219 research outputs found

    Multi-processor Scheduling to Minimize Flow Time with epsilon Resource Augmentation

    Get PDF
    We investigate the problem of online scheduling of jobs to minimize flow time and stretch on m identical machines. We consider the case where the algorithm is given either (1 + ε)m machines or m machines of speed (1 + ε), for arbitrarily small ε \u3e 0. We show that simple randomized and deterministic load balancing algorithms, coupled with simple single machine scheduling strategies such as SRPT (shortest remaining processing time) and SJF (shortest job first), are O(poly(1/ε))-competitive for both flow time and stretch. These are the first results which prove constant factor competitive ratios for flow time or stretch with arbitrarily small resource augmentation. Both the randomized and the deterministic load balancing algorithms are non- migratory and do immediate dispatch of jobs. The randomized algorithm just allocates each incoming job to a random machine. Hence this algorithm is non- clairvoyant, and coupled with SETF (shortest elapsed time first), yields the first non-clairvoyant algorithm which is con- stant competitive for minimizing flow time with arbitrarily small resource augmentation. The deterministic algorithm that we analyze is due to Avrahami and Azar. For this algorithm, we show O(1/ε)-competitiveness for total flow time and stretch, and also for their Lp norms, for any fixed p ≥ 1

    Dynamic scheduling in a multi-product manufacturing system

    Get PDF
    To remain competitive in global marketplace, manufacturing companies need to improve their operational practices. One of the methods to increase competitiveness in manufacturing is by implementing proper scheduling system. This is important to enable job orders to be completed on time, minimize waiting time and maximize utilization of equipment and machineries. The dynamics of real manufacturing system are very complex in nature. Schedules developed based on deterministic algorithms are unable to effectively deal with uncertainties in demand and capacity. Significant differences can be found between planned schedules and actual schedule implementation. This study attempted to develop a scheduling system that is able to react quickly and reliably for accommodating changes in product demand and manufacturing capacity. A case study, 6 by 6 job shop scheduling problem was adapted with uncertainty elements added to the data sets. A simulation model was designed and implemented using ARENA simulation package to generate various job shop scheduling scenarios. Their performances were evaluated using scheduling rules, namely, first-in-first-out (FIFO), earliest due date (EDD), and shortest processing time (SPT). An artificial neural network (ANN) model was developed and trained using various scheduling scenarios generated by ARENA simulation. The experimental results suggest that the ANN scheduling model can provided moderately reliable prediction results for limited scenarios when predicting the number completed jobs, maximum flowtime, average machine utilization, and average length of queue. This study has provided better understanding on the effects of changes in demand and capacity on the job shop schedules. Areas for further study includes: (i) Fine tune the proposed ANN scheduling model (ii) Consider more variety of job shop environment (iii) Incorporate an expert system for interpretation of results. The theoretical framework proposed in this study can be used as a basis for further investigation

    A Simple, Practical Prioritization Scheme for a Job Shop Processing Multiple Job Types

    Get PDF
    The maintenance, repair, and overhaul (MRO) process is used to recondition equipment in the railroad, off-shore drilling, aircraft, and shipping industries. In the typical MRO process, the equipment is disassembled into component parts and these parts are routed to back-shops for repair. Repaired parts are returned for reassembling the equipment. Scheduling the back-shop for smooth flow often requires prioritizing the repair of component parts from different original assemblies at different machines. To enable such prioritization, we model the back-shop as a multi-class queueing network with a ConWIP execution system and introduce a new priority scheme to maximize the system performance. In this scheme, we identify the bottleneck machine based on overall workload and classify machines into two categories: the bottleneck machine and the non-bottleneck machine(s). Assemblies with the lowest cycle time receive the highest priority on the bottleneck machine and the lowest priority on non-bottleneck machine(s). Our experimental results show that this priority scheme increases the system performance by lowering the average cycle times without adversely impacting the total throughput. The contribution of this thesis consists primarily of three parts. First, we develop a simple priority scheme for multi-class, multi-server, ConWIP queueing systems with the disassembly/reassembly feature so that schedulers for a job-shop environment would be able to know which part should be given priority, in what order and where. Next, we provide an exact analytical solution to a two-class, two-server closed queueing model with mixed non-preemptive priority scheme. The queueing network model we study has not been analyzed in the literature, and there are no existing models that address the underlying problem of deciding prioritization by job types to maximize the system performance. Finally, we explore conditions under which the non-preemptive priority discipline can be approximated by a preemptive priority discipline

    An efficient discrete artificial bee colony algorithm for the blocking flow shop problem with total flowtime minimization

    Get PDF
    This paper presents a high performing Discrete Artificial Bee Colony algorithm for the blocking flow shop problem with flow time criterion. To develop the proposed algorithm, we considered four strategies for the food source phase and two strategies for each of the three remaining phases (employed bees, onlookers and scouts). One of the strategies tested in the food source phase and one implemented in the employed bees phase are new. Both have been proved to be very effective for the problem at hand. The initialization scheme named HPF2(¿, µ) in particular, which is used to construct the initial food sources, is shown in the computational evaluation to be one of the main procedures that allow the DABC_RCT to obtain good solutions for this problem. To find the best configuration of the algorithm, we used design of experiments (DOE). This technique has been used extensively in the literature to calibrate the parameters of the algorithms but not to select its configuration. Comparing it with other algorithms proposed for this problem in the literature demonstrates the effectiveness and superiority of the DABC_RCTPeer ReviewedPostprint (author’s final draft

    Serial-batch scheduling – the special case of laser-cutting machines

    Get PDF
    The dissertation deals with a problem in the field of short-term production planning, namely the scheduling of laser-cutting machines. The object of decision is the grouping of production orders (batching) and the sequencing of these order groups on one or more machines (scheduling). This problem is also known in the literature as "batch scheduling problem" and belongs to the class of combinatorial optimization problems due to the interdependencies between the batching and the scheduling decisions. The concepts and methods used are mainly from production planning, operations research and machine learning

    A survey of scheduling problems with setup times or costs

    Get PDF
    Author name used in this publication: C. T. NgAuthor name used in this publication: T. C. E. Cheng2007-2008 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe

    Coordinating production and distribution of jobs with bundling operations

    Get PDF
    Department of Logistics2006-2007 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe
    corecore