59,825 research outputs found

    Towards a lean model for production management of refurbishment projects, VTT Technology: 94

    Get PDF
    This is the Stage 3 Report for the ApRemodel project, which aims at improving processes for multi-occupancy retrofit by generating a lean model for project delivery. In this respect, a process-driven approach has been adopted to investigate what can be done to improve the way that retrofits projects are delivered. An initial literature review, focused on the management of refurbishment works, revealed that the research on this matter is scarce. There are plenty of studies related to the broad refurbishment area, however only a small number refer to the way that those construction projects are delivered. According to the literature, construction organisations have predominantly used traditional methods for managing the production of refurbishment projects. The problem is that those tools and techniques are not often appropriate to cope with the complex characteristics inherent to construction projects, especially in the case of refurbishments. Moreover, they have often not been based on a clear theoretical foundation. As a result, numerous types of waste have been identified in refurbishment projects such as waiting time, disruptions in performing tasks on site, rework, among others. This has led to unsatisfactory project performance in terms of low productivity, project delays, and cost overrun. The first step towards better production management in refurbishment projects is recognising the complexity of the sector in order to adopt the correct approach to cope with this specific scenario. In this respect, lean construction is identified as an appropriate way to deal with the complexity and uncertainty inherent in refurbishment projects, given that this management philosophy fully integrates the conversion, flow, and value views. This document builds on the findings from the literature review as well as evidence from case studies. Managerial practices based on lean construction principles have presented successful results in the management of complex projects. Case studies available in the literature report the feasibility and usefulness of this theoretical foundation. Moreover, the evidence from these studies show considerable potential for improving the management of refurbishment works. A list of methods, tools, and techniques are identified. This report may be used by construction refurbishment organisations and housing associations as a starting point for improving the efficiency in managing production of refurbishment projects. To this end, partnerships between industry and academia are strongly recommended. 4 Although the usefulness of lean principles in complex projects is already proved, further work is needed to check what practices are best for the respective refurbishment context, as well as identifying enablers and barriers for practical adoption. Furthermore, additional studies would be also necessary to better understand the extent to which the implementation of lean philosophy might influence performance of refurbishment projects. This report should be seen as work in progress with much more to learn, as detailed research work around the sustainable retrofit process in a lean way is further developed

    Introducing the STAMP method in road tunnel safety assessment

    Get PDF
    After the tremendous accidents in European road tunnels over the past decade, many risk assessment methods have been proposed worldwide, most of them based on Quantitative Risk Assessment (QRA). Although QRAs are helpful to address physical aspects and facilities of tunnels, current approaches in the road tunnel field have limitations to model organizational aspects, software behavior and the adaptation of the tunnel system over time. This paper reviews the aforementioned limitations and highlights the need to enhance the safety assessment process of these critical infrastructures with a complementary approach that links the organizational factors to the operational and technical issues, analyze software behavior and models the dynamics of the tunnel system. To achieve this objective, this paper examines the scope for introducing a safety assessment method which is based on the systems thinking paradigm and draws upon the STAMP model. The method proposed is demonstrated through a case study of a tunnel ventilation system and the results show that it has the potential to identify scenarios that encompass both the technical system and the organizational structure. However, since the method does not provide quantitative estimations of risk, it is recommended to be used as a complementary approach to the traditional risk assessments rather than as an alternative. (C) 2012 Elsevier Ltd. All rights reserved

    Exploring the importance of reflection in the control room

    Get PDF
    While currently difficult to measure or explicitly design for, evidence suggests that providing people with opportunities to reflect on experience must be recognized and valued during safety-critical work. We provide an insight into reflection as a mechanism that can help to maintain both individual and team goals. In the control room, reflection can be task-based, critical for the 'smooth' day-to-day operational performance of a socio-technical system, or can foster learning and organisational change by enabling new understandings gained from experience. In this position paper we argue that technology should be designed to support the reflective capacity of people. There are many interaction designs and artefacts that aim to support problem-solving, but very few that support self-reflection and group reflection. Traditional paradigms for safety-critical systems have focussed on ensuring the functional correctness of designs, minimising the time to complete tasks, etc. Work in the area of user experience design may be of increasing relevance when generating artefacts that aim to encourage reflection

    A dynamic systems engineering methodology research study. Phase 2: Evaluating methodologies, tools, and techniques for applicability to NASA's systems projects

    Get PDF
    A study of NASA's Systems Management Policy (SMP) concluded that the primary methodology being used by the Mission Operations and Data Systems Directorate and its subordinate, the Networks Division, is very effective. Still some unmet needs were identified. This study involved evaluating methodologies, tools, and techniques with the potential for resolving the previously identified deficiencies. Six preselected methodologies being used by other organizations with similar development problems were studied. The study revealed a wide range of significant differences in structure. Each system had some strengths but none will satisfy all of the needs of the Networks Division. Areas for improvement of the methodology being used by the Networks Division are listed with recommendations for specific action

    Making intelligent systems team players: Case studies and design issues. Volume 1: Human-computer interaction design

    Get PDF
    Initial results are reported from a multi-year, interdisciplinary effort to provide guidance and assistance for designers of intelligent systems and their user interfaces. The objective is to achieve more effective human-computer interaction (HCI) for systems with real time fault management capabilities. Intelligent fault management systems within the NASA were evaluated for insight into the design of systems with complex HCI. Preliminary results include: (1) a description of real time fault management in aerospace domains; (2) recommendations and examples for improving intelligent systems design and user interface design; (3) identification of issues requiring further research; and (4) recommendations for a development methodology integrating HCI design into intelligent system design

    Risk-Based Design of Socio-Cyber-Physical Systems

    Get PDF
    The aim of risk management of socio-cyber-physical systems at designing is the integral safety, which ensures their coexistence with their vicinity  throughout their life cycles. On the basis of present knowledge and experience, part of risks that threaten socio-cyber-physical systems shall be mitigated by preentive measures during their designing and manufacturing. Due to dynamic changes of the world, the conditions of socio-cyber-physical systems at operation change. If  changes exceed the socio-cyber-physical systems´ safety limits which were inserted into their designs, the accidents or  socio-cyber-physical sysems´ failures occur. The presented risk management plan is tool which ensures the prevention of such unaccepted situations and the safety.  
    • …
    corecore