annealing (SA), and the Fuzzy Logic Controller (FLC). The ESCSA algorithm reduces the makespan significantly in less computational time and number of iterations. The efficacy of the proposed algorithm has been shown by comparing the results with GA, SA, Tabu, and hybrid Tabu-SA optimization methods
Human Resource Practices as Predictors of Work-Family Outcomes and Employee Turnover
Drawing on a non-random sample of 557 dual- earner white collar employees, this paper explores the relationship between human resource practices and three outcomes of interest to firms and employees: work-family conflict, employeesâ control over managing work and family demands, and employeesâ turnover intentions. We analyze three types of human resource practices: work-family policies, HR incentives designed to induce attachment to the firm, and the design of work. In a series of hierarchical regression equations, we find that work design characteristics explain the most variance in employeesâ control over managing work and family demands, while HR incentives explain the most variance in work-family conflict and turnover intentions. We also find significant gender differences in each of the three models. Our results suggest that the most effective organizational responses to work-family conflict and to turnover are those that combine work-family policies with other human resource practices, including work redesign and commitment-enhancing incentives
Recommended from our members
Project Controls and Management Systems : current practice and how it has changed over the past decade
Project Controls and Management System (PCMS) refers to an ecosystem of processes, tools and personnel required for the proper planning and execution of capital projects throughout the different phases of design, procurement, construction and startup. This can be divided into different focus areas (functions) that would include Estimating, Planning, Scheduling, Cost Control, Change Management, Progressing, and Forecasting. Various trends such as globalization, contractor specialization and information technology developments have impacted the way PCMS are implemented and made it the subject of extensive research over the past years to investigate how to best utilize those trends. Replicating the research methodology used in a 2011 report published by the Construction Research Institute (CII), this work aims to investigate the current status of PCMS implementation and how it has changed over the past decade. It was concluded that while the original PCMS principles are still valid, adoption has drastically changed in terms of efficiency for the majority of the functions. The research also identifies areas of potential concerns and provides recommendations for further improvement.Civil, Architectural, and Environmental Engineerin
Recommended from our members
Exploring the implementation of the Last PlannerÂź System through IGLC community: twenty one years of experience
There is robust evidence that the level of implementation of the Last PlannerÂź System (LPS) is increasing geographically and geometrically in construction. The I nternational Group for Lean Construction (IGLC) community has reported this growth at IGLC conferences over this period. However, no study has explored how the LPS and its implementation has developed or improved. This study explored developments in the LPS from the review of IGLC conference papers. Qualitative research design utilising content analysis was adopted for this study comprising 57 IGLC reports on LPS implementation across 16 countries. The study reveals components of LPS implemented, with measuring of PPC, Weekly Work Planning meeting and recording reasons for non-completion the most reported. The study developed a timeline for the LPS development and revealed that some of the papers reviewed have no defined methodology. The study concludes that the LPS has developed in terms of its level of implementation, theory development, and as a vehicle to improve construction management practice across the major continents of the world, with elements that had little presence at the onset now prominent. The study recommends that more attention should be given to the relationship between practical applications and research methods to aid the establishment of sound theory to improve practice
Integrating labor awareness to energy-efficient production scheduling under real-time electricity pricing : an empirical study
With the penetration of smart grid into factories, energy-efficient production scheduling has emerged as a promising method for industrial demand response. It shifts flexible production loads to lower-priced periods to reduce energy cost for the same production task. However, the existing methods only focus on integrating energy awareness to conventional production scheduling models. They ignore the labor cost which is shift-based and follows an opposite trend of energy cost. For instance, the energy cost is lower during nights while the labor cost is higher. Therefore, this paper proposes a method for energy-efficient and labor-aware production scheduling at the unit process level. This integrated scheduling model is mathematically formulated. Besides the state-based energy model and genetic algorithm-based optimization, a continuous-time shift accumulation heuristic is proposed to synchronize power states and labor shifts. In a case study of a Belgian plastic bottle manufacturer, a set of empirical sensitivity analyses were performed to investigate the impact of energy and labor awareness, as well as the production-related factors that influence the economic performance of a schedule. Furthermore, the demonstration was performed in 9 large-scale test instances, which encompass the cases where energy cost is minor, moderate, and major compared to the joint energy and labor cost. The results have proven that the ignorance of labor in existing energy-efficient production scheduling studies increases the joint energy and labor cost, although the energy cost can be minimized. To achieve effective production cost reduction, energy and labor awareness are recommended to be jointly considered in production scheduling. (C) 2017 Elsevier Ltd. All rights reserved
Integration of cost-risk assessment of denial of service within an intelligent maintenance system
As organisations become richer in data the function of asset management will have to increasingly use intelligent systems to control condition monitoring systems and organise maintenance. In the future the UK rail industry is anticipating having to optimize capacity by running trains closer to each other. In this situation maintenance becomes extremely problematic as within such a high-performance network a relatively minor fault will impact more trains and passengers; such denial of service causes reputational damage for the industry and causes fines to be levied against the infrastructure owner, Network Rail.
Intelligent systems used to control condition monitoring systems will need to optimize for several factors; optimization for minimizing denial of service will be one such factor. With schedules anticipated to be increasingly complicated detailed estimation methods will be extremely difficult to implement. Cost prediction of maintenance activities tend to be expert driven and require extensive details, making automation of such an activity difficult. Therefore a stochastic process will be needed to approach the problem of predicting the denial of service arising from any required maintenance. Good uncertainty modelling will help to increase the confidence of estimates.
This paper seeks to detail the challenges that the UK Railway industry face with regards to cost modelling of maintenance activities and outline an example of a suitable cost model for quantifying cost uncertainty. The proposed uncertainty quantification is based on historical cost data and interpretation of its statistical distributions. These estimates are then integrated in a cost model to obtain accurate uncertainty measurements of outputs through Monte-Carlo simulation methods. An additional criteria of the model was that it be suitable for integration into an existing prototype integrated intelligent maintenance system. It is anticipated that applying an integrated maintenance management system will apply significant downward pressure on maintenance budgets and reduce denial of service. Accurate cost estimation is therefore of great importance if anticipated cost efficiencies are to be achieved. While the rail industry has been the focus of this work, other industries have been considered and it is anticipated that the approach will be applicable to many other organisations across several asset management intensive industrie
Multi Agent Systems in Logistics: A Literature and State-of-the-art Review
Based on a literature survey, we aim to answer our main question: ĂąâŹĆHow should we plan and execute logistics in supply chains that aim to meet todayĂąâŹâąs requirements, and how can we support such planning and execution using IT?ù⏠TodayĂąâŹâąs requirements in supply chains include inter-organizational collaboration and more responsive and tailored supply to meet specific demand. Enterprise systems fall short in meeting these requirements The focus of planning and execution systems should move towards an inter-enterprise and event-driven mode. Inter-organizational systems may support planning going from supporting information exchange and henceforth enable synchronized planning within the organizations towards the capability to do network planning based on available information throughout the network. We provide a framework for planning systems, constituting a rich landscape of possible configurations, where the centralized and fully decentralized approaches are two extremes. We define and discuss agent based systems and in particular multi agent systems (MAS). We emphasize the issue of the role of MAS coordination architectures, and then explain that transportation is, next to production, an important domain in which MAS can and actually are applied. However, implementation is not widespread and some implementation issues are explored. In this manner, we conclude that planning problems in transportation have characteristics that comply with the specific capabilities of agent systems. In particular, these systems are capable to deal with inter-organizational and event-driven planning settings, hence meeting todayĂąâŹâąs requirements in supply chain planning and execution.supply chain;MAS;multi agent systems
- âŠ