471 research outputs found

    HAPS Gateway Link in the 5850-7075 MHz and Coexistence with Fixed Satellite Service

    Get PDF
    Gateway link is essential to connect HAPS platform to terrestrial based networks. This crucial link is incorporated in HAPS fixed service spectrum allocation in considerably high frequencies, renders the link for more attenuations by atmospheric gases, and rain effects, especially when the regional climate is not favorable. However, under the agenda item 1.20 of World Radio Conference-2012 (WRC-12) new HAPS allocation in the 5850-7075 MHz band is proposed. Although, spectrum features are incomparably reliable, on the contrary, Fixed Satellite Service (FSS) uplink transmissions will have signal levels much higher than those in HAPS systems and have the potential for causing interference at the HAPS gateway receiver. In this article a key aspect of co-channel interference phenomena is investigated to facilitate optimum frequency sharing in the band in question. By proposing mitigation techniques and statistical method this generic prediction model enhances the capability of the HAPS spectrum sharing and provides flexibility in spectrum planning for different fixed services

    The history of WiMAX: a complete survey of the evolution in certification and standarization for IEEE 802.16 and WiMAX

    Get PDF
    Most researchers are familiar with the technical features of WiMAX technology but the evolution that WiMAX went through, in terms of standardization and certification, is missing and unknown to most people. Knowledge of this historical process would however aid to understand how WiMAX has become the widespread technology that it is today. Furthermore, it would give insight in the steps to undertake for anyone aiming at introducing a new wireless technology on a worldwide scale. Therefore, this article presents a survey on all relevant activities that took place within three important organizations: the 802.16 Working Group of the IEEE (Institute of Electrical and Electronics Engineers) for technology development and standardization, the WiMAX Forum for product certification and the ITU (International Telecommunication Union) for international recognition. An elaborated and comprehensive overview of all those activities is given, which reveals the importance of the willingness to innovate and to continuously incorporate new ideas in the IEEE standardization process and the importance of the WiMAX Forum certification label granting process to ensure interoperability. We also emphasize the steps that were taken in cooperating with the ITU to improve the international esteem of the technology. Finally, a WiMAX trend analysis is made. We showed how industry interest has fluctuated over time and quantified the evolution in WiMAX product certification and deployments. It is shown that most interest went to the 2.5 GHz and 3.5GHz frequencies, that most deployments are in geographic regions with a lot of developing countries and that the highest people coverage is achieved in Asia Pacific. This elaborated description of all standardization and certification activities, from the very start up to now, will make the reader comprehend how past and future steps are taken in the development process of new WiMAX features

    Mobile Broadband Possibilities considering the Arrival of IEEE 802.16m & LTE with an Emphasis on South Asia

    Get PDF
    This paper intends to look deeper into finding an ideal mobile broadband solution. Special stress has been put in the South Asian region through some comparative analysis. Proving their competency in numerous aspects, WiMAX and LTE already have already made a strong position in telecommunication industry. Both WiMAX and LTE are 4G technologies designed to move data rather than voice having IP networks based on OFDM technology. So, they aren't like typical technological rivals as of GSM and CDMA. But still a gesture of hostility seems to outburst long before the stable commercial launch of LTE. In this paper various aspects of WiMAX and LTE for deployment have been analyzed. Again, we tried to make every possible consideration with respect to south Asia i.e. how mass people of this region may be benefited. As a result, it might be regarded as a good source in case of making major BWA deployment decisions in this region. Besides these, it also opens the path for further research and in depth thinking in this issue.Comment: IEEE Publication format, ISSN 1947 5500, http://sites.google.com/site/ijcsis

    Spectrum-sharing method for co-existence between 5G OFDM-based system and fixed service

    Get PDF
    This study investigates the co-existence of fifth generation (5G) mobile communication systems and fixed service (FS) in the 28-GHz band through the utilization and modification of an existing spectrum-sharing method known as the advanced minimum coupling loss (A-MCL) model. The proposed model is based on the power spectral density (PSD) overlap between the 5G orthogonal frequency-division multiplexing (OFDM)-based system and the FS. Spectrum-sharing studies typically need 5G parameters, such as the spectrum emission mask (SEM); however, no such information is available for the new system to achieve accurate results. The proposed model is suitable for spectrum-sharing studies between 5G and other wireless systems without the need for the 5G SEM. Moreover, the existing model is implemented in a new application (i.e., 5G) in the 28-GHz band with different 5G bandwidths. Furthermore, the FS parameters and its frequency allocation are selected based on the Canadian standards to obtain preliminary results for the co-existence between the 5G system and the FS. Results show that co-existence is feasible when certain distances are applied, especially with higher 5G bandwidths (such as 0.5 and 1 GHz) when the 5G system acts as an interferer. In addition, the antenna position plays a major role in reducing the required separation distances between the victim receiver and the interfering transmitter. This model can be used for any future mobile generation such as the sixth generation (6G) mobile system if its PSD is known. This study is concurrent with the worldwide spectrum-sharing studies requested by the International Telecommunication Union for WRC-19

    The Feasibility of Coexistence Between 5G and Existing Services in the IMT-2020 Candidate Bands in Malaysia

    Get PDF
    In 2015, the international telecommunication union (ITU) proposed 11 candidate millimeter-wave bands between 24 and 86 GHz for the deployment of future fifth mobile generation (5G) broadband systems. Furthermore, the ITU called for spectrum-sharing studies in these bands. Since 5G specifications are not yet defined, the utilization of radio spectrum by 5G mobile systems will assist in identifying these specifications. This paper introduces Malaysia as a case study for the deployment of 5G systems. This includes a discussion of the current status of the Malaysian telecommunication market. Then, we investigate the current services that are already deployed in the proposed bands. Our investigation shows that the fixed (F) service is the most deployed as a primary service in the candidate bands. For this reason, a preliminary spectrum-sharing study is conducted on the basis of a modified 5G spectrum-sharing model to evaluate the feasibility of coexistence between 5G and F services in the 28-GHz band. Our modified methodology can be used for spectrum-sharing studies between 5G and any other services for an initial spectrum-sharing investigation. The results show that the F service will be severely affected by the 5G system transition in the 28-GHz band, especially in the base station (BS)-to-BS sharing scenario. The best band from the perspective of current spectrum allocation for 5G systems is the 45-GHz (i.e., 45.5-47 GHz) band, since it is already reserved for mobile service for primary allocation and not utilized. This paper is carried out concurrently with current worldwide efforts investigating spectrum sharing, as requested by the ITU in agenda item 1.13 for the next world radio conference 2019

    Coexistence for LTE-advanced and FSS services in the 3.5GHz band in Colombia

    Get PDF
    The 3.5GHz band is an optimal candidate for 5G networks due to its propagation characteristics and massive bandwidth. However, services like the Fixed Satellite Service (FSS) are using this band in several countries. Therefore, this paper presents a coexistence study of the Long Term Evolution - Advanced (LTE-A) and FSS services in the 3500-3700 MHz in Colombia. Simulations were done in realistic scenarios in the city of Bogota, Colombia. Preliminary results show that critical scenarios are the ones from the LTE eNodeB (eNB) and Users Equipment (UE) nodes to the FSS earth stations. The study includes the analysis of Guard Bands (GB) and arrival angles into the Protection Distances (PD). Results show that the PD is highly dependent on the angle of the interfering signal and the GB used. The PD for a cochannel interference in a suburban scenario is higher than 250km, in the worst-case scenario, and could be reduced down to 17.5 km if a 25 MHz GB is included and the angular difference of the interfering LTE-A signal is 42 square. Moreover, our results show that the PD needed for interference from UE are 100 times less compared to the eNB ones

    Spectrum Utilisation and Management in Cognitive Radio Networks

    Get PDF

    Mobile Communication Networks and Digital Television Broadcasting Systems in the Same Frequency Bands – Advanced Co-Existence Scenarios

    Get PDF
    The increasing demand for wireless multimedia services provided by modern communication systems with stable services is a key feature of advanced markets. On the other hand, these systems can many times operate in a neighboring or in the same frequency bands. Therefore, numerous unwanted co-existence scenarios can occur. The aim of this paper is to summarize our results which were achieved during exploration and measurement of the co-existences between still used and upcoming mobile networks (from GSM to LTE) and digital terrestrial television broadcasting (DVB) systems. For all of these measurements and their evaluation universal measurement testbed has been proposed and used. Results presented in this paper are a significant part of our activities in work package WP5 in the ENIAC JU project “Agile RF Transceivers and Front-Ends for Future Smart Multi-Standard Communications Applications (ARTEMOS)”
    corecore