2 research outputs found

    An effective hybrid ant lion algorithm to minimize mean tardiness on permutation flow shop scheduling problem

    Get PDF
    This article aimed to develop an improved Ant Lion algorithm. The objective function was to minimize the mean tardiness on the flow shop scheduling problem with a focus on the permutation flow shop problem (PFSP). The Hybrid Ant Lion Optimization Algorithm (HALO) with local strategy was proposed, and from the total search of the agent, the NEH-EDD algorithm was applied. Moreover, the diversity of the nominee schedule was improved through the use of swap mutation, flip, and slide to determine the best solution in each iteration. Finally, the HALO was compared with some algorithms, while some numerical experiments were used to show the performances of the proposed algorithms. It is important to note that comparative analysis has been previously conducted using the nine variations of the PFSSP problem, and the HALO obtained was compared to other algorithms based on numerical experiments

    Exploring the benefits of scheduling with advanced and real-time information integration in Industry 4.0: A computational study

    Get PDF
    The technological advances recently brought to the manufacturing arena (collectively known as Industry 4.0) offer huge possibilities to improve decision-making processes in the shop floor by enabling the integration of information in real-time. Among these processes, scheduling is often cited as one of the main beneficiaries, given its data-intensive and dynamic nature. However, in view of the extremely high implementation costs of Industry 4.0, these potential benefits should be properly assessed, also taking into account that there are different approaches and solution procedures that can be employed in the scheduling decision-making process, as well as several information sources (i.e. not only shop floor status data, but also data from upstream/downstream processes). In this paper, we model various decision-making scenarios in a shop floor with different degrees of uncertainty and diverse efficiency measures, and carry out a computational experience to assess how real-time and advance information can be advantageously integrated in the Industry 4.0 context. The extensive computational experiments (equivalent to 6.3 years of CPU time) show that the benefits of using real-time, integrated shop floor data and advance information heavily depend on the proper choice of both the scheduling approach and the solution procedures, and that there are scenarios where this usage is even counterproductive. The results of the paper provide some starting points for future research regarding the design of approaches and solution procedures that allow fully exploiting the technological advances of Industry 4.0 for decision-making in scheduling.Ministerio de Ciencia e Innovación PID2019-108756RB-I0Junta de Andalucía P18-FR-1149, 5835 and US-12645
    corecore