Risk assessment and relationship management: practical approach to supply chain risk management
The literature suggests the need for incorporating the risk construct into the measurement of organisational performance, although few examples are available as to how this might be undertaken in relation to supply chains. A conceptual framework for the development of performance and risk management within the supply chain is evolved from the literature and empirical evidence. The twin levels of dyadic performance/risk management and the management of a portfolio of performance/risks is addressed, employing Agency Theory to guide the analysis. The empirical evidence relates to the downstream management of dealerships by a large multinational organisation. Propositions are derived from the analysis relating to the issues and mechanisms that may be employed to effectively manage a portfolio of supply chain performance and risks
Managing design variety, process variety and engineering change: a case study of two capital good firms
Many capital good firms deliver products that are not strictly one-off, but instead share a certain degree of similarity with other deliveries. In the delivery of the product, they aim to balance stability and variety in their product design and processes. The issue of engineering change plays an important in how they manage to do so. Our aim is to gain more understanding into how capital good firms manage engineering change, design variety and process variety, and into the role of the product delivery strategies they thereby use. Product delivery strategies are defined as the type of engineering work that is done independent of an order and the specification freedom the customer has in the remaining part of the design. Based on the within-case and cross-case analysis of two capital good firms several mechanisms for managing engineering change, design variety and process variety are distilled. It was found that there exist different ways of (1) managing generic design information, (2) isolating large engineering changes, (3) managing process variety, (4) designing and executing engineering change processes. Together with different product delivery strategies these mechanisms can be placed within an archetypes framework of engineering change management. On one side of the spectrum capital good firms operate according to open product delivery strategies, have some practices in place to investigate design reuse potential, isolate discontinuous engineering changes into the first deliveries of the product, employ âprobe and learnâ process management principles in order to allow evolving insights to be accurately executed and have informal engineering change processes. On the other side of the spectrum capital good firms operate according to a closed product delivery strategy, focus on prevention of engineering changes based on design standards, need no isolation mechanisms for discontinuous engineering changes, have formal process management practices in place and make use of closed and formal engineering change procedures. The framework should help managers to (1) analyze existing configurations of product delivery strategies, product and process designs and engineering change management and (2) reconfigure any of these elements according to a âmisfitâ derived from the framework. Since this is one of the few in-depth empirical studies into engineering change management in the capital good sector, our work adds to the understanding on the various ways in which engineering change can be dealt with
Taming the âtrollsâ : major public projects in the making
Major projects are not yet sufficiently understood, and practices in project governance and project management do not yet reflect the current state of knowledge of large, complex projects. In an attempt to understand the reasons, the authors therefore investigated the latest relevant findings documented in three countries: the UK, Norway, and the Netherlands. Their examination of the effect of implementing governance frameworks for public projects in these countries indicates that efforts to improve major projects are giving rewards: Even if complex public projects, the âtrollsâ, become more challenging, efforts to âtameâ them are improving. The results of the study show that project planning has improved and cost overruns are reduced. However, recent observations indicate that the effect may wear off remarkably quickly. Hence, the need for continuous improvement and change is prominent. There are fundamental limitations in the use of formal systems as they cannot detect all problems and there are limitations to humans' ability in terms of optimism bias that cannot be eliminated
Recommended from our members
Enterprise portals: addressing the organisational and individual perspectives of information systems
Enterprise portals are being viewed as the next generation application platform of choice, offering benefits over both client/server and thin client arrangements. By providing a mediating layer between the information applications and resources of the organisation and the individuals using them, enterprise portals appear to provide a unique context to allow both the organisational and individual perspectives of information systems to be addressed. This study seeks to examine these often competing perspectives of information systems by using an exploratory empirical survey to investigate the actual deployment of enterprise portals within a range of different organisations. It is found that both the individual and organisational benefits that enterprise portals can offer appear to have been recognised, and coherent sets of services addressing each of these perspectives are being developed. Consistent with diffusion and acceptance of technology models, organisations appear to be commencing their portal developments with services that will ensure utilisation by individuals, and are subsequently seeking to realise organisational level benefits
Recommended from our members
Design of robust service operations using cybernetic principles and simulation
Information flows in a service organisation allow business units to co-ordinate their response to changes in the operating environment. Processes and interactions can be designed so that the right information flows to the right people, at the right time to make effective decisions regarding job priorities and allocation of limited resource. This paper develops an analysis framework and simulation approach to identify the internal information flows an organisation needs to âtune itselfâ for changing conditions, thus making itself more robust to uncertainties. The ideas are developed and illustrated through a case study with a major telecoms company.International Design Conference - DESIGN 201
Scientific progress despite irreproducibility: A seeming paradox
It appears paradoxical that science is producing outstanding new results and
theories at a rapid rate at the same time that researchers are identifying
serious problems in the practice of science that cause many reports to be
irreproducible and invalid. Certainly the practice of science needs to be
improved and scientists are now pursuing this goal. However, in this
perspective we argue that this seeming paradox is not new, has always been part
of the way science works, and likely will remain so. We first introduce the
paradox. We then review a wide range of challenges that appear to make
scientific success difficult. Next, we describe the factors that make science
work-in the past, present, and presumably also in the future. We then suggest
that remedies for the present practice of science need to be applied
selectively so as not to slow progress, and illustrate with a few examples. We
conclude with arguments that communication of science needs to emphasize not
just problems but the enormous successes and benefits that science has brought
and is now bringing to all elements of modern society.Comment: 3 figure
Choosing an organisational form: the case of collaborative procurement initiatives
This paper deals with different organisational forms of collaborative procurement and provides insight into when to use which form. Different forms from the literature are compared with empirical examples to give an overview of forms, which are then described in terms of strategy, skills and organisation. Whilst acknowledging variations, the paper distinguishes between two main forms: virtual networks and third-party organisations. Using empirical data and four theoretical perspectives (transaction cost economics, resource-based view, contingency theory, agency theory), the paper reflects on when which form can be used and presents an overall framework to help choose an organisational for
Unbundling dynamic capabilities for inter-organizational collaboration
Purpose
The purpose of this paper is to explore two distinct subsets of dynamic capabilities that need to be deployed when pursuing innovation through inter-organizational activities, respectively, in the contexts of broad networks and specific alliances. The authors draw distinctions and explore potential interdependencies between these two dynamic capability reservoirs, by integrating concepts from the theoretical perspectives they are derived from, but which have until now largely ignored each other â the social network perspective and the dynamic capabilities view.
Design/methodology/approach
The authors investigate nanotechnology-driven R&D activities in the 1995â2005 period for 76 publicly traded firms in the electronics and electrical equipment industry and in the chemicals and pharmaceuticals industry, that applied for 580 nanotechnology-related patents and engaged in 2,459 alliances during the observation period. The authors used zero-truncated Poisson regression as the estimation method.
Findings
The findings support conceptualizing dynamic capabilities as four distinct subsets, deployed for sensing or seizing purposes, and across the two different inter-organizational contexts. The findings also suggest potential synergies between these subsets of dynamic capabilities, with two subsets being more macro-oriented (i.e. sensing and seizing opportunities within networks) and the two other ones more micro-oriented (i.e. sensing and seizing opportunities within specific alliances).
Practical implications
The authors show that firms differ in their subsets of dynamic capabilities for pursuing different types of inter-organizational, boundary-spanning relationships (such as alliances vs broader network relationships), which ultimately affects their innovation performance.
Originality/value
The authors contribute to the growing body of work on dynamic capabilities and firm-specific advantages by unbundling the dynamic capability subsets, and investigating their complex interdependencies for managing different types of inter-organizational linkages. The main new insight is that the âlinear modelâ of generating more innovations through higher inter-firm collaboration in an emerging field paints an erroneous picture of how high innovation performance is actually achieved
Technical Debt Prioritization: State of the Art. A Systematic Literature Review
Background. Software companies need to manage and refactor Technical Debt
issues. Therefore, it is necessary to understand if and when refactoring
Technical Debt should be prioritized with respect to developing features or
fixing bugs. Objective. The goal of this study is to investigate the existing
body of knowledge in software engineering to understand what Technical Debt
prioritization approaches have been proposed in research and industry. Method.
We conducted a Systematic Literature Review among 384 unique papers published
until 2018, following a consolidated methodology applied in Software
Engineering. We included 38 primary studies. Results. Different approaches have
been proposed for Technical Debt prioritization, all having different goals and
optimizing on different criteria. The proposed measures capture only a small
part of the plethora of factors used to prioritize Technical Debt qualitatively
in practice. We report an impact map of such factors. However, there is a lack
of empirical and validated set of tools. Conclusion. We observed that technical
Debt prioritization research is preliminary and there is no consensus on what
are the important factors and how to measure them. Consequently, we cannot
consider current research conclusive and in this paper, we outline different
directions for necessary future investigations