5 research outputs found
Fuzzy net present value for engineering analysis
Cash flow analysis is one of the most popular methods for investigating the outcome of an economical project. The costs and benefits of a construction project are often involved with uncertainty and it is not possible to find a precise value for a particular project. In this paper, we present a simple method to calculate the net present value of a cash flow when both costs and benefits are given as triangular numbers. The proposed model of this paper uses Delphi method to figure out the fair values of all costs and revenues and then using fizzy programming techniques, it calculates the fuzzy net present value. The implementation of the proposed model is demonstrated using a simple example
Recommended from our members
Discrete flower pollination algorithm for resource constrained project scheduling problem
YesIn this paper, a new population-based and nature-inspired metaheuristic algorithm, Discrete Flower Pollination Algorithm (DFPA), is presented to solve the Resource Constrained Project Scheduling Problem (RCPSP). The DFPA is a modification of existing Flower Pollination Algorithm adapted for solving combinatorial optimization problems by changing some of the algorithm's core concepts, such as flower, global pollination, Lévy flight, local pollination. The proposed DFPA is then tested on sets of benchmark instances and its performance is compared against other existing metaheuristic algorithms. The numerical results have shown that the proposed algorithm is efficient and outperforms several other popular metaheuristic algorithms, both in terms of quality of the results and execution time. Being discrete, the proposed algorithm can be used to solve any other combinatorial optimization problems.Innovate UKAwarded 'Best paper of the Month
An overview of recent research results and future research avenues using simulation studies in project management
This paper gives an overview of three simulation studies in dynamic project scheduling integrating baseline scheduling with risk analysis and project control. This integration is known in the literature as dynamic scheduling. An integrated project control method is presented using a project control simulation approach that combines the three topics into a single decision support system. The method makes use of Monte Carlo simulations and connects schedule risk analysis (SRA) with earned value management (EVM). A corrective action mechanism is added to the simulation model to measure the efficiency of two alternative project control methods. At the end of the paper, a summary of recent and state-of-the-art results is given, and directions for future research based on a new research study are presented
Recommended from our members
Scheduling and Resource Efficiency Balancing. Discrete Species Conserving Cuckoo Search for Scheduling in an Uncertain Execution Environment
The main goal of a scheduling process is to decide when and how to execute each of the project’s activities. Despite large variety of researched scheduling problems, the majority of them can be described as generalisations of the resource-constrained project scheduling problem (RCPSP). Because of wide applicability and challenging difficulty, RCPSP has attracted vast amount of attention in the research community and great variety of heuristics have been adapted for solving it. Even though these heuristics are structurally different and operate according to diverse principles, they are designed to obtain only one solution at a time. In the recent researches on RCPSPs, it was proven that these kind of problems have complex multimodal fitness landscapes, which are characterised by a wide solution search spaces and presence of multiple local and global optima.
The main goal of this thesis is twofold. Firstly, it presents a variation of the RCPSP that considers optimisation of projects in an uncertain environment where resources are modelled to adapt to their environment and, as the result of this, improve their efficiency. Secondly, modification of a novel evolutionary computation method Cuckoo Search (CS) is proposed, which has been adapted for solving combinatorial optimisation problems and modified to obtain multiple solutions. To test the proposed methodology, two sets of experiments are carried out. Firstly, the developed algorithm is applied to a real-life software development project. Secondly, the performance of the algorithm is tested on universal benchmark instances for scheduling problems which were modified to take into account specifics of the proposed optimisation model. The results of both experiments demonstrate that the proposed methodology achieves competitive level of performance and is capable of finding multiple global solutions, as well as prove its applicability in real-life projects