38,737 research outputs found

    Strategies for COVID-19 Pandemic Recovery. Applying Engineering Asset Management Principles

    Get PDF
    VersiĂłn preprint permitida por el editor Elsevier para subir a repositorios: http://sherpa.ac.uk/romeo/issn/2468-2667/es/Current COVID-19 pandemic available data for Spain, Andalusia an its eight provinces have been analyzed. Utilizing a model recently published to predict pandemic behavior, confinement measures and their economic impact are analyzed. Applying principles for effective and efficient management of engineering assets, decision-making implications of establishing confinement at national, regional or local (province) level are analyzed. The quarantine time is formulated as a function of the delay in taking confinement measures in the territories. The delay is measured in time since the free expansion in the territory is observed. Results discussions and analysis help to formulate a recommended strategy that is presented in the paper. We aim for: (i) design action plans by local level but(ii) controlled centralized by a unique decisionmaking center considering by country. Benefits of that strategy are measured in quarantine times beside GDP loss toll recovery. The strategy would be even more convenient when tackling with successive waves of the pandemic, requesting immediate action on local relapse

    Software Measurement Activities in Small and Medium Enterprises: an Empirical Assessment

    Get PDF
    An empirical study for evaluating the proper implementation of measurement/metric programs in software companies in one area of Turkey is presented. The research questions are discussed and validated with the help of senior software managers (more than 15 years’ experience) and then used for interviewing a variety of medium and small scale software companies in Ankara. Observations show that there is a common reluctance/lack of interest in utilizing measurements/metrics despite the fact that they are well known in the industry. A side product of this research is that internationally recognized standards such as ISO and CMMI are pursued if they are a part of project/job requirements; without these requirements, introducing those standards to the companies remains as a long-term target to increase quality

    Development of an ontology supporting failure analysis of surface safety valves used in Oil & Gas applications

    Get PDF
    Treball desenvolupat dins el marc del programa 'European Project Semester'.The project describes how to apply Root Cause Analysis (RCA) in the form of a Failure Mode Effect and Criticality Analysis (FMECA) on hydraulically actuated Surface Safety Valves (SSVs) of Xmas trees in oil and gas applications, in order to be able to predict the occurrence of failures and implement preventive measures such as Condition and Performance Monitoring (CPM) to improve the life-span of a valve and decrease maintenance downtime. In the oil and gas industry, valves account for 52% of failures in the system. If these failures happen unexpectedly it can cause a lot of problems. Downtime of the oil well quickly becomes an expensive problem, unscheduled maintenance takes a lot of extra time and the lead-time for replacement parts can be up to 6 months. This is why being able to predict these failures beforehand is something that can bring a lot of benefits to a company. To determine the best course of action to take in order to be able to predict failures, a FMECA report is created. This is an analysis where all possible failures of all components are catalogued and given a Risk Priority Number (RPN), which has three variables: severity, detectability and occurrence. Each of these is given a rating between 0 and 10 and then the variables are multiplied with each other, resulting in the RPN. The components with an RPN above an acceptable risk level are then further investigated to see how to be able to detect them beforehand and how to mitigate the risk that they pose. Applying FMECA to the SSV mean breaking the system down into its components and determining the function, dependency and possible failures. To this end, the SSV is broken up into three sub-systems: the valve, the actuator and the hydraulic system. The hydraulic system is the sub-system of the SSV responsible for containing, transporting and pressurizing of the hydraulic fluid and in turn, the actuator. It also contains all the safety features, such as pressure pilots, and a trip system in case a problem is detected in the oil line. The actuator is, as the name implies, the sub-system which opens and closes the valve. It is made up of a number of parts such as a cylinder, a piston and a spring. These parts are interconnected in a number of ways to allow the actuator to successfully perform its function. The valve is the actual part of the system which interacts with the oil line by opening and closing. Like the actuator, this sub-system is broken down into a number of parts which work together to perform its function. After breaking down and defining each subsystem on a functional level, a model was created using a functional block diagram. Each component also allows for the defining of dependencies and interactions between the different components and a failure diagram for each component. This model integrates the three sub-systems back into one, creating a complete picture of the entire system which can then be used to determine the effects of different failures in components to the rest of the system. With this model completed we created a comprehensive FMECA report and test the different possible CPM solutions to mitigate the largest risks

    A Process to Implement an Artificial Neural Network and Association Rules Techniques to Improve Asset Performance and Energy Efficiency

    Get PDF
    In this paper, we address the problem of asset performance monitoring, with the intention of both detecting any potential reliability problem and predicting any loss of energy consumption e ciency. This is an important concern for many industries and utilities with very intensive capitalization in very long-lasting assets. To overcome this problem, in this paper we propose an approach to combine an Artificial Neural Network (ANN) with Data Mining (DM) tools, specifically with Association Rule (AR) Mining. The combination of these two techniques can now be done using software which can handle large volumes of data (big data), but the process still needs to ensure that the required amount of data will be available during the assets’ life cycle and that its quality is acceptable. The combination of these two techniques in the proposed sequence di ers from previous works found in the literature, giving researchers new options to face the problem. Practical implementation of the proposed approach may lead to novel predictive maintenance models (emerging predictive analytics) that may detect with unprecedented precision any asset’s lack of performance and help manage assets’ O&M accordingly. The approach is illustrated using specific examples where asset performance monitoring is rather complex under normal operational conditions.Ministerio de Economía y Competitividad DPI2015-70842-

    Multi-criteria decision making support tools for maintenance of marine machinery systems

    Get PDF
    PhD ThesisFor ship systems to remain reliable and safe they must be effectively maintained through a sound maintenance management system. The three major elements of maintenance management systems are; risk assessment, maintenance strategy selection and maintenance task interval determination. The implementation of these elements will generally determine the level of ship system safety and reliability. Reliability Centred Maintenance (RCM) is one method that can be used to optimise maintenance management systems. However the tools used within the framework of the RCM methodology have limitations which may compromise the efficiency of RCM in achieving the desired results. This research presents the development of tools to support the RCM methodology and improve its effectiveness in marine maintenance system applications. Each of the three elements of the maintenance management system has been considered in turn. With regard to risk assessment, two Multi-Criteria Decision Making techniques (MCDM); Vlsekriterijumska Optimizacija Ikompromisno Resenje, meaning: Multi-criteria Optimization and Compromise Solution (VIKOR) and Compromise Programming (CP) have been integrated into Failure Mode and Effects Analysis (FMEA) along with a novel averaging technique which allows the use of incomplete or imprecise failure data. Three hybrid MCDM techniques have then been compared for maintenance strategy selection; an integrated Delphi-Analytical Hierarchy Process (AHP) methodology, an integrated Delphi-AHP-PROMETHEE (Preference Ranking Organisation METHod for Enrichment Evaluation) methodology and an integrated Delphi-AHP-TOPSIS (Technique for Order Preference by Similarity to Ideal Solution) methodology. Maintenance task interval determination has been implemented using a MCDM framework integrating a delay time model to determine the optimum inspection interval and using the age replacement model for the scheduled replacement tasks. A case study based on a marine Diesel engine has been developed with input from experts in the field to demonstrate the effectiveness of the proposed methodologies.Tertiary Education Trust Fund (TETFUND), a scholarship body of the Federal Republic of Nigeria for providing the fund for this research. My gratitude also goes to Federal University of Petroleum Resource, Effurun, Nigeria for giving me the opportunity to be a beneficiary of the scholarship

    Multi-objective model for optimizing railway infrastructure asset renewal

    Get PDF
    Trabalho inspirado num problema real da empresa Infraestruturas de Portugal, EP.A multi-objective model for managing railway infrastructure asset renewal is presented. The model aims to optimize three objectives, while respecting operational constraints: levelling investment throughout multiple years, minimizing total cost and minimizing work start postponements. Its output is an optimized intervention schedule. The model is based on a case study from a Portuguese infrastructure management company, which specified the objectives and constraints, and reflects management practice on railway infrastructure. The results show that investment levelling greatly influences the other objectives and that total cost fluctuations may range from insignificant to important, depending on the condition of the infrastructure. The results structure is argued to be general and suggests a practical methodology for analysing trade-offs and selecting a solution for implementation.info:eu-repo/semantics/publishedVersio

    Supporting group maintenance through prognostics-enhanced dynamic dependability prediction

    Get PDF
    Condition-based maintenance strategies adapt maintenance planning through the integration of online condition monitoring of assets. The accuracy and cost-effectiveness of these strategies can be improved by integrating prognostics predictions and grouping maintenance actions respectively. In complex industrial systems, however, effective condition-based maintenance is intricate. Such systems are comprised of repairable assets which can fail in different ways, with various effects, and typically governed by dynamics which include time-dependent and conditional events. In this context, system reliability prediction is complex and effective maintenance planning is virtually impossible prior to system deployment and hard even in the case of condition-based maintenance. Addressing these issues, this paper presents an online system maintenance method that takes into account the system dynamics. The method employs an online predictive diagnosis algorithm to distinguish between critical and non-critical assets. A prognostics-updated method for predicting the system health is then employed to yield well-informed, more accurate, condition-based suggestions for the maintenance of critical assets and for the group-based reactive repair of non-critical assets. The cost-effectiveness of the approach is discussed in a case study from the power industry

    CSL model checking of Deterministic and Stochastic Petri Nets

    Get PDF
    Deterministic and Stochastic Petri Nets (DSPNs) are a widely used high-level formalism for modeling discrete-event systems where events may occur either without consuming time, after a deterministic time, or after an exponentially distributed time. The underlying process dened by DSPNs, under certain restrictions, corresponds to a class of Markov Regenerative Stochastic Processes (MRGP). In this paper, we investigate the use of CSL (Continuous Stochastic Logic) to express probabilistic properties, such a time-bounded until and time-bounded next, at the DSPN level. The verication of such properties requires the solution of the steady-state and transient probabilities of the underlying MRGP. We also address a number of semantic issues regarding the application of CSL on MRGP and provide numerical model checking algorithms for this logic. A prototype model checker, based on SPNica, is also described

    Power system security enhancement by HVDC links using a closed-loop emergency control

    Get PDF
    In recent years, guaranteeing that large-scale interconnected systems operate safely, stably and economically has become a major and emergency issue. A number of high profile blackouts caused by cascading outages have focused attention on this issue. Embedded HVDC (High Voltage Direct Current) links within a larger AC power system are known to act as a “firewall” against cascading disturbances and therefore, can effectively contribute in preventing blackouts. A good example is the 2003 blackout in USA and Canada, where the Québec grid was not affected due to its HVDC interconnection. In the literature, many works have studied the impact of HVDC on the power system stability, but very few examples exist in the area of its impact on the system security. This paper presents a control strategy for HVDC systems to increase their contribution to system security. A real-time closed-loop control scheme is used to modulate the DC power of HVDC links to alleviate AC system overloads and improve system security. Simulations carried out on a simplified model of the Hydro-Québec network show that the proposed method works well and can greatly improve system security during emergency situations.Peer reviewedFinal Accepted Versio
    • …
    corecore