3 research outputs found

    Hybrid algorithms for independent batch scheduling in grids

    Get PDF
    Grid computing has emerged as a wide area distributed paradigm for solving large-scale problems in science, engineering, etc. and is known as the family of eScience grid-enabled applications. Computing planning of incoming jobs efficiently with available machines in the grid system is the main requirement for optimised system performance. One version of the problem is that of independent batch scheduling, in which jobs are assumed to be independent and are scheduled in batches aimed at minimising the makespan and flowtime. Given the hardness of the problem, heuristics are used to find high quality solutions for practical purposes of designing efficient grid schedulers. Recently, considerable efforts were spent in implementing and evaluating not only stand-alone heuristics and meta-heuristics, but also their hybridisation into even higher level algorithms. In this paper, we present a study on the performance of two popular algorithms for the problem, namely Genetic Algorithms (GAs) and Tabu Search (TS) and two hybridisations involving them, namely, the GA (TS) and GA-TS, which differ in the way the main control and cooperation among GA and TS are implemented. The hierarchic and simultaneous optimisation modes are considered for the bi-objective scheduling problem. Evaluation is done using different grid scenarios generated by a grid simulator. The computational results showed that the hybrid algorithm outperforms both the GA and TS for the makespan parameter, but not for the flowtime parameter.Peer ReviewedPostprint (author's final draft

    Implementation and evaluation of a simulation system based on particle swarm optimisation for node placement problem in wireless mesh networks

    Get PDF
    With the fast development of wireless technologies, wireless mesh networks (WMNs) are becoming an important networking infrastructure due to their low cost and increased high speed wireless internet connectivity. This paper implements a simulation system based on particle swarm optimisation (PSO) in order to solve the problem of mesh router placement in WMNs. Four replacement methods of mesh routers are considered: constriction method (CM), random inertia weight method (RIWM), linearly decreasing Vmax method (LDVM) and linearly decreasing inertia weight method (LDIWM). Simulation results are provided, showing that the CM converges very fast, but has the worst performance among the methods. The considered performance metrics are the size of giant component (SGC) and the number of covered mesh clients (NCMC). The RIWM converges fast and the performance is good. The LDIWM is a combination of RIWM and LDVM. The LDVM converges after 170 number of phases but has a good performance.Peer ReviewedPostprint (author's final draft

    Hybrid algorithms for independent batch scheduling in grids

    No full text
    Grid computing has emerged as a wide area distributed paradigm for solving large-scale problems in science, engineering, etc. and is known as the family of eScience grid-enabled applications. Computing planning of incoming jobs efficiently with available machines in the grid system is the main requirement for optimised system performance. One version of the problem is that of independent batch scheduling, in which jobs are assumed to be independent and are scheduled in batches aimed at minimising the makespan and flowtime. Given the hardness of the problem, heuristics are used to find high quality solutions for practical purposes of designing efficient grid schedulers. Recently, considerable efforts were spent in implementing and evaluating not only stand-alone heuristics and meta-heuristics, but also their hybridisation into even higher level algorithms. In this paper, we present a study on the performance of two popular algorithms for the problem, namely Genetic Algorithms (GAs) and Tabu Search (TS) and two hybridisations involving them, namely, the GA (TS) and GA-TS, which differ in the way the main control and cooperation among GA and TS are implemented. The hierarchic and simultaneous optimisation modes are considered for the bi-objective scheduling problem. Evaluation is done using different grid scenarios generated by a grid simulator. The computational results showed that the hybrid algorithm outperforms both the GA and TS for the makespan parameter, but not for the flowtime parameter.Peer Reviewe
    corecore