9 research outputs found

    An investigation of changeover sensitive heuristics in an industrial job shop environment

    Get PDF
    EThOS - Electronic Theses Online ServiceGBUnited Kingdo

    A re-entrant flowshop heuristic for online scheduling of the paper path in a large scale printer

    No full text
    A Large Scale Printer (LSP) is a Cyber Physical System (CPS) printing thousands of sheets per day with high quality. The print requests arrive at run-time requiring online scheduling. We capture the LSP scheduling problem as online scheduling of re-entrant flowshops with sequence dependent setup times and relative due dates with makespan minimization as the scheduling criterion. Exhaustive approaches like Mixed Integer Programming can be used, but they are compute intensive and not suited for online use. We present a novel heuristic for scheduling of LSPs that on average requires 0.3 seconds per sheet to find schedules for industrial test cases. We compare the schedules to lower bounds, to schedules generated by the current scheduler and schedules generated by a modified version of the classical NEH (MNEH) heuristic [1], [2]. On average, the proposed heuristic generates schedules that are 40% shorter than the current scheduler, have an average difference of 25% compared to the estimated lower bounds and generates schedules with less than 67% of the makespan of schedules generated by the MNEH heuristic

    A Re-entrant Flowshop Heuristic for Online Scheduling of the Paper Path in a Large Scale Printer

    No full text
    A Large Scale Printer (LSP) is a Cyber Physical System (CPS) printing thousands of sheets per day with high quality. The print requests arrive at run-time requiring online scheduling. We capture the LSP scheduling problem as online scheduling of re-entrant flowshops with sequence dependent setup times and relative due dates with makespan minimization as the scheduling criterion. Exhaustive approaches like Mixed Integer Programming can be used, but they are compute intensive and not suited for online use. We present a novel heuristic for scheduling of LSPs that on average requires 0.3 seconds per sheet to find schedules for industrial test cases. We compare the schedules to lower bounds, to schedules generated by the current scheduler and schedules generated by a modified version of the classical NEH (MNEH) heuristic [1], [2]. On average, the proposed heuristic generates schedules that are 40% shorter than the current scheduler, have an average difference of 25% compared to the estimated lower bounds and generates schedules with less than 67% of the makespan of schedules generated by the MNEH heuristic

    International Workshop on MicroFactories (IWMF 2012): 17th-20th June 2012 Tampere Hall Tampere, Finland

    Get PDF
    This Workshop provides a forum for researchers and practitioners in industry working on the diverse issues of micro and desktop factories, as well as technologies and processes applicable for micro and desktop factories. Micro and desktop factories decrease the need of factory floor space, and reduce energy consumption and improve material and resource utilization thus strongly supporting the new sustainable manufacturing paradigm. They can be seen also as a proper solution to point-of-need manufacturing of customized and personalized products near the point of need

    13th International Conference on Modeling, Optimization and Simulation - MOSIM 2020

    Get PDF
    Comité d’organisation: Université Internationale d’Agadir – Agadir (Maroc) Laboratoire Conception Fabrication Commande – Metz (France)Session RS-1 “Simulation et Optimisation” / “Simulation and Optimization” Session RS-2 “Planification des Besoins Matières Pilotée par la Demande” / ”Demand-Driven Material Requirements Planning” Session RS-3 “Ingénierie de Systèmes Basées sur les Modèles” / “Model-Based System Engineering” Session RS-4 “Recherche Opérationnelle en Gestion de Production” / "Operations Research in Production Management" Session RS-5 "Planification des Matières et des Ressources / Planification de la Production” / “Material and Resource Planning / Production Planning" Session RS-6 “Maintenance Industrielle” / “Industrial Maintenance” Session RS-7 "Etudes de Cas Industriels” / “Industrial Case Studies" Session RS-8 "Données de Masse / Analyse de Données” / “Big Data / Data Analytics" Session RS-9 "Gestion des Systèmes de Transport” / “Transportation System Management" Session RS-10 "Economie Circulaire / Développement Durable" / "Circular Economie / Sustainable Development" Session RS-11 "Conception et Gestion des Chaînes Logistiques” / “Supply Chain Design and Management" Session SP-1 “Intelligence Artificielle & Analyse de Données pour la Production 4.0” / “Artificial Intelligence & Data Analytics in Manufacturing 4.0” Session SP-2 “Gestion des Risques en Logistique” / “Risk Management in Logistics” Session SP-3 “Gestion des Risques et Evaluation de Performance” / “Risk Management and Performance Assessment” Session SP-4 "Indicateurs Clés de Performance 4.0 et Dynamique de Prise de Décision” / ”4.0 Key Performance Indicators and Decision-Making Dynamics" Session SP-5 "Logistique Maritime” / “Marine Logistics" Session SP-6 “Territoire et Logistique : Un Système Complexe” / “Territory and Logistics: A Complex System” Session SP-7 "Nouvelles Avancées et Applications de la Logique Floue en Production Durable et en Logistique” / “Recent Advances and Fuzzy-Logic Applications in Sustainable Manufacturing and Logistics" Session SP-8 “Gestion des Soins de Santé” / ”Health Care Management” Session SP-9 “Ingénierie Organisationnelle et Gestion de la Continuité de Service des Systèmes de Santé dans l’Ere de la Transformation Numérique de la Société” / “Organizational Engineering and Management of Business Continuity of Healthcare Systems in the Era of Numerical Society Transformation” Session SP-10 “Planification et Commande de la Production pour l’Industrie 4.0” / “Production Planning and Control for Industry 4.0” Session SP-11 “Optimisation des Systèmes de Production dans le Contexte 4.0 Utilisant l’Amélioration Continue” / “Production System Optimization in 4.0 Context Using Continuous Improvement” Session SP-12 “Défis pour la Conception des Systèmes de Production Cyber-Physiques” / “Challenges for the Design of Cyber Physical Production Systems” Session SP-13 “Production Avisée et Développement Durable” / “Smart Manufacturing and Sustainable Development” Session SP-14 “L’Humain dans l’Usine du Futur” / “Human in the Factory of the Future” Session SP-15 “Ordonnancement et Prévision de Chaînes Logistiques Résilientes” / “Scheduling and Forecasting for Resilient Supply Chains

    Accountants\u27 index. Twenty-fourth supplement, January-December 1975

    Get PDF
    https://egrove.olemiss.edu/aicpa_accind/1026/thumbnail.jp
    corecore