    COMBINATION OF ACO AND PSO TO MINIMIZE MAKESPAN IN ORDERED FLOWSHOP SCHEDULING PROBLEMS

    Get PDF
    The problem of scheduling flowshop production is one of the most versatile problems and is often encountered in many industries. Effective scheduling is important because it has a significant impact on reducing costs and increasing productivity. However, solving the ordered flowshop scheduling problem with the aim of minimizing makespan requires a difficult computation known as NP-hard. This research will contribute to the application of combination ACO and PSO to minimize makespan in the ordered flowshop scheduling problem. The performance of the proposed scheduling algorithm is evaluated by testing the data set of 600 ordered flowshop scheduling problems with various combinations of job and machine size combinations. The test results show that the ACO-PSO algorithm is able to provide a better scheduling solution for the scheduling group with small dimensions, namely 76 instances from a total of 600 inctances and is not good at obtaining makespan in the scheduling group with large dimensions. The ACO-PSO algorithm uses execution time which increases as the dimension size (multiple jobs and many machines) increases in a scheduled instanc

    Scheduling flow lines with buffers by ant colony digraph

    Get PDF
    This work starts from modeling the scheduling of n jobs on m machines/stages as flowshop with buffers in manufacturing. A mixed-integer linear programing model is presented, showing that buffers of size n - 2 allow permuting sequences of jobs between stages. This model is addressed in the literature as non-permutation flowshop scheduling (NPFS) and is described in this article by a disjunctive graph (digraph) with the purpose of designing specialized heuristic and metaheuristics algorithms for the NPFS problem. Ant colony optimization (ACO) with the biologically inspired mechanisms of learned desirability and pheromone rule is shown to produce natively eligible schedules, as opposed to most metaheuristics approaches, which improve permutation solutions found by other heuristics. The proposed ACO has been critically compared and assessed by computation experiments over existing native approaches. Most makespan upper bounds of the established benchmark problems from Taillard (1993) and Demirkol, Mehta, and Uzsoy (1998) with up to 500 jobs on 20 machines have been improved by the proposed ACO

    Native metaheuristics for non-permutation flowshop scheduling

    Get PDF
    The most general flowshop scheduling problem is also addressed in the literature as non-permutation flowshop (NPFS). Current processors are able to cope with the combinatorial complexity of (n!)exp m. NPFS scheduling by metaheuristics. After briefly discussing the requirements for a manufacturing layout to be designed and modeled as non-permutation flowshop, a disjunctive graph (digraph) approach is used to build native solutions. The implementation of an Ant Colony Optimization (ACO) algorithm has been described in detail; it has been shown how the biologically inspired mechanisms produce eligible schedules, as opposed to most metaheuristics approaches, which improve permutation solutions. ACO algorithms are an example of native non-permutation (NNP) solutions of the flowshop scheduling problem, opening a new perspective on building purely native approaches. The proposed NNP-ACO has been assessed over existing native approaches improving most makespan upper bounds of the benchmark problems from Demirkol et al. (1998)

    New efficient constructive heuristics for the hybrid flowshop to minimise makespan: A computational evaluation of heuristics

    Get PDF
    This paper addresses the hybrid flow shop scheduling problem to minimise makespan, a well-known scheduling problem for which many constructive heuristics have been proposed in the literature. Nevertheless, the state of the art is not clear due to partial or non homogeneous comparisons. In this paper, we review these heuristics and perform a comprehensive computational evaluation to determine which are the most efficient ones. A total of 20 heuristics are implemented and compared in this study. In addition, we propose four new heuristics for the problem. Firstly, two memory-based constructive heuristics are proposed, where a sequence is constructed by inserting jobs one by one in a partial sequence. The most promising insertions tested are kept in a list. However, in contrast to the Tabu search, these insertions are repeated in future iterations instead of forbidding them. Secondly, we propose two constructive heuristics based on Johnson’s algorithm for the permutation flowshop scheduling problem. The computational results carried out on an extensive testbed show that the new proposals outperform the existing heuristics.Ministerio de Ciencia e Innovación DPI2016-80750-

    Nonpermutation flow line scheduling by ant colony optimization

    Get PDF
    A flow line is a conventional manufacturing system where all jobs must be processed on all machines with the same operation sequence. Line buffers allow nonpermutation flowshop scheduling and job sequences to be changed on different machines. A mixed-integer linear programming model for nonpermutation flowshop scheduling and the buffer requirement along with manufacturing implication is proposed. Ant colony optimization based heuristic is evaluated against Taillard's (1993) well-known flowshop benchmark instances, with 20 to 500 jobs to be processed on 5 to 20 machines (stages). Computation experiments show that the proposed algorithm is incumbent to the state-of-the-art ant colony optimization for flowshop with higher job to machine ratios, using the makespan as the optimization criterion

    An estimation of distribution algorithm for combinatorial optimization problems

    Get PDF
    This paper considers solving more than one combinatorial problem considered some of the most difficult to solve in the combinatorial optimization field, such as the job shop scheduling problem (JSSP), the vehicle routing problem with time windows (VRPTW), and the quay crane scheduling problem (QCSP). A hybrid metaheuristic algorithm that integrates the Mallows model and the Moth-flame algorithm solves these problems. Through an exponential function, the Mallows model emulates the solution space distribution for the problems; meanwhile, the Moth-flame algorithm is in charge of determining how to produce the offspring by a geometric function that helps identify the new solutions. The proposed metaheuristic, called HEDAMMF (Hybrid Estimation of Distribution Algorithm with Mallows model and Moth-Flame algorithm), improves the performance of recent algorithms. Although knowing the algebra of permutations is required to understand the proposed metaheuristic, utilizing the HEDAMMF is justified because certain problems are fixed differently under different circumstances. These problems do not share the same objective function (fitness) and/or the same constraints. Therefore, it is not possible to use a single model problem. The aforementioned approach is able to outperform recent algorithms under different metrics for these three combinatorial problems. Finally, it is possible to conclude that the hybrid metaheuristics have a better performance, or equal in effectiveness than recent algorithms
    • …