17,187 research outputs found

    Transportation Life Cycle Assessment Synthesis: Life Cycle Assessment Learning Module Series

    Get PDF
    The Life Cycle Assessment Learning Module Series is a set of narrated, self-advancing slideshows on various topics related to environmental life cycle assessment (LCA). This research project produced the first 27 of such modules, which are freely available for download on the CESTiCC website http://cem.uaf.edu/cesticc/publications/lca.aspx. Each module is roughly 15- 20 minutes in length and is intended for various uses such as course components, as the main lecture material in a dedicated LCA course, or for independent learning in support of research projects. The series is organized into four overall topical areas, each of which contain a group of overview modules and a group of detailed modules. The A and α groups cover the international standards that define LCA. The B and ÎČ groups focus on environmental impact categories. The G and Îł groups identify software tools for LCA and provide some tutorials for their use. The T and τ groups introduce topics of interest in the field of transportation LCA. This includes overviews of how LCA is frequently applied in that sector, literature reviews, specific considerations, and software tutorials. Future modules in this category will feature methodological developments and case studies specific to the transportation sector

    Can the U.S. Get There from Here?

    Get PDF
    Climate change impacts in the United States are increasingly evident and come with steep economic and social costs. The frequency and intensity of extreme weather events has increased in recent years, bringing record-breaking heat, heavy precipitation, coastal flooding, severe droughts, and damaging wildfires.According to the National Oceanic and Atmospheric Administration (NOAA), weather-related damages in the United States were $60 billion in 2011, and are expected to be significantly greater in 2012.The mounting costs convey an unmistakable urgency to address climate change by reducing greenhouse gas emissions (GHGs). This report examines pathways for GHG reductions in the United States through actions taken at the federal and state levels without the need for new legislation from the U.S. Congress

    The relevance of outsourcing and leagile strategies in performance optimization of an integrated process planning and scheduling

    Get PDF
    Over the past few years growing global competition has forced the manufacturing industries to upgrade their old production strategies with the modern day approaches. As a result, recent interest has been developed towards finding an appropriate policy that could enable them to compete with others, and facilitate them to emerge as a market winner. Keeping in mind the abovementioned facts, in this paper the authors have proposed an integrated process planning and scheduling model inheriting the salient features of outsourcing, and leagile principles to compete in the existing market scenario. The paper also proposes a model based on leagile principles, where the integrated planning management has been practiced. In the present work a scheduling problem has been considered and overall minimization of makespan has been aimed. The paper shows the relevance of both the strategies in performance enhancement of the industries, in terms of their reduced makespan. The authors have also proposed a new hybrid Enhanced Swift Converging Simulated Annealing (ESCSA) algorithm, to solve the complex real-time scheduling problems. The proposed algorithm inherits the prominent features of the Genetic Algorithm (GA), Simulated Annealing (SA), and the Fuzzy Logic Controller (FLC). The ESCSA algorithm reduces the makespan significantly in less computational time and number of iterations. The efficacy of the proposed algorithm has been shown by comparing the results with GA, SA, Tabu, and hybrid Tabu-SA optimization methods

    Decision support for build-to-order supply chain management through multiobjective optimization

    Get PDF
    This is the post-print version of the final paper published in International Journal of Production Economics. The published article is available from the link below. Changes resulting from the publishing process, such as peer review, editing, corrections, structural formatting, and other quality control mechanisms may not be reflected in this document. Changes may have been made to this work since it was submitted for publication. Copyright @ 2010 Elsevier B.V.This paper aims to identify the gaps in decision-making support based on multiobjective optimization (MOO) for build-to-order supply chain management (BTO-SCM). To this end, it reviews the literature available on modelling build-to-order supply chains (BTO-SC) with the focus on adopting MOO techniques as a decision support tool. The literature has been classified based on the nature of the decisions in different part of the supply chain, and the key decision areas across a typical BTO-SC are discussed in detail. Available software packages suitable for supporting decision making in BTO supply chains are also identified and their related solutions are outlined. The gap between the modelling and optimization techniques developed in the literature and the decision support needed in practice are highlighted. Future research directions to better exploit the decision support capabilities of MOO are proposed. These include: reformulation of the extant optimization models with a MOO perspective, development of decision supports for interfaces not involving manufacturers, development of scenarios around service-based objectives, development of efficient solution tools, considering the interests of each supply chain party as a separate objective to account for fair treatment of their requirements, and applying the existing methodologies on real-life data sets.Brunel Research Initiative and Enterprise Fund (BRIEF

    Integrated asset management system for performance-based road maintenance contracts

    Get PDF
    Performance-based maintenance contracts (PBMC) for highways are increasingly becoming an attractive mechanism for transferring activities traditionally undertaken by the public sector to private entities. Increased financial pressures on governments, demands for improved service levels by highway users, and the operational efficiencies offered by the private sector, all create a strong business case for PBMC. In order to enable government road agencies and private sector investors to engage in the use of PBMC, there is a need for quantitative tools that allow both entities to 1) Properly structure the PBMC in terms of risk allocation, 2) Develop appropriate levels for service level penalties and incentives in the contract, 3) Determine appropriate targets for highway level of service, and 4) Determine the most cost-effective set of road maintenance and rehabilitation (M&R) activities to be undertaken throughout the duration of the contract. This research developed a GIS-based Integrated Highway Asset Management System (IHAMS), which extends typical functionality of traditional pavement management systems to cover specific contractual requirements of PBMC. The system allows the analysis of both network-level and project-level asset management decisions. Defect-specific pavement deterioration models are developed using multivariate regression. Stochastic network-level deterioration models are developed using markov chains. Life cycle costing models are developed to cover specific financial obligations in PBMC like penalties and incentives, in addition to traditional M&R expenditure. A GA-based optimization modules is used to trade-off various decision scenarios that are beneficial to both road maintenance contracts and road agencies. A case study for the Cairo-Ismalliyah desert highway is used to demonstrate the capability of the system

    A Simulation Technology for Supply-Chain Ingeration

    Get PDF

    Annual Report, 2006

    Get PDF
    • 

    corecore